Construction Scheduling Principles Practices by Newitt Jay (15 results)

- Hardcover
Seller: Goodwill Books, Hillsboro, OR, U.S.A.Goodwill Books
Contact seller5-star sellerCondition: Used - Fair
£ 43.76
£ 3.02 shippingShips within U.S.A.Quantity: 1 available
Condition: acceptable. Fairly worn, but readable and intact. If applicable: Dust jacket, disc or access code may not be included.

- Hardcover
Seller: -OnTimeBooks-, Phoenix, AZ, U.S.A.-OnTimeBooks-
Contact seller5-star sellerCondition: Used - Good
£ 68.64
Free ShippingShips within U.S.A.Quantity: 1 available
Condition: good. A copy that has been read, remains in good condition. All pages are intact, and the cover is intact. The spine and cover show signs of wear. Pages can include notes and highlighting and show signs of wear, and the copy can include "From the library of" labels or previous owner inscriptions. 100% GUARANTEE! Shipped with delivery confirmation, if you're not satisfied with purchase please return item! Ships via media mail.…

- Hardcover
Seller: HPB-Red, Dallas, TX, U.S.A.HPB-Red
Contact seller5-star sellerCondition: Used - Good
£ 66.27
£ 2.84 shippingShips within U.S.A.Quantity: 1 available
hardcover. Condition: Good. Connecting readers with great books since 1972! Used textbooks may not include companion materials such as access codes, etc. May have some wear or writing/highlighting. We ship orders daily and Customer Service is our top priority.

- Hardcover
Seller: Anybook.com, Lincoln, United KingdomAnybook.com
Contact seller5-star sellerCondition: Used - Poor
£ 59.00
£ 13.04 shippingShips from United Kingdom to U.S.A.Quantity: 1 available
Condition: Poor. This is an ex-library book and may have the usual library/used-book markings inside.This book has hardback covers. In poor condition, suitable as a reading copy. No dust jacket. CD missing . Please note the Image in this listing is a stock photo and may not match the covers of the actual item,950grams, ISBN:9780131133372.…

- Hardcover
Seller: Anybook.com, Lincoln, United KingdomAnybook.com
Contact seller5-star sellerCondition: Used - Fair
£ 84.32
£ 31.98 shippingShips from United Kingdom to U.S.A.Quantity: 1 available
Condition: Fair. This is an ex-library book and may have the usual library/used-book markings inside.This book has hardback covers. In fair condition, suitable as a study copy. No dust jacket. Please note the Image in this listing is a stock photo and may not match the covers of the actual item,850grams, ISBN:9780135137826.…

- Hardcover
Seller: Textbook Bookie, Little Rock, AR, U.S.A.Textbook Bookie
Contact seller4-star sellerCondition: Used - Fair
£ 129.03
£ 3.22 shippingShips within U.S.A.Quantity: 1 available
Hardcover. Condition: Fair. Book in Fair condition.

- Hardcover
Seller: World of Books (was SecondSale), Montgomery, IL, U.S.A.World of Books (was SecondSale)
Contact seller5-star sellerCondition: Used - Good
£ 146.42
Free ShippingShips within U.S.A.Quantity: 1 available
Hardback. Condition: Good. This text is a comprehensive, stand alone reference for project management scheduling. It features a unique combination of principles/fundamentals of scheduling and project management along with practical applications and tutorials of the 4 most common scheduling software programs?Microsoft Project, Primavera Project Planner (P3), SureTrak, P6 Project Manager and Contractor. Having scheduling information and software instructions in one book obviates the need for two texts, and the exercises and examples in the scheduling portion are tied to the same exercises in the software portions.…

- Hardcover
Seller: World of Books Inc, Montgomery, IL, U.S.A.World of Books Inc
Contact seller4-star sellerCondition: Used - Good
£ 153.75
Free ShippingShips within U.S.A.Quantity: 1 available
Hardback. Condition: Good. This text is a comprehensive, stand alone reference for project management scheduling. It features a unique combination of principles/fundamentals of scheduling and project management along with practical applications and tutorials of the 4 most common scheduling software programs?Microsoft Project, Primavera Project Planner (P3), SureTrak, P6 Project Manager and Contractor. Having scheduling information and software instructions in one book obviates the need for two texts, and the exercises and examples in the scheduling portion are tied to the same exercises in the software portions.…

- Hardcover
Seller: DeckleEdge LLC, Albuquerque, NM, U.S.A.DeckleEdge LLC
Contact seller5-star sellerCondition: New
£ 194.99
Free ShippingShips within U.S.A.Quantity: 1 available
hardcover. Condition: new.

- Hardcover
Seller: GreatBookPrices, Columbia, MD, U.S.A.GreatBookPrices
Contact seller5-star sellerCondition: New
£ 239.37
£ 2.00 shippingShips within U.S.A.Quantity: 1 available
Condition: New.

- Hardcover
Seller: GreatBookPrices, Columbia, MD, U.S.A.GreatBookPrices
Contact seller5-star sellerCondition: Used - As new
£ 252.53
£ 2.00 shippingShips within U.S.A.Quantity: Over 20 available
Condition: As New. Unread book in perfect condition.

- Hardcover
Seller: GreatBookPricesUK, Woodford Green, United KingdomGreatBookPricesUK
Contact seller5-star sellerCondition: New
£ 237.73
£ 15.00 shippingShips from United Kingdom to U.S.A.Quantity: Over 20 available
Condition: New.

- Hardcover
Seller: GreatBookPricesUK, Woodford Green, United KingdomGreatBookPricesUK
Contact seller5-star sellerCondition: Used - As new
£ 250.40
£ 15.00 shippingShips from United Kingdom to U.S.A.Quantity: Over 20 available
Condition: As New. Unread book in perfect condition.

- Hardcover
Seller: AHA-BUCH GmbH, Einbeck, GermanyAHA-BUCH GmbH
Contact seller5-star sellerCondition: New
£ 332.15
£ 29.57 shippingShips from Germany to U.S.A.Quantity: 2 available
Buch. Condition: Neu. Neuware - For undergraduate and graduate level courses in Construction Scheduling and Project Management.

- Hardcover
- Print on Demand
Seller: YESIBOOKSTORE, MIAMI, FL, U.S.A.YESIBOOKSTORE
Contact seller4-star sellerCondition: Used - As new
£ 119.71
Free ShippingShips within U.S.A.Quantity: 1 available
hardcover. Condition: As New. This item is printed on demand.