Beyond Risk Mitigation Integrating by Class (9 results)

- Softcover
Seller: GreatBookPrices, Columbia, MD, U.S.A.GreatBookPrices
Contact seller5-star sellerCondition: New
£ 16.41
£ 1.97 shippingShips within U.S.A.Quantity: Over 20 available
Condition: New.

- Softcover
Seller: BargainBookStores, Grand Rapids, MI, U.S.A.BargainBookStores
Contact seller5-star sellerCondition: New
£ 18.45
Free ShippingShips within U.S.A.Quantity: 5 available
Paperback or Softback. Condition: New. Beyond Risk Mitigation: Integrating Value Management for Successful Construction Projects. Book.

- Softcover
Seller: GreatBookPrices, Columbia, MD, U.S.A.GreatBookPrices
Contact seller5-star sellerCondition: Used - As new
£ 18.15
£ 1.97 shippingShips within U.S.A.Quantity: Over 20 available
Condition: As New. Unread book in perfect condition.

- Softcover
Seller: GreatBookPricesUK, Woodford Green, United KingdomGreatBookPricesUK
Contact seller5-star sellerCondition: Used - As new
£ 23.95
£ 15.00 shippingShips from United Kingdom to U.S.A.Quantity: Over 20 available
Condition: As New. Unread book in perfect condition.

- Softcover
Seller: GreatBookPricesUK, Woodford Green, United KingdomGreatBookPricesUK
Contact seller5-star sellerCondition: New
£ 27.03
£ 15.00 shippingShips from United Kingdom to U.S.A.Quantity: Over 20 available
Condition: New.

- Softcover
- Print on Demand
Seller: BuchWeltWeit Ludwig Meier e.K., Bergisch Gladbach, , GermanyBuchWeltWeit Ludwig Meier e.K.
Contact seller5-star sellerCondition: New
£ 23.57
£ 19.87 shippingShips from Germany to U.S.A.Quantity: 2 available
Taschenbuch. Condition: Neu. This item is printed on demand - it takes 3-4 days longer - Neuware -Value management is described as a method used in the construction design process to identify or establish the value system of the client and it also serves to ensure that the client values are communicated and understood by the pro…ject team (Green, 1991). Value Management (VM) evolved from Value Engineering (VE), which places significant emphasis on optimising the function of an asset in terms of lowest cost while the VM methodology consists of a number of steps which examine the functional requirements of the client through a process of analysis and then synthesises a suitable design that offers the best value and meets the functional requirements of the client (Thiry, 1997; PMI, 2015). This study endeavored to provide a clear distinction between VE and VM because these terms are mostly applied by different scholars interchangeably. It is for this purpose that the researcher further emphasised that only VM was adopted for use in this study. It is also asserted that Value Management is different from value Engineering in that VM is aimed at the optimisation of solutions in the establishment of suitable decision frameworks for the rest of the project which is achieved through the use of a structured decision model that originates in Multi-Attribute Utility Theory (Green, 1994). A project is a once-off activity, with one chance to achieve a satisfactory outcome and this necessitates the establishment of unambiguous objectives. Value Management identifies the option which gives the best value for money in accordance with the set criteria (Hiley and Paliokostas, 2001). 132 pp. Englisch.

- Softcover
- Print on Demand
Seller: moluna, Greven, , Germanymoluna
Contact seller5-star sellerCondition: New
£ 23.57
£ 42.33 shippingShips from Germany to U.S.A.Quantity: Over 20 available
Condition: New. Dieser Artikel ist ein Print on Demand Artikel und wird nach Ihrer Bestellung fuer Sie gedruckt. Value management is described as a method used in the construction design process to identify or establish the value system of the client and it also serves to ensure that the client values are communicated and unders…tood by the project team (Green, 1991). .

- Softcover
- Print on Demand
Seller: buchversandmimpf2000, Emtmannsberg, BAYE, Germanybuchversandmimpf2000
Contact seller5-star sellerCondition: New
£ 23.57
£ 51.84 shippingShips from Germany to U.S.A.Quantity: 1 available
Taschenbuch. Condition: Neu. This item is printed on demand - Print on Demand Titel. Neuware -Value management is described as a method used in the construction design process to identify or establish the value system of the client and it also serves to ensure that the client values are communicated and understood by the project… team (Green, 1991). Value Management (VM) evolved from Value Engineering (VE), which places significant emphasis on optimising the function of an asset in terms of lowest cost while the VM methodology consists of a number of steps which examine the functional requirements of the client through a process of analysis and then synthesises a suitable design that offers the best value and meets the functional requirements of the client (Thiry, 1997; PMI, 2015). This study endeavored to provide a clear distinction between VE and VM because these terms are mostly applied by different scholars interchangeably. It is for this purpose that the researcher further emphasised that only VM was adopted for use in this study. It is also asserted that Value Management is different from value Engineering in that VM is aimed at the optimisation of solutions in the establishment of suitable decision frameworks for the rest of the project which is achieved through the use of a structured decision model that originates in Multi-Attribute Utility Theory (Green, 1994). A project is a once-off activity, with one chance to achieve a satisfactory outcome and this necessitates the establishment of unambiguous objectives. Value Management identifies the option which gives the best value for money in accordance with the set criteria (Hiley and Paliokostas, 2001).tredition, Heinz-Beusen-Stieg 5, 22926 Ahrensburg 132 pp. Englisch.

- Softcover
- Print on Demand
Seller: AHA-BUCH GmbH, Einbeck, GermanyAHA-BUCH GmbH
Contact seller5-star sellerCondition: New
£ 23.57
£ 52.86 shippingShips from Germany to U.S.A.Quantity: 1 available
Taschenbuch. Condition: Neu. nach der Bestellung gedruckt Neuware - Printed after ordering - Value management is described as a method used in the construction design process to identify or establish the value system of the client and it also serves to ensure that the client values are communicated and understood by the project…team (Green, 1991). Value Management (VM) evolved from Value Engineering (VE), which places significant emphasis on optimising the function of an asset in terms of lowest cost while the VM methodology consists of a number of steps which examine the functional requirements of the client through a process of analysis and then synthesises a suitable design that offers the best value and meets the functional requirements of the client (Thiry, 1997; PMI, 2015). This study endeavored to provide a clear distinction between VE and VM because these terms are mostly applied by different scholars interchangeably. It is for this purpose that the researcher further emphasised that only VM was adopted for use in this study. It is also asserted that Value Management is different from value Engineering in that VM is aimed at the optimisation of solutions in the establishment of suitable decision frameworks for the rest of the project which is achieved through the use of a structured decision model that originates in Multi-Attribute Utility Theory (Green, 1994). A project is a once-off activity, with one chance to achieve a satisfactory outcome and this necessitates the establishment of unambiguous objectives. Value Management identifies the option which gives the best value for money in accordance with the set criteria (Hiley and Paliokostas, 2001).