ISBN: 9786134973649 - Productivity Improvement Through Time Study Analysis: Practical Implementation (6 results)

ISBN: 
Refine with Advanced Search

Refine your search

  • Books (6)

  • New (6)

to

Custom price range (£)

to

  • Language: English

    Published by LAP LAMBERT Academic Publishing, 2018

    6134973645 / 9786134973649

    • Softcover

    Seller: Revaluation Books, Exeter, United KingdomRevaluation Books

    5-star seller
    Contact seller

    Condition: New

    £ 94.08

    £ 10.00 shipping 
    Ships from United Kingdom to U.S.A.

    Quantity: 1 available

    Paperback. Condition: Brand New. 188 pages. 8.66x5.91x0.43 inches. In Stock.

  • Language: English

    Published by LAP LAMBERT Academic Publishing Jan 2018, 2018

    6134973645 / 9786134973649

    • Softcover
    • Print on Demand

    Seller: BuchWeltWeit Ludwig Meier e.K., Bergisch Gladbach, GermanyBuchWeltWeit Ludwig Meier e.K.

    5-star seller
    Contact seller

    Condition: New

    £ 55.88

    £ 19.23 shipping 
    Ships from Germany to U.S.A.

    Quantity: 2 available

    Taschenbuch. Condition: Neu. This item is printed on demand - it takes 3-4 days longer - Neuware -This project was formulated on the basis to focus on the time required for performing jobs on frame assembly shop of Atlas Honda Pakistan limited (Karachi Plant) by developing a rating factor for each assembly station at the assembly plant and also Reducing of assembly line balance delay by re-balancing of the assembly line. Hence, finally Improving overall productivity through assessment of various human factors at the workplace. 188 pp. Englisch.…

  • Language: English

    Published by LAP LAMBERT Academic Publishing, 2018

    6134973645 / 9786134973649

    • Softcover
    • Print on Demand

    Seller: moluna, Greven, Germanymoluna

    5-star seller
    Contact seller

    Condition: New

    £ 45.55

    £ 40.95 shipping 
    Ships from Germany to U.S.A.

    Quantity: Over 20 available

    Condition: New. Dieser Artikel ist ein Print on Demand Artikel und wird nach Ihrer Bestellung fuer Sie gedruckt. Autor/Autorin: Jaffery Ali AkbarAli Akbar is currently serving as Lecturer in Industrial Engineering and Management department at the Dawood University of Engineering & Technology Karachi, Pakistan.Presently, he is pursuing his MSc in Mechanical En.…

  • Language: English

    Published by LAP LAMBERT Academic Publishing, 2018

    6134973645 / 9786134973649

    • Softcover
    • Print on Demand

    Seller: AHA-BUCH GmbH, Einbeck, GermanyAHA-BUCH GmbH

    5-star seller
    Contact seller

    Condition: New

    £ 62.35

    £ 29.26 shipping 
    Ships from Germany to U.S.A.

    Quantity: 1 available

    Taschenbuch. Condition: Neu. nach der Bestellung gedruckt Neuware - Printed after ordering - This project was formulated on the basis to focus on the time required for performing jobs on frame assembly shop of Atlas Honda Pakistan limited (Karachi Plant) by developing a rating factor for each assembly station at the assembly plant and also Reducing of assembly line balance delay by re-balancing of the assembly line. Hence, finally Improving overall productivity through assessment of various human factors at the workplace.…

  • Language: English

    Published by LAP LAMBERT Academic Publishing, 2018

    6134973645 / 9786134973649

    • Softcover
    • Print on Demand

    Seller: preigu, Osnabrück, Germanypreigu

    5-star seller
    Contact seller

    Condition: New

    £ 47.27

    £ 58.51 shipping 
    Ships from Germany to U.S.A.

    Quantity: 5 available

    Taschenbuch. Condition: Neu. Productivity Improvement through Time Study Analysis | Practical Implementation | Ali Akbar Jaffery (u. a.) | Taschenbuch | 188 S. | Englisch | 2018 | LAP LAMBERT Academic Publishing | EAN 9786134973649 | Verantwortliche Person für die EU: preigu GmbH & Co. KG, Lengericher Landstr. 19, 49078 Osnabrück, mail[at]preigu[dot]de | Anbieter: preigu Print on Demand. …

  • Language: English

    Published by LAP LAMBERT Academic Publishing Jan 2018, 2018

    6134973645 / 9786134973649

    • Softcover
    • Print on Demand

    Seller: buchversandmimpf2000, Emtmannsberg, BAYE, Germanybuchversandmimpf2000

    5-star seller
    Contact seller

    Condition: New

    £ 55.88

    £ 50.15 shipping 
    Ships from Germany to U.S.A.

    Quantity: 1 available

    Taschenbuch. Condition: Neu. This item is printed on demand - Print on Demand Titel. Neuware -This project was formulated on the basis to focus on the time required for performing jobs on frame assembly shop of Atlas Honda Pakistan limited (Karachi Plant) by developing a rating factor for each assembly station at the assembly plant and also Reducing of assembly line balance delay by re-balancing of the assembly line. Hence, finally Improving overall productivity through assessment of various human factors at the workplace.VDM Verlag, Dudweiler Landstraße 99, 66123 Saarbrücken 188 pp. Englisch.…