This project was formulated on the basis to focus on the time required for performing jobs on frame assembly shop of Atlas Honda Pakistan limited (Karachi Plant) by developing a rating factor for each assembly station at the assembly plant and also Reducing of assembly line balance delay by re-balancing of the assembly line. Hence, finally Improving overall productivity through assessment of various human factors at the workplace.
"synopsis" may belong to another edition of this title.
Ali Akbar is currently serving as Lecturer in Industrial Engineering and Management department at the Dawood University of Engineering & Technology Karachi, Pakistan.Presently, he is pursuing his MSc in Mechanical Engineering from Universiti Teknologi PETRONAS (UTP) Malaysia.
"About this title" may belong to another edition of this title.
Seller: BuchWeltWeit Ludwig Meier e.K., Bergisch Gladbach, Germany
Taschenbuch. Condition: Neu. This item is printed on demand - it takes 3-4 days longer - Neuware -This project was formulated on the basis to focus on the time required for performing jobs on frame assembly shop of Atlas Honda Pakistan limited (Karachi Plant) by developing a rating factor for each assembly station at the assembly plant and also Reducing of assembly line balance delay by re-balancing of the assembly line. Hence, finally Improving overall productivity through assessment of various human factors at the workplace. 188 pp. Englisch. Seller Inventory # 9786134973649
Seller: moluna, Greven, Germany
Condition: New. Dieser Artikel ist ein Print on Demand Artikel und wird nach Ihrer Bestellung fuer Sie gedruckt. Autor/Autorin: Jaffery Ali AkbarAli Akbar is currently serving as Lecturer in Industrial Engineering and Management department at the Dawood University of Engineering & Technology Karachi, Pakistan.Presently, he is pursuing his MSc in Mechanical En. Seller Inventory # 385844039
Quantity: Over 20 available
Seller: Revaluation Books, Exeter, United Kingdom
Paperback. Condition: Brand New. 188 pages. 8.66x5.91x0.43 inches. In Stock. Seller Inventory # zk6134973645
Quantity: 1 available
Seller: preigu, Osnabrück, Germany
Taschenbuch. Condition: Neu. Productivity Improvement through Time Study Analysis | Practical Implementation | Ali Akbar Jaffery (u. a.) | Taschenbuch | 188 S. | Englisch | 2018 | LAP LAMBERT Academic Publishing | EAN 9786134973649 | Verantwortliche Person für die EU: preigu GmbH & Co. KG, Lengericher Landstr. 19, 49078 Osnabrück, mail[at]preigu[dot]de | Anbieter: preigu. Seller Inventory # 111228646
Seller: buchversandmimpf2000, Emtmannsberg, BAYE, Germany
Taschenbuch. Condition: Neu. This item is printed on demand - Print on Demand Titel. Neuware -This project was formulated on the basis to focus on the time required for performing jobs on frame assembly shop of Atlas Honda Pakistan limited (Karachi Plant) by developing a rating factor for each assembly station at the assembly plant and also Reducing of assembly line balance delay by re-balancing of the assembly line. Hence, finally Improving overall productivity through assessment of various human factors at the workplace.VDM Verlag, Dudweiler Landstraße 99, 66123 Saarbrücken 188 pp. Englisch. Seller Inventory # 9786134973649
Seller: AHA-BUCH GmbH, Einbeck, Germany
Taschenbuch. Condition: Neu. nach der Bestellung gedruckt Neuware - Printed after ordering - This project was formulated on the basis to focus on the time required for performing jobs on frame assembly shop of Atlas Honda Pakistan limited (Karachi Plant) by developing a rating factor for each assembly station at the assembly plant and also Reducing of assembly line balance delay by re-balancing of the assembly line. Hence, finally Improving overall productivity through assessment of various human factors at the workplace. Seller Inventory # 9786134973649