Refine your search

  • Books (5)

to

Custom price range (£)

to

Nkusi Ernest (5 results)

Author: 
Refine with Advanced Search
  • Language: English

    Published by AV Akademikerverlag, 2015

    3639853407 / 9783639853407

    • Softcover

    Seller: Mispah books, Redhill, SURRE, United KingdomMispah books

    4-star seller
    Contact seller

    Condition: Used - As new

    £ 103.00

    £ 25.00 shipping 
    Ships from United Kingdom to U.S.A.

    Quantity: 1 available

    Paperback. Condition: Like New. LIKE NEW. SHIPS FROM MULTIPLE LOCATIONS. book.

  • Language: English

    Published by AV Akademikerverlag Aug 2015, 2015

    3639853407 / 9783639853407

    • Softcover
    • Print on Demand

    Seller: BuchWeltWeit Ludwig Meier e.K., Bergisch Gladbach, GermanyBuchWeltWeit Ludwig Meier e.K.

    5-star seller
    Contact seller

    Condition: New

    £ 34.29

    £ 19.19 shipping 
    Ships from Germany to U.S.A.

    Quantity: 2 available

    Taschenbuch. Condition: Neu. This item is printed on demand - it takes 3-4 days longer - Neuware -Since the liberalization of the energy market the situation in the German transmission system has changed significantly. The trade of energy has increased rapidly and subsequently there is much more energy to transmit than at the time the main parts of the transmission system were built, which is nowadays 30 to 50 years ago. Additionally the energy from the growing amount of installed wind power, especially in the northern part of Germany, has to be transmitted to the more densely populated areas. Due to the fact that the system was originally built with the aim of reducing transmission losses, the lines are not suited to transport large amounts of energy. Subsequently the transmission system operators have to rethink the system structure to handle the congestion of the transmission lines. One possibility to control the load flow is either by using FACTS devices or by building additional transmission lines. In this book the costs, possibilities and limits of FACTS are analyzed and stated. Finally, a summary of recommendations is provided, stating in which cases the use of FACTS or the system extension through the construction of new transmission lines is effective and suitable. 116 pp. Englisch.…

  • Language: English

    Published by AV Akademikerverlag, 2015

    3639853407 / 9783639853407

    • Softcover
    • Print on Demand

    Seller: AHA-BUCH GmbH, Einbeck, GermanyAHA-BUCH GmbH

    5-star seller
    Contact seller

    Condition: New

    £ 34.29

    £ 29.20 shipping 
    Ships from Germany to U.S.A.

    Quantity: 1 available

    Taschenbuch. Condition: Neu. nach der Bestellung gedruckt Neuware - Printed after ordering - Since the liberalization of the energy market the situation in the German transmission system has changed significantly. The trade of energy has increased rapidly and subsequently there is much more energy to transmit than at the time the main parts of the transmission system were built, which is nowadays 30 to 50 years ago. Additionally the energy from the growing amount of installed wind power, especially in the northern part of Germany, has to be transmitted to the more densely populated areas. Due to the fact that the system was originally built with the aim of reducing transmission losses, the lines are not suited to transport large amounts of energy. Subsequently the transmission system operators have to rethink the system structure to handle the congestion of the transmission lines. One possibility to control the load flow is either by using FACTS devices or by building additional transmission lines. In this book the costs, possibilities and limits of FACTS are analyzed and stated. Finally, a summary of recommendations is provided, stating in which cases the use of FACTS or the system extension through the construction of new transmission lines is effective and suitable.…

  • Language: English

    Published by AV Akademikerverlag, 2015

    3639853407 / 9783639853407

    • Softcover
    • Print on Demand

    Seller: moluna, Greven, Germanymoluna

    5-star seller
    Contact seller

    Condition: New

    £ 28.17

    £ 40.87 shipping 
    Ships from Germany to U.S.A.

    Quantity: Over 20 available

    Condition: New. Dieser Artikel ist ein Print on Demand Artikel und wird nach Ihrer Bestellung fuer Sie gedruckt. Autor/Autorin: Nkusi ErnestErnest Nkusi, received his Master of Science degree in Electrical Power Engineering from Technical University of Darmstadt, in 2008. After his studies, he has been working on HVDC projects worldwide. His responsibilities .…

  • Language: English

    Published by AV Akademikerverlag Aug 2015, 2015

    3639853407 / 9783639853407

    • Softcover
    • Print on Demand

    Seller: buchversandmimpf2000, Emtmannsberg, BAYE, Germanybuchversandmimpf2000

    5-star seller
    Contact seller

    Condition: New

    £ 137.16

    £ 50.06 shipping 
    Ships from Germany to U.S.A.

    Quantity: 1 available

    Taschenbuch. Condition: Neu. This item is printed on demand - Print on Demand Titel. Neuware -Since the liberalization of the energy market the situation in the German transmission system has changed significantly. The trade of energy has increased rapidly and subsequently there is much more energy to transmit than at the time the main parts of the transmission system were built, which is nowadays 30 to 50 years ago. Additionally the energy from the growing amount of installed wind power, especially in the northern part of Germany, has to be transmitted to the more densely populated areas. Due to the fact that the system was originally built with the aim of reducing transmission losses, the lines are not suited to transport large amounts of energy. Subsequently the transmission system operators have to rethink the system structure to handle the congestion of the transmission lines. One possibility to control the load flow is either by using FACTS devices or by building additional transmission lines. In this book the costs, possibilities and limits of FACTS are analyzed and stated. Finally, a summary of recommendations is provided, stating in which cases the use of FACTS or the system extension through the construction of new transmission lines is effective and suitable.OmniScriptum SRL, Str. Armeneasca 28/1, office 1, 2012 Chisinau 116 pp. Englisch.…