Language: French
Published by Editions Notre Savoir, 2024
ISBN 10: 6208018498 ISBN 13: 9786208018498
Seller: California Books, Miami, FL, U.S.A.
Condition: New.
Language: French
Published by Editions Notre Savoir, 2024
ISBN 10: 6208018498 ISBN 13: 9786208018498
Seller: PBShop.store UK, Fairford, GLOS, United Kingdom
£ 40.03
Quantity: Over 20 available
Add to basketPAP. Condition: New. New Book. Shipped from UK. Established seller since 2000.
Condition: New. pp. 76.
Language: French
Published by Editions Notre Savoir, 2024
ISBN 10: 6208018498 ISBN 13: 9786208018498
Seller: Ria Christie Collections, Uxbridge, United Kingdom
£ 38.21
Quantity: Over 20 available
Add to basketCondition: New. In.
Paperback. Condition: Brand New. 76 pages. 8.66x5.91x0.18 inches. In Stock.
Language: Portuguese
Published by Edições Nosso Conhecimento, 2024
ISBN 10: 6208018471 ISBN 13: 9786208018474
Seller: California Books, Miami, FL, U.S.A.
Condition: New.
Condition: New.
Language: Portuguese
Published by Edi??es Nosso Conhecimento, 2024
ISBN 10: 6208018471 ISBN 13: 9786208018474
Seller: PBShop.store UK, Fairford, GLOS, United Kingdom
£ 40.03
Quantity: Over 20 available
Add to basketPAP. Condition: New. New Book. Shipped from UK. Established seller since 2000.
Seller: PBShop.store UK, Fairford, GLOS, United Kingdom
£ 40.03
Quantity: Over 20 available
Add to basketPAP. Condition: New. New Book. Shipped from UK. Established seller since 2000.
Seller: PBShop.store UK, Fairford, GLOS, United Kingdom
£ 40.03
Quantity: Over 20 available
Add to basketPAP. Condition: New. New Book. Shipped from UK. Established seller since 2000.
Taschenbuch. Condition: Neu. Development of Field Rework Index in Construction Industry | Identify Chances of rework before starting of Your Construction work. | Krupesh Chauhan (u. a.) | Taschenbuch | 76 S. | Englisch | 2018 | Scholars' Press | EAN 9786202317702 | Verantwortliche Person für die EU: preigu GmbH & Co. KG, Lengericher Landstr. 19, 49078 Osnabrück, mail[at]preigu[dot]de | Anbieter: preigu.
Language: English
Published by LAP LAMBERT Academic Publishing, 2013
ISBN 10: 3659508160 ISBN 13: 9783659508165
Seller: Mispah books, Redhill, SURRE, United Kingdom
Paperback. Condition: Like New. LIKE NEW. SHIPS FROM MULTIPLE LOCATIONS. book.
Language: Portuguese
Published by Edições Nosso Conhecimento, 2024
ISBN 10: 6208018471 ISBN 13: 9786208018474
Seller: Ria Christie Collections, Uxbridge, United Kingdom
£ 38.21
Quantity: Over 20 available
Add to basketCondition: New. In.
Seller: Ria Christie Collections, Uxbridge, United Kingdom
£ 38.21
Quantity: Over 20 available
Add to basketCondition: New. In.
Seller: Ria Christie Collections, Uxbridge, United Kingdom
£ 38.21
Quantity: Over 20 available
Add to basketCondition: New. In.
Language: French
Published by Editions Notre Savoir, 2024
ISBN 10: 6208018498 ISBN 13: 9786208018498
Seller: preigu, Osnabrück, Germany
Taschenbuch. Condition: Neu. Développement de l'indice de reprise des travaux sur le terrain dans l'industrie de la construction | Identifier les risques de reprise avant le début des travaux de construction | Krupesh Chauhan (u. a.) | Taschenbuch | Französisch | 2024 | Editions Notre Savoir | EAN 9786208018498 | Verantwortliche Person für die EU: preigu GmbH & Co. KG, Lengericher Landstr. 19, 49078 Osnabrück, mail[at]preigu[dot]de | Anbieter: preigu.
Taschenbuch. Condition: Neu. Sviluppo dell'indice di rilavorazione in campo nell'industria delle costruzioni | Identificare le possibilità di rilavorazione prima di iniziare i lavori di costruzione | Krupesh Chauhan (u. a.) | Taschenbuch | Italienisch | 2024 | Edizioni Sapienza | EAN 9786208018481 | Verantwortliche Person für die EU: SIA OmniScriptum Publishing, Brivibas Gatve 197, 1039 RIGA, LETTLAND, customerservice[at]vdm-vsg[dot]de | Anbieter: preigu.
Language: Portuguese
Published by Edições Nosso Conhecimento, 2024
ISBN 10: 6208018471 ISBN 13: 9786208018474
Seller: preigu, Osnabrück, Germany
Taschenbuch. Condition: Neu. Desenvolvimento do índice de retrabalho no terreno na indústria da construção | Identificar as possibilidades de retrabalho antes do início dos trabalhos de construção | Krupesh Chauhan (u. a.) | Taschenbuch | Portugiesisch | 2024 | Edições Nosso Conhecimento | EAN 9786208018474 | Verantwortliche Person für die EU: SIA OmniScriptum Publishing, Brivibas Gatve 197, 1039 RIGA, LETTLAND, customerservice[at]vdm-vsg[dot]de | Anbieter: preigu.
Taschenbuch. Condition: Neu. Razrabotka indexa polewyh rabot w stroitel'noj otrasli | Opredelite shansy na peredelku do nachala stroitel'nyh rabot | Krupesh Chauhan (u. a.) | Taschenbuch | Russisch | 2024 | Sciencia Scripts | EAN 9786208018467 | Verantwortliche Person für die EU: SIA OmniScriptum Publishing, Brivibas Gatve 197, 1039 RIGA, LETTLAND, customerservice[at]vdm-vsg[dot]de | Anbieter: preigu.
Taschenbuch. Condition: Neu. Entwicklung des Feldarbeitsindex in der Bauindustrie | Identifizieren Sie Nachbesserungsmöglichkeiten vor Beginn Ihrer Bauarbeiten | Krupesh Chauhan (u. a.) | Taschenbuch | 68 S. | Deutsch | 2024 | Verlag Unser Wissen | EAN 9786208018528 | Verantwortliche Person für die EU: preigu GmbH & Co. KG, Lengericher Landstr. 19, 49078 Osnabrück, mail[at]preigu[dot]de | Anbieter: preigu.
Language: English
Published by Scholars' Press Okt 2018, 2018
ISBN 10: 6202317701 ISBN 13: 9786202317702
Seller: BuchWeltWeit Ludwig Meier e.K., Bergisch Gladbach, Germany
Taschenbuch. Condition: Neu. This item is printed on demand - it takes 3-4 days longer - Neuware -The construction industry is facing the significant problems of high cost of project delivery, bad financial performance and inability to deliver value to customers on time. A major factor contributing to this setback is rework. Rework is defined as the unnecessary effort of redoing an activity that was inaccurately done the first time. In this research work questionnaire survey having various reasons of rework was conducted, Survey was carried out in Surat City south Gujarat Region. From the various Literatures 48 Causes of rework were finalized under 7 Major Group which was checked for their impact in construction using IMPORTANCE INDEX (IMPI) method and top most crucial causes were used to develop FIELD REWORK INDEX (FRI). The FRI score between 14 to 30 was approaching stage, 30 to 45 was normal vigilance stage and 45 to 70 was rework alert stage. After FRI questionnaire was distributed in 11 building construction sites out of 3 sites (27.27%) sites are having success approach, 8 sites (72.73%) are having normal chances of rework and 0 sites are having high alert. 76 pp. Englisch.
Condition: New. Print on Demand pp. 76.
Language: Spanish
Published by Ediciones Nuestro Conocimiento Aug 2024, 2024
ISBN 10: 620801851X ISBN 13: 9786208018511
Seller: BuchWeltWeit Ludwig Meier e.K., Bergisch Gladbach, Germany
Taschenbuch. Condition: Neu. This item is printed on demand - it takes 3-4 days longer - Neuware 68 pp. Spanisch.
Seller: Biblios, Frankfurt am main, HESSE, Germany
Condition: New. PRINT ON DEMAND pp. 76.
Seller: moluna, Greven, Germany
Condition: New. Dieser Artikel ist ein Print on Demand Artikel und wird nach Ihrer Bestellung fuer Sie gedruckt. Autor/Autorin: Chauhan KrupeshThe author is the Associate Professor at the Civil Engineering Department, Sardar Vallabhbhai National Institute of Technology, Surat, Gujarat, India, from 25 years & field work experience of 9 Years. The areas of his .
Language: English
Published by LAP LAMBERT Academic Publishing, 2013
ISBN 10: 3659508160 ISBN 13: 9783659508165
Seller: moluna, Greven, Germany
Condition: New. Dieser Artikel ist ein Print on Demand Artikel und wird nach Ihrer Bestellung fuer Sie gedruckt. Autor/Autorin: Chauhan AkashAuthor is pursuing MTech in India s renowned University named IIIT-H and doing final semester project in SERC-CSIR. Author has published 1 International Journal, 2 International Conference and 2 National conference paper.
Language: English
Published by Scholars' Press Okt 2018, 2018
ISBN 10: 6202317701 ISBN 13: 9786202317702
Seller: buchversandmimpf2000, Emtmannsberg, BAYE, Germany
Taschenbuch. Condition: Neu. This item is printed on demand - Print on Demand Titel. Neuware -The construction industry is facing the significant problems of high cost of project delivery, bad financial performance and inability to deliver value to customers on time. A major factor contributing to this setback is rework. Rework is defined as the unnecessary effort of redoing an activity that was inaccurately done the first time. In this research work questionnaire survey having various reasons of rework was conducted, Survey was carried out in Surat City south Gujarat Region. From the various Literatures 48 Causes of rework were finalized under 7 Major Group which was checked for their impact in construction using IMPORTANCE INDEX (IMPI) method and top most crucial causes were used to develop FIELD REWORK INDEX (FRI). The FRI score between 14 to 30 was approaching stage, 30 to 45 was normal vigilance stage and 45 to 70 was rework alert stage. After FRI questionnaire was distributed in 11 building construction sites out of 3 sites (27.27%) sites are having success approach, 8 sites (72.73%) are having normal chances of rework and 0 sites are having high alert.VDM Verlag, Dudweiler Landstraße 99, 66123 Saarbrücken 76 pp. Englisch.
Language: French
Published by Editions Notre Savoir Aug 2024, 2024
ISBN 10: 6208018498 ISBN 13: 9786208018498
Seller: BuchWeltWeit Ludwig Meier e.K., Bergisch Gladbach, Germany
Taschenbuch. Condition: Neu. This item is printed on demand - it takes 3-4 days longer - Neuware 68 pp. Französisch.
Taschenbuch. Condition: Neu. nach der Bestellung gedruckt Neuware - Printed after ordering - The construction industry is facing the significant problems of high cost of project delivery, bad financial performance and inability to deliver value to customers on time. A major factor contributing to this setback is rework. Rework is defined as the unnecessary effort of redoing an activity that was inaccurately done the first time. In this research work questionnaire survey having various reasons of rework was conducted, Survey was carried out in Surat City south Gujarat Region. From the various Literatures 48 Causes of rework were finalized under 7 Major Group which was checked for their impact in construction using IMPORTANCE INDEX (IMPI) method and top most crucial causes were used to develop FIELD REWORK INDEX (FRI). The FRI score between 14 to 30 was approaching stage, 30 to 45 was normal vigilance stage and 45 to 70 was rework alert stage. After FRI questionnaire was distributed in 11 building construction sites out of 3 sites (27.27%) sites are having success approach, 8 sites (72.73%) are having normal chances of rework and 0 sites are having high alert.