Arif Kamran (6 results)
- More images
- Softcover
Seller: moluna, Greven, Germanymoluna
Contact seller5-star sellerCondition: New
£ 36.71
£ 41.87 shippingShips from Germany to U.S.A.Quantity: Over 20 available
Condition: New.
- Softcover
Seller: Revaluation Books, Exeter, United KingdomRevaluation Books
Contact seller5-star sellerCondition: New
£ 73.91
£ 10.00 shippingShips from United Kingdom to U.S.A.Quantity: 1 available
Paperback. Condition: Brand New. 100 pages. 8.66x5.91x0.23 inches. In Stock.
- More images
- Softcover
Seller: preigu, Osnabrück, Germanypreigu
Contact seller5-star sellerCondition: New
£ 38.77
£ 59.82 shippingShips from Germany to U.S.A.Quantity: 5 available
Taschenbuch. Condition: Neu. Relationship between TQM practices and CI of project management in PAK | Total quality management & Project management in Pakistan | Kamran Arif | Taschenbuch | Englisch | 2017 | LAP LAMBERT Academic Publishing | EAN 9786202027717 | Verantwortliche Person für die EU: preigu GmbH & Co. KG, Lengericher… Landstr. 19, 49078 Osnabrück, mail[at]preigu[dot]de | Anbieter: preigu.
- More images
Language: English
Published by LAP LAMBERT Academic Publishing Sep 2017, 2017
- Softcover
- Print on Demand
Seller: BuchWeltWeit Ludwig Meier e.K., Bergisch Gladbach, GermanyBuchWeltWeit Ludwig Meier e.K.
Contact seller5-star sellerCondition: New
£ 43.93
£ 19.66 shippingShips from Germany to U.S.A.Quantity: 2 available
Taschenbuch. Condition: Neu. This item is printed on demand - it takes 3-4 days longer - Neuware -The main objective of conducting this research study is to find out the relationship between total quality management (TQM) practice and continuous improvement of project management in Pakistan (CIPMP). Through detailed literature r…eview of project management and TQM frameworks, five hypotheses are purposed on how CIPMP is affected by TQM elements. A survey is collected through questioner method and all the respondents are currently involved in the projects. For validation of these hypotheses the sample size is about 213. The results of study suggest that some of the TQM elements from both hard' and soft' TQM elements have a significant and positive relationship with CIPMP. But others have positive relation with CIPMP but not significant. Information and data analysis is the most influential element that has a greater impact on CIPMP. 100 pp. Englisch.
- More images
Language: English
Published by LAP LAMBERT Academic Publishing Sep 2017, 2017
- Softcover
- Print on Demand
Seller: buchversandmimpf2000, Emtmannsberg, BAYE, Germanybuchversandmimpf2000
Contact seller5-star sellerCondition: New
£ 43.93
£ 51.28 shippingShips from Germany to U.S.A.Quantity: 1 available
Taschenbuch. Condition: Neu. This item is printed on demand - Print on Demand Titel. Neuware -The main objective of conducting this research study is to find out the relationship between total quality management (TQM) practice and continuous improvement of project management in Pakistan (CIPMP). Through detailed literature revie…w of project management and TQM frameworks, five hypotheses are purposed on how CIPMP is affected by TQM elements. A survey is collected through questioner method and all the respondents are currently involved in the projects. For validation of these hypotheses the sample size is about 213. The results of study suggest that some of the TQM elements from both ¿hard' and ¿soft' TQM elements have a significant and positive relationship with CIPMP. But others have positive relation with CIPMP but not significant. Information and data analysis is the most influential element that has a greater impact on CIPMP.VDM Verlag, Dudweiler Landstraße 99, 66123 Saarbrücken 100 pp. Englisch.
- More images
- Softcover
- Print on Demand
Seller: AHA-BUCH GmbH, Einbeck, GermanyAHA-BUCH GmbH
Contact seller5-star sellerCondition: New
£ 44.46
£ 51.99 shippingShips from Germany to U.S.A.Quantity: 1 available
Taschenbuch. Condition: Neu. nach der Bestellung gedruckt Neuware - Printed after ordering - The main objective of conducting this research study is to find out the relationship between total quality management (TQM) practice and continuous improvement of project management in Pakistan (CIPMP). Through detailed literature review… of project management and TQM frameworks, five hypotheses are purposed on how CIPMP is affected by TQM elements. A survey is collected through questioner method and all the respondents are currently involved in the projects. For validation of these hypotheses the sample size is about 213. The results of study suggest that some of the TQM elements from both hard' and soft' TQM elements have a significant and positive relationship with CIPMP. But others have positive relation with CIPMP but not significant. Information and data analysis is the most influential element that has a greater impact on CIPMP.





