An updated and revised edition of the standard work on the use of critical path methods (CPM) in the construction industry. Describes the mechanics and procedures of CPM in construction planning and works control and demonstrates its application to large and small projects alike. Emphasis is not on the mathematics––the stress here is on the solution of problems commonly encountered in construction practice.
"synopsis" may belong to another edition of this title.
Seller: clickgoodwillbooks, Indianapolis, IN, U.S.A.
Condition: acceptable. Used - Acceptable: All pages and the cover are intact, but shrink wrap, dust covers, or boxed set case may be missing. Pages may include limited notes, highlighting, or minor water damage but the text is readable. Item may be missing bundled media. Seller Inventory # 3O6ZVA0000JZ_ns
Seller: ThriftBooks-Atlanta, AUSTELL, GA, U.S.A.
Paperback. Condition: Fair. No Jacket. Missing dust jacket; Readable copy. Pages may have considerable notes/highlighting. ~ ThriftBooks: Read More, Spend Less. Seller Inventory # G0471032468I5N01
Seller: Bingo Books 2, Vancouver, WA, U.S.A.
Hardcover. Condition: Very Good. 2nd Edition. second edition hardback book in very good condition,name at top of first blank page. Seller Inventory # 121576
Seller: Bingo Used Books, Vancouver, WA, U.S.A.
Hardcover. Condition: Very Good. Dust Jacket Condition: Very Good. 2nd Edition. hardback in very good+ condition with very good- dust jacket. 2nd edition. Seller Inventory # 118018
Seller: BookDepart, Shepherdstown, WV, U.S.A.
Hardcover. Condition: UsedGood. Hardcover, second edition; surplus library copy with the usual stampings; reference number taped to spine; fading and edge wear to exterior; otherwise in good condition with clean text, firm binding. Seller Inventory # 53737
Seller: Mr Pickwick's Fine Old Books, Katoomba, NSW, Australia
Hardcover (Original Cloth). Condition: Very Good. Dust Jacket Condition: No Dust Jacket. Second Edition. One of a collection of 150 specialist Trade books, including carpentry, wood turning, wooden boat building,stonemasonry, blacksmithing, tile making and the like. All are available for sale at this site. Use the special keyword pickwicktrade to compile an on-screen list of all these still available. Size: Octavo (standard book size). 414 pages. Text body is clean, and free from previous owner annotation, underlining and highlighting. Binding is tight, covers and spine fully intact. No foxing in this copy. Edges browned slightly. Quantity Available: 1. Shipped Weight: Under 1 kilogram. Category: Engineering, Industrial, Trade; ISBN: 0471032468. ISBN/EAN: 9780471032465. All our pictures shown here are of the actual item, not stock photos. Inventory No: 32060. For further info on this title, click on the "Contact Seller" button within this listing. We will try to reply within 24 hours. Otherwise you can order right now (inclusive of shipping options) from the "Add to Basket" button to the right. Seller Inventory # 32060