An updated and revised edition of the standard work on the use of critical path methods (CPM) in the construction industry. Describes the mechanics and procedures of CPM in construction planning and works control and demonstrates its application to large and small projects alike. Emphasis is not on the mathematics––the stress here is on the solution of problems commonly encountered in construction practice.
"synopsis" may belong to another edition of this title.
Seller: Anybook.com, Lincoln, United Kingdom
Condition: Fair. This is an ex-library book and may have the usual library/used-book markings inside.This book has hardback covers. In fair condition, suitable as a study copy. Please note the Image in this listing is a stock photo and may not match the covers of the actual item,850grams, ISBN:0471866121. Seller Inventory # 3943250
Seller: BookDepart, Shepherdstown, WV, U.S.A.
Hardcover. Condition: UsedGood. Hardcover; 3rd edition; technical library copy with minimal stampings; reference number taped to the spine; fading, soiling, and edge wear to exterior; bump to the upper front corner; in good condition with clean text and tight binding. Seller Inventory # 89206
Seller: Bingo Books 2, Vancouver, WA, U.S.A.
Hardcover. Condition: Near Fine. 3rd Edition. 3rd edition hardback book in near fine condition. Seller Inventory # 318253
Seller: Bingo Books 2, Vancouver, WA, U.S.A.
Hardcover. Condition: Near Fine. Dust Jacket Condition: Very Good. 3rd Edition. 3rd edition hardback book in near fine condition,dust jacket is very good. Seller Inventory # 127156