National Aero-Space Plane; A Need for Program Direction and Funding Decisions (GAO/NSIAD-93-207)
Published by United States General Accounting Office, Washington DC, 1993
- First Edition
- Softcover
- Used
Seller: Ground Zero Books, Ltd., Silver Spring, MD, U.S.A.Ground Zero Books, Ltd.
AbeBooks seller since August 14, 1998
Condition: Used - Very good
£ 27.23
Quantity: 1 available
Add to basketItem description from seller
12 pages, plus covers. This is a "Report to Congressional Requesters". Pursuant to a congressional request, GAO reviewed the National Aero-Space Plane (NASP) Program, focusing on the: (1) status of efforts to resolve the program's cost, schedule, and technical problems; and (2) lack of top-level management direction. The presidentially directed NASP Program is a joint Department of Defense (DoD)/National Aeronautics and Space Administration (NASA) technology development and demonstration program. The program's goal is to provide the technological basis for future space launch and hypersonic flight vehicles by developing critical or enabling technologies, such as the scramjet engine. DOD and NASA intended to demonstrate these technologies by building and testing the X-30, a manned experimental flight vehicle that is to be capable of single-stage-to-orbit (SSTO) flight. The concept is to develop a vehicle that can take off horizontally from a runway; reach hypersonic speeds of up to 25 times the speed of sound (Mach 25); and attain low earth orbit, without the use of external booster rockets or propellant tanks. The program currently consists of three phases. Phase I (1982 to 1985), which preceded the formal initiation of the program, evaluated the feasibility and technical concept for an aerospace plane. Phase II (1985 to 1994) is a technology development and maturation phase. The program was in the final segment of phase II, which was intended to develop the critical technologies and manufacturing processes, build and test specific structural articles, and test a subscale engine to demonstrate the propulsion system's concept. A decision was to be made in September 1993 based on cost and technical maturity on whether to proceed into phase III, which involves designing, building, and testing the X-30. However, funding constraints and technical concerns have caused DOD and NASA to reconsider the timing of this decision and to restructure the current contract and associated technical efforts. The National Space Council had been responsible for developing overall national policy, direction, and guidance on space activities such as the NASP Program; however, the new administration has designated the Office of Science and Technology Policy to assume these roles. In 1986, the Secretary of Defense and the Administrator of NASA chartered the NASP Steering Group to provide policy, guidance, and broad programmatic direction to the program. Among the Steering Group's tasks were approving both the program's entrance into phase III (subject to the consent of the Secretary of Defense and Administrator of NASA) and substantive changes to the program, resolving programmatic issues, and reviewing proposed changes and making recommendations relative to the program's funding. The Steering Group is currently chaired by the Under Secretary of Defense for Acquisition and the Deputy Administrator of NASA is vice-chair. The Air Force is the program's executive agency and has established a Joint Program Office at Wright-Patterson Air Force Base, Ohio, to manage the program. The NASP National Contractor Team, consisting of five major aerospace contractors is responsible for the majority of the technology development efforts. Since fiscal year 1986, Congress has provided about $1.7 billion to DOD and NASA for phase Il. GAO reported in December 1992 that the projected cost for the baseline program had increased from $3.1 billion to $17.0 billion, the time frames for achieving such milestones as first flight were uncertain, and the development of key technologies had encountered difficulties. These cost, schedule, and technical problems will not be resolved by the completion of the currently planned phase II efforts. Consequently, a decision to begin phase III has been effectively deferred. Neither the Office of Science and Technology Policy, the Steering Group, nor DOD has provided clear direction on what the program's future efforts and objectives should.…
Seller Inventory # 91245
Bibliographic details
- Title
- National Aero-Space Plane; A Need for Program Direction and Funding Decisions (GAO/NSIAD-93-207)
- Author
- United States General Accounting Office
- Publisher
- United States General Accounting Office, Washington DC
- Publication year
- 1993
- Condition
- Very good
- Binding
- Wraps
- Edition
- Presumed First Edition, First Printing.
- Seller catalogs
- NASA
Ground Zero Books, Ltd.
Silver Spring, MD, U.S.A.
AbeBooks seller since August 14, 1998
Shipping rates within U.S.A.
| Item | 5 to 20 business days | 3 to 6 business days |
|---|---|---|
| First item | £ 3.78 | £ 5.66 |
Payment methods
- Check
- Invoice
- Money Order
- Paypal
Store description
Founded and operated by trained historians, Ground Zero Books, Ltd., serves the book collector, the scholar, and institutions. We focus on the individual, and pride ourselves on our personal service. Please contact us with your wants, as we have many books not yet listed in our database.
Specialty
Military History, Nuclear, American Revolution, Military Medicine, Vietnam, World War II, British Empire, World War I, Unit Histories, Civil WarSeller's business information
Ground Zero Books, Ltd.
9033 Georgia Avenue
Silver Spring, MD U.S.A. 20910-2254
Terms of sale
Books are subject to prior sale. Please ask us to hold a book for you before you
mail your check. Books are returnable within 7 days, if not satisfactory. MD
residents add 6% state sales tax.
The mailing address for Ground Zero Books, Ltd. (a subchapter-S corporation) is
P.O. Box 8369, Silver Spring, MD 20907-8369. You can reach us by phone at 301-
585-1471, by fax at 301-920-0253, or by e-mail at gzbooksltd@aol.com. Ground Zero
Books, Ltd., is owned & operated by R. Alan Lewis & Lynne Haims.
Right of withdrawal
If you are a consumer you can withdraw from the contract in accordance with the following. Consumer means any natural person who is acting for purposes which are outside his trade, business, craft or profession.
Information regarding the right of withdrawal
Statutory right to withdraw
You have the right to withdraw from this contract within 14 days without giving any reason.
The withdrawal period will expire after 14 days from the day on which you acquire, or a third party other than the carrier and indicated by you acquires, physical possession of the last good or the last lot or piece.
To exercise the right of withdrawal, electronically fill in and submit a clear statement on our website, under "My Purchases" in "My Account". We will communicate to you an acknowledgement of receipt of such a withdrawal on a durable medium (e.g. by e-mail) without delay.
To meet the withdrawal deadline, it is sufficient for you to send your communication concerning your exercise of the right of withdrawal before the withdrawal period has expired.
Effects of withdrawal
If you withdraw from this contract, we will reimburse to you all payments received from you, including the costs of delivery (except for the supplementary costs arising if you chose a type of delivery other than the least expensive type of standard delivery offered by us).
We may make a deduction from the reimbursement for loss in value of any goods supplied, if the loss is the result of unnecessary handling by you.
We will make the reimbursement without undue delay, and not later than 14 days after the day on which we are informed about your decision to withdraw from this contract.
We will make the reimbursement using the same means of payment as you used for the initial transaction, unless you have expressly agreed otherwise; in any event, you will not incur any fees as a result of such reimbursement.
We may withhold reimbursement until we have received the goods back, or you have supplied evidence of having sent back the goods, whichever is the earliest.
You shall send back the goods or hand them over to Ground Zero Books, Ltd., Silver Spring, Maryland, U.S.A., +1 240-316-0119, without undue delay and in any event not later than 14 days from the day on which you communicate your withdrawal from this contract to us. The deadline is met if you send back the goods before the period of 14 days has expired. You will have to bear the direct cost of returning the goods. You are only liable for any diminished value of the goods resulting from the handling other than what is necessary to establish the nature, characteristics and functioning of the goods.
Exceptions to the right of withdrawal
The right of withdrawal does not apply to:
- The delivery of newspapers, journals or magazines with the exception of subscription contracts; and
- The supply of digital content which is not supplied on a tangible medium (e.g. on a CD or DVD) if you accepted when you placed your order that we could start to deliver it, and that you could not withdraw once delivery had started.
Shipping terms
Orders usually ship within 2 business days. Shipping costs are based on books
weighing 2.2 LB, or 1 KG. If your book order is heavy or oversized, we may contact
you to let you know extra shipping is required.