Risk Conventional Modular Construction by Munir Muhammad (5 results)

- Softcover
Seller: preigu, Osnabrück, Germanypreigu
Contact seller5-star sellerCondition: New
£ 46.40
£ 60.00 shippingShips from Germany to U.S.A.Quantity: 5 available
Taschenbuch. Condition: Neu. Risk Of Conventional And Modular Construction On Project Time And Cost | Muhammad Zeeshan Munir (u. a.) | Taschenbuch | Englisch | 2023 | LAP LAMBERT Academic Publishing | EAN 9786206142133 | Verantwortliche Person für die EU: SIA OmniScriptum Publishing, Brivibas Gatve 197, 1039 RIGA, LETTLAND, customerservice[at]vdm-vsg[dot]de | Anbieter: preigu.…

- Softcover
Seller: Mispah books, Redhill, SURRE, United KingdomMispah books
Contact seller4-star sellerCondition: New
£ 100.00
£ 25.00 shippingShips from United Kingdom to U.S.A.Quantity: 1 available
paperback. Condition: New. NEW. SHIPS FROM MULTIPLE LOCATIONS. book.

Language: English
Published by LAP LAMBERT Academic Publishing Feb 2023, 2023
- Softcover
- Print on Demand
Seller: BuchWeltWeit Ludwig Meier e.K., Bergisch Gladbach, GermanyBuchWeltWeit Ludwig Meier e.K.
Contact seller5-star sellerCondition: New
£ 53.77
£ 19.72 shippingShips from Germany to U.S.A.Quantity: 2 available
Taschenbuch. Condition: Neu. This item is printed on demand - it takes 3-4 days longer - Neuware -Modular construction is an emerging construction technique due to its valuable benefits. This, on the other hand, faces a degree of uncertainty due to internal and external elements such as engineering, occupational, cultural, socioeconomic, and financial concerns that impact the project outcome mainly time and cost. Existing risk management research for conventional construction cannot be accurately applied to modular construction since modular construction is by nature different from conventional. This study is intended to identify primary risk factors associated with modular construction and conduct an assessment of their impacts on project cost and duration and compare them with those of conventional risks. After gathering a comprehensive list of risks in both construction methodologies, their probabilities and impacts on project cost and time were gathered through questionnaires and interviews. Based on the weighted average probabilities and impacts, risk categorization as per these three criteria was made. Moreover, comparison risk matrices were developed for different categories of risks. 124 pp. Englisch. …

- Softcover
- Print on Demand
Seller: moluna, Greven, Germanymoluna
Contact seller5-star sellerCondition: New
£ 44.08
£ 41.99 shippingShips from Germany to U.S.A.Quantity: Over 20 available
Condition: New. Dieser Artikel ist ein Print on Demand Artikel und wird nach Ihrer Bestellung fuer Sie gedruckt. Modular construction is an emerging construction technique due to its valuable benefits. This, on the other hand, faces a degree of uncertainty due to internal and external elements such as engineering, occupational, cultural, socioeconomic, and financial c.…

Language: English
Published by LAP LAMBERT Academic Publishing Feb 2023, 2023
- Softcover
- Print on Demand
Seller: buchversandmimpf2000, Emtmannsberg, BAYE, Germanybuchversandmimpf2000
Contact seller5-star sellerCondition: New
£ 53.77
£ 51.43 shippingShips from Germany to U.S.A.Quantity: 1 available
Taschenbuch. Condition: Neu. This item is printed on demand - Print on Demand Titel. Neuware -Modular construction is an emerging construction technique due to its valuable benefits. This, on the other hand, faces a degree of uncertainty due to internal and external elements such as engineering, occupational, cultural, socioeconomic, and financial concerns that impact the project outcome mainly time and cost. Existing risk management research for conventional construction cannot be accurately applied to modular construction since modular construction is by nature different from conventional. This study is intended to identify primary risk factors associated with modular construction and conduct an assessment of their impacts on project cost and duration and compare them with those of conventional risks. After gathering a comprehensive list of risks in both construction methodologies, their probabilities and impacts on project cost and time were gathered through questionnaires and interviews. Based on the weighted average probabilities and impacts, risk categorization as per these three criteria was made. Moreover, comparison risk matrices were developed for different categories of risks.VDM Verlag, Dudweiler Landstraße 99, 66123 Saarbrücken 124 pp. Englisch. …