9783848486113 - Network of Scheduling Problems: Flow Shop Scheduling by Gupta, Deepak; Singla, Payal (4 results)

- Softcover
Seller: preigu, Osnabrück, Germanypreigu
Contact seller5-star sellerCondition: New
£ 38.43
£ 60.31 shippingShips from Germany to U.S.A.Quantity: 5 available
Taschenbuch. Condition: Neu. Network of Scheduling Problems | Flow Shop Scheduling | Deepak Gupta (u. a.) | Taschenbuch | Englisch | LAP Lambert Academic Publishing | EAN 9783848486113 | Verantwortliche Person für die EU: preigu GmbH & Co. KG, Lengericher Landstr. 19, 49078 Osnabrück, mail[at]preigu[dot]de | Anbieter: preigu.

- Softcover
Seller: Mispah books, Redhill, SURRE, United KingdomMispah books
Contact seller4-star sellerCondition: Used - As new
£ 101.00
£ 25.00 shippingShips from United Kingdom to U.S.A.Quantity: 1 available
Paperback. Condition: Like New. LIKE NEW. SHIPS FROM MULTIPLE LOCATIONS. book.

- Softcover
- Print on Demand
Seller: moluna, Greven, Germanymoluna
Contact seller5-star sellerCondition: New
£ 36.98
£ 42.21 shippingShips from Germany to U.S.A.Quantity: Over 20 available
Condition: New. Dieser Artikel ist ein Print on Demand Artikel und wird nach Ihrer Bestellung fuer Sie gedruckt. Autor/Autorin: Gupta DeepakDr. Deepak Gupta, a renowned personality,is working as a Prof. & Head,Dept.of Mathematics, MMU,Mullana, Haryana(India). He is prolific author of eleven books and has credit of 60 research pa…pers published in National/Inte.

- Softcover
- Print on Demand
Seller: AHA-BUCH GmbH, Einbeck, GermanyAHA-BUCH GmbH
Contact seller5-star sellerCondition: New
£ 44.01
£ 52.38 shippingShips from Germany to U.S.A.Quantity: 2 available
Taschenbuch. Condition: Neu. nach der Bestellung gedruckt Neuware - Printed after ordering - Today we are living in a information technological age where computer networks are playing a big role. On the other hand due to globalization and complex competitive market situation the world s people are going with speed. The role of s…cheduling theory is increasing day by day in minimize the idle time of man and machine at work. The waiting time problem can be solve by using scheduling technique to meet the objective of the organization with efficiency and effectiveness. Manufacturing industries are the backbone in the economic structure of a nation. As the benefits from a manufacturing system can be maximized if the available resources are utilized in an optimize manner. Optimized utilization of resources can only be possible if there is a proper scheduling system in place. This makes scheduling a highly important aspect of a manufacturing system.