Isbn: 9783846536612 - Maintenance Planning and Control of Boiler Section of Thermal Plant: a Case Study (7 results)

Language: English
Published by VDM Verlag Dr. Mueller Aktiengesellschaft & Co. KG, 2012
- Softcover
Seller: Books Puddle, Woodside, NY, U.S.A.Books Puddle
Contact seller4-star sellerCondition: New
£ 67.45
£ 3.02 shippingShips within U.S.A.Quantity: 4 available
Condition: New. pp. 68.

- Softcover
Seller: preigu, Osnabrück, Germanypreigu
Contact seller5-star sellerCondition: New
£ 37.93
£ 59.40 shippingShips from Germany to U.S.A.Quantity: 5 available
Taschenbuch. Condition: Neu. Maintenance planning and control of boiler section of thermal plant | A case study | Rupinder Singh (u. a.) | Taschenbuch | Englisch | LAP Lambert Academic Publishing | EAN 9783846536612 | Verantwortliche Person für die EU: LAP Lambert Academic Publishing, Brivibas Gatve 197, 1039 RIGA, LETTLAND, customerservice[at]vdm-vsg[dot]de | Anbieter: preigu.…

- Softcover
Seller: Mispah books, Redhill, SURRE, United KingdomMispah books
Contact seller4-star sellerCondition: Used - As new
£ 101.00
£ 25.00 shippingShips from United Kingdom to U.S.A.Quantity: 1 available
Paperback. Condition: Like New. LIKE NEW. SHIPS FROM MULTIPLE LOCATIONS. book.

- Softcover
- Print on Demand
Seller: AHA-BUCH GmbH, Einbeck, GermanyAHA-BUCH GmbH
Contact seller5-star sellerCondition: New
£ 43.35
£ 29.70 shippingShips from Germany to U.S.A.Quantity: 2 available
Taschenbuch. Condition: Neu. nach der Bestellung gedruckt Neuware - Printed after ordering - Modern-day technologies are described by very high-level of computerization, deploying composite and sophisticated machines. The objective behind is to achieve higher productivity and profit in an organization. Therefore it is always desirable to achieve maximum calculated output from every machine in the industry. Reduction in downtime is a step towards getting a maximum output from machines by improving their reliability and availability. In the present research work a systematic approach for Maintenance Planning and Control (as Modified Six Step Method) has been applied on one of the critical Unit, Boiler Section of Thermal Plant as a Case Study. Down time has been reduced by analyzing the failure pattern of critical parts of all types of equipment. The study suggested that with proposed maintenance plan, downtime of a thermal plant can be reduced by 430 hrs over a period of three years and monetary benefit to the organization due to new maintenance policy is of the order of Rs. 18, 00, 00, 000 to 36,00,00,000 INR for the span of three years.…

Language: English
Published by VDM Verlag Dr. Mueller Aktiengesellschaft & Co. KG, 2012
- Softcover
- Print on Demand
Seller: Majestic Books, Hounslow, United KingdomMajestic Books
Contact seller4-star sellerCondition: New
£ 67.54
£ 6.50 shippingShips from United Kingdom to U.S.A.Quantity: 4 available
Condition: New. Print on Demand pp. 68 2:B&W 6 x 9 in or 229 x 152 mm Perfect Bound on Creme w/Gloss Lam.

Language: English
Published by VDM Verlag Dr. Mueller Aktiengesellschaft & Co. KG, 2012
- Softcover
- Print on Demand
Seller: Biblios, frankfurt am main, HESSE, GermanyBiblios
Contact seller4-star sellerCondition: New
£ 69.17
£ 8.44 shippingShips from Germany to U.S.A.Quantity: 4 available
Condition: New. PRINT ON DEMAND pp. 68.

- Softcover
- Print on Demand
Seller: moluna, Greven, Germanymoluna
Contact seller5-star sellerCondition: New
£ 36.42
£ 41.57 shippingShips from Germany to U.S.A.Quantity: Over 20 available
Condition: New. Dieser Artikel ist ein Print on Demand Artikel und wird nach Ihrer Bestellung fuer Sie gedruckt. Autor/Autorin: Singh RupinderRupinder Singh is working as an Associate Professor in the Department of Production Engineering at Guru Nanak Dev Engineering College, Ludhiana, India. Sumeet Sohal is a Research Scholar (M.Tech).…