Rajan Navaneethan (5 results)

Author
Refine with Advanced Search

Refine your search

  • Books (5)

  • New (5)

to

Custom price range (£)

to

  • Language: English

    Published by LAP LAMBERT Academic Publishing, 2015

    3848447975 / 9783848447978

    • Softcover

    Seller: preigu, Osnabrück, Germanypreigu

    5-star seller
    Contact seller

    Condition: New

    £ 38.33

    £ 60.03 shipping 
    Ships from Germany to U.S.A.

    Quantity: 5 available

    Taschenbuch. Condition: Neu. Impact of Project Delivery Methods on Texas Construction Projects | A Detailed Analysis of 2009 ENR Best Projects in Texas | Navaneethan Rajan | Taschenbuch | 96 S. | Englisch | 2015 | LAP LAMBERT Academic Publishing | EAN 9783848447978 | Verantwortliche Person für die EU: preigu GmbH & Co. KG, Lengericher Landstr. 19, 49078 Osnabrück, mail[at]preigu[dot]de | Anbieter: preigu.

  • Language: English

    Published by LAP LAMBERT Academic Publishing Apr 2012, 2012

    3848447975 / 9783848447978

    • Softcover
    • Print on Demand

    Seller: BuchWeltWeit Ludwig Meier e.K., Bergisch Gladbach, GermanyBuchWeltWeit Ludwig Meier e.K.

    5-star seller
    Contact seller

    Condition: New

    £ 43.28

    £ 19.72 shipping 
    Ships from Germany to U.S.A.

    Quantity: 2 available

    Taschenbuch. Condition: Neu. This item is printed on demand - it takes 3-4 days longer - Neuware -Competitive Bidding, Competitive Sealed Proposal, Construction Management Agency, Construction Management at Risk, Design-Build, Design-Build-Bridging, and Job Order Contracting are seven project delivery methods (PDM) that are commonly used in the state of Texas today. This book empirically compares the cost, schedule, and change order management performance of these project delivery methods (PDM) through in-depth analysis of selected construction projects that are chosen from the State of Texas by Engineering News Record (ENR) as the Best Construction Projects of the year 2009. Detailed information on research methodology, survey instrument, performance metrics, results, interpretations, and conclusions of the analysis are presented. Also presented are the 'Lessons Learned', provided by the project participants. 96 pp. Englisch.

  • Language: English

    Published by LAP LAMBERT Academic Publishing, 2012

    3848447975 / 9783848447978

    • Softcover
    • Print on Demand

    Seller: moluna, Greven, Germanymoluna

    5-star seller
    Contact seller

    Condition: New

    £ 36.26

    £ 42.01 shipping 
    Ships from Germany to U.S.A.

    Quantity: Over 20 available

    Condition: New. Dieser Artikel ist ein Print on Demand Artikel und wird nach Ihrer Bestellung fuer Sie gedruckt. Autor/Autorin: Rajan NavaneethanNavaneethan Rajan is a Project Controls Professional, currently working for PAE, Inc. He holds a Master s degree in Construction Management and a Bachelor s degree in Architecture. His research interest includes Pro.

  • Language: English

    Published by LAP LAMBERT Academic Publishing, 2012

    3848447975 / 9783848447978

    • Softcover
    • Print on Demand

    Seller: AHA-BUCH GmbH, Einbeck, GermanyAHA-BUCH GmbH

    5-star seller
    Contact seller

    Condition: New

    £ 62.70

    £ 26.15 shipping 
    Ships from Germany to U.S.A.

    Quantity: 1 available

    Taschenbuch. Condition: Neu. nach der Bestellung gedruckt Neuware - Printed after ordering - Competitive Bidding, Competitive Sealed Proposal, Construction Management Agency, Construction Management at Risk, Design-Build, Design-Build-Bridging, and Job Order Contracting are seven project delivery methods (PDM) that are commonly used in the state of Texas today. This book empirically compares the cost, schedule, and change order management performance of these project delivery methods (PDM) through in-depth analysis of selected construction projects that are chosen from the State of Texas by Engineering News Record (ENR) as the Best Construction Projects of the year 2009. Detailed information on research methodology, survey instrument, performance metrics, results, interpretations, and conclusions of the analysis are presented. Also presented are the 'Lessons Learned', provided by the project participants.

  • Language: English

    Published by LAP LAMBERT Academic Publishing Apr 2012, 2012

    3848447975 / 9783848447978

    • Softcover
    • Print on Demand

    Seller: buchversandmimpf2000, Emtmannsberg, BAYE, Germanybuchversandmimpf2000

    5-star seller
    Contact seller

    Condition: New

    £ 43.28

    £ 51.45 shipping 
    Ships from Germany to U.S.A.

    Quantity: 1 available

    Taschenbuch. Condition: Neu. This item is printed on demand - Print on Demand Titel. Neuware -Competitive Bidding, Competitive Sealed Proposal, Construction Management Agency, Construction Management at Risk, Design-Build, Design-Build-Bridging, and Job Order Contracting are seven project delivery methods (PDM) that are commonly used in the state of Texas today. This book empirically compares the cost, schedule, and change order management performance of these project delivery methods (PDM) through in-depth analysis of selected construction projects that are chosen from the State of Texas by Engineering News Record (ENR) as the Best Construction Projects of the year 2009. Detailed information on research methodology, survey instrument, performance metrics, results, interpretations, and conclusions of the analysis are presented. Also presented are the 'Lessons Learned', provided by the project participants.VDM Verlag, Dudweiler Landstraße 99, 66123 Saarbrücken 96 pp. Englisch.