Recent Trends in Cold-Formed Steel Construction
Cheng Yu
Sold by AHA-BUCH GmbH, Einbeck, Germany
AbeBooks Seller since 14 August 2006
New - Hardcover
Condition: New
Ships from Germany to U.S.A.
Quantity: 2 available
Add to basketSold by AHA-BUCH GmbH, Einbeck, Germany
AbeBooks Seller since 14 August 2006
Condition: New
Quantity: 2 available
Add to basketnach der Bestellung gedruckt Neuware - Printed after ordering - Recent Trends in Cold-Formed Steel Construction discusses advancements in an area that has become an important construction material for buildings. The book addresses cutting-edge new technologies and design methods using cold-formed steel as a main structural material, and provides technical guidance on how to design and build sustainable and energy-efficient cold-formed steel buildings. Part One of the book introduces the codes, specifications, and design methods for cold-formed steel structures, while Part Two provides computational analysis of cold-formed steel structures. Part Three examines the structural performance of cold-formed steel buildings and reviews the thermal performance, acoustic performance, fire protection, floor vibrations, and blast resistance of these buildings, with a final section reviewing innovation and sustainability in cold-formed steel construction.
Seller Inventory # 9780081009604
Recent Trends in Cold-Formed Steel Construction discusses advancements in an area that has become an important construction material for buildings. The book addresses cutting-edge new technologies and design methods using cold-formed steel as a main structural material, and provides technical guidance on how to design and build sustainable and energy-efficient cold-formed steel buildings.
Part One of the book introduces the codes, specifications, and design methods for cold-formed steel structures, while Part Two provides computational analysis of cold-formed steel structures. Part Three examines the structural performance of cold-formed steel buildings and reviews the thermal performance, acoustic performance, fire protection, floor vibrations, and blast resistance of these buildings, with a final section reviewing innovation and sustainability in cold-formed steel construction.
Dr. Cheng Yu is a professor and program coordinator in the Department of Mechanical Engineering at the University of North Texas, Denton, Texas, USA. He received his BS in Civil Engineering from the Tsinghua University. Both his MS and PhD were earned from the Johns Hopkins University. Dr. Yu’s research interests include thin-walled structures, structural stability, cold-formed steel, and earthquake engineering. Dr. Yu is an active committee member of the American Iron and Steel Institute which developed the North American Cold-Formed Steel Specifications and Standards. Dr Yu’s research has been funded by federal agencies, professional associations, and various industrial sponsors. Dr. Yu is a registered professional engineer in Texas and a Structural Engineering Institute fellow of the American Society of Civil Engineers.
"About this title" may belong to another edition of this title.
General Terms and Conditions and Customer Information / Privacy Policy
I. General Terms and Conditions
§ 1 Basic provisions
(1) The following terms and conditions apply to all contracts that you conclude with us as a provider (AHA-BUCH GmbH) via the Internet platforms AbeBooks and/or ZVAB. Unless otherwise agreed, the inclusion of any of your own terms and conditions used by you will be objected to
(2) A consumer within the meaning of the following regulations is any natural person who concludes...
If you are a consumer you can withdraw from the contract in accordance with the following. Consumer means any natural person who is acting for purposes which are outside his trade, business, craft or profession.
Information regarding the right of withdrawal
Statutory right to withdraw
You have the right to withdraw from this contract within 14 days without giving any reason.
The withdrawal period will expire after 14 days from the day on which you acquire, or a third party other than the carrier and indicated by you acquires, physical possession of the last good or the last lot or piece.
To exercise the right of withdrawal, electronically fill in and submit a clear statement on our website, under "My Purchases" in "My Account". We will communicate to you an acknowledgement of receipt of such a withdrawal on a durable medium (e.g. by e-mail) without delay.
To meet the withdrawal deadline, it is sufficient for you to send your communication concerning your exercise of the right of withdrawal before the withdrawal period has expired.
Effects of withdrawal
If you withdraw from this contract, we will reimburse to you all payments received from you, including the costs of delivery (except for the supplementary costs arising if you chose a type of delivery other than the least expensive type of standard delivery offered by us).
We may make a deduction from the reimbursement for loss in value of any goods supplied, if the loss is the result of unnecessary handling by you.
We will make the reimbursement without undue delay, and not later than 14 days after the day on which we are informed about your decision to withdraw from this contract.
We will make the reimbursement using the same means of payment as you used for the initial transaction, unless you have expressly agreed otherwise; in any event, you will not incur any fees as a result of such reimbursement.
We may withhold reimbursement until we have received the goods back, or you have supplied evidence of having sent back the goods, whichever is the earliest.
You shall send back the goods or hand them over to AHA-BUCH GmbH, Einbeck, Germany, without undue delay and in any event not later than 14 days from the day on which you communicate your withdrawal from this contract to us. The deadline is met if you send back the goods before the period of 14 days has expired. You will have to bear the direct cost of returning the goods. You are only liable for any diminished value of the goods resulting from the handling other than what is necessary to establish the nature, characteristics and functioning of the goods.
Exceptions to the right of withdrawal
The right of withdrawal does not apply to:
We ship your order after we received them
for articles on hand latest 24 hours,
for articles with overnight supply latest 48 hours.
In case we need to order an article from our supplier our dispatch time depends on the reception date of the articles, but the articles will be shipped on the same day.
Our goal is to send the ordered articles in the fastest, but also most efficient and secure way to our customers.
| Order quantity | 30 to 40 business days | 7 to 14 business days |
|---|---|---|
| First item | £ 54.06 | £ 62.62 |
Delivery times are set by sellers and vary by carrier and location. Orders passing through Customs may face delays and buyers are responsible for any associated duties or fees. Sellers may contact you regarding additional charges to cover any increased costs to ship your items.