The Construction Industry: Processes, Players, and Practices
Language: English
Published by Pearson, 2000
- Softcover
- Used

Seller: Gate City Books, GREENSBORO, NC, U.S.A.Gate City Books
AbeBooks seller since June 5, 2025
Condition: Used - Good
£ 34.46
Quantity: 1 available
Add to basketItem description from seller
USED book in GOOD condition. Great binding, pages and cover show normal signs of wear from use.
Seller Inventory # GCM.3R3V
- Title
- The Construction Industry: Processes, Players, and Practices
- Author
- Liebing, Ralph W.
- Publisher
- Pearson
- Publication year
- 2000
- Condition
- good
- Binding
- Soft cover
- Language
- English
- ISBN 10
- 0138638535
- ISBN 13
- 9780138638535
For courses in Architecture, Construction, Construction Management, Trade Education, and Engineering.
- This introductory, supplemental text, provides an effective overview of the basic essence of the construction industry, its impact on society, and the magnificent work it produces. It demonstrates the worldwide impact of the industry in all areas and civilizations of the world today.
- The intent of this text is to provide a broad view of the construction industry to develop fundamental understanding in the reader, of the industry's size, breadth, extent, versatility, impact, expertise, and assistance to life, worldwide, in many different formats, climates, and situations. Shows how industry fills the needs of society, and aids physical and economic development, and life in general. This understanding will provide the student/reader with a good founding, and a basis for putting their other course work in proper perspective.
"Synopsis" may belong to another edition of this title.
From the Back Cover
The construction industry is a vast, imposing, and complex entity. This book is intended to give students and professionals in construction management, engineering, and architecture an overview of the people, processes, and business practices found in this exciting field. The reader will learn about the role of each of the players in the construction business, how a project proceeds from start to finish, and about everyday procedures used to keep projects flowing smoothly.
Some of the key features of this book include:
- Chapter 3, "The Sequence of a Project," provides a through step-by-step coverage of the design-build approach to building construction. Readers will get a clear understanding of this major methodology.
- For the reader with little or no background in the construction industry, this book provides the basic terminology and concepts that will be a foundation for future study.
- For reference, the author has provided useful additions such as the glossary, appendices, building code charts, and a listing of trade associations.
"About the title" may belong to another edition of this title.
Gate City Books
GREENSBORO, NC, U.S.A.
AbeBooks seller since June 5, 2025
Shipping rates within U.S.A.
| Item | 4 to 7 business days | 1 to 3 business days |
|---|---|---|
| First item | £ 0.00 | £ 9.80 |
Payment methods
Store description
Quality used books since 2017
Specialty
UsedSeller's business information
NC, U.S.A.
Right of withdrawal
If you are a consumer you can withdraw from the contract in accordance with the following. Consumer means any natural person who is acting for purposes which are outside his trade, business, craft or profession.
Information regarding the right of withdrawal
Statutory right to withdraw
You have the right to withdraw from this contract within 14 days without giving any reason.
The withdrawal period will expire after 14 days from the day on which you acquire, or a third party other than the carrier and indicated by you acquires, physical possession of the last good or the last lot or piece.
To exercise the right of withdrawal, electronically fill in and submit a clear statement on our website, under "My Purchases" in "My Account". We will communicate to you an acknowledgement of receipt of such a withdrawal on a durable medium (e.g. by e-mail) without delay.
To meet the withdrawal deadline, it is sufficient for you to send your communication concerning your exercise of the right of withdrawal before the withdrawal period has expired.
Effects of withdrawal
If you withdraw from this contract, we will reimburse to you all payments received from you, including the costs of delivery (except for the supplementary costs arising if you chose a type of delivery other than the least expensive type of standard delivery offered by us).
We may make a deduction from the reimbursement for loss in value of any goods supplied, if the loss is the result of unnecessary handling by you.
We will make the reimbursement without undue delay, and not later than 14 days after the day on which we are informed about your decision to withdraw from this contract.
We will make the reimbursement using the same means of payment as you used for the initial transaction, unless you have expressly agreed otherwise; in any event, you will not incur any fees as a result of such reimbursement.
We may withhold reimbursement until we have received the goods back, or you have supplied evidence of having sent back the goods, whichever is the earliest.
You shall send back the goods or hand them over to Gate City Books, GREENSBORO, North Carolina, U.S.A., +1 9199304532, without undue delay and in any event not later than 14 days from the day on which you communicate your withdrawal from this contract to us. The deadline is met if you send back the goods before the period of 14 days has expired. You will have to bear the direct cost of returning the goods. You are only liable for any diminished value of the goods resulting from the handling other than what is necessary to establish the nature, characteristics and functioning of the goods.
Exceptions to the right of withdrawal
The right of withdrawal does not apply to:
- The delivery of newspapers, journals or magazines with the exception of subscription contracts; and
- The supply of digital content which is not supplied on a tangible medium (e.g. on a CD or DVD) if you accepted when you placed your order that we could start to deliver it, and that you could not withdraw once delivery had started.