CDM Regulations 2015 Procedures Manual 4e
Language: English
Published by Blackwell Pub, 2016
- Softcover
- New

Seller: Revaluation Books, Exeter, United KingdomRevaluation Books
AbeBooks seller since January 6, 2003
Condition: New
£ 116.91
Quantity: 1 available
Add to basketItem description from seller
4th edition. 124 pages. 11.50x8.25x0.50 inches. In Stock.
Seller Inventory # zk1119243033
- Title
- CDM Regulations 2015 Procedures Manual 4e
- Author
- Summerhayes, Stuart
- Publisher
- Blackwell Pub
- Publication year
- 2016
- Condition
- Brand New
- Binding
- Paperback
- Language
- English
- ISBN 10
- 1119243033
- ISBN 13
- 9781119243038
- Edition
- 4th Edition
- Item weight
- 0.43 kilograms
CDM REGULATIONS
2015 PROCEDURES MANUAL
The Construction (Design and Management) Regulations (CDM Regulations) initially came into force on 31 March 1995 to promote an integrated, holistic approach to the consideration of health and safety issues associated with all aspects of construction projects. The Regulations were updated in 2007, with the current version coming into force on 6 April 2015.
The Regulations require all those involved in construction to adopt a team-based approach to health and safety, to be delivered through dutyholder responsibilities via project team risk management, accountability and effective, timely communication.
The CDM Regulations 2015 Procedures Manual articulates and explains the statutory duties, and provides a documentation system to ensure associated compliance. It has been thoroughly revised to take account of the amendments to the CDM Regulations brought about by the 2015 update, which requires both subtle and significant changes in the management of health and safety within the construction industry.
"Synopsis" may belong to another edition of this title.
About the Author
The Author
As a chartered civil engineer, STUART D. SUMMERHAYES, BSc MSc IFaPS, gained wide professional experience in heavy construction before moving into construction and project management education at the University of Glamorgan (now the University of South Wales).In the role of independent consultant he has undertaken planning supervision and CDM co-ordination commissions ranging from £10,000 refurbishment contracts to the £121 million Millennium Stadium Project in Cardiff, and has carried out extensive construction-related health and safety management work for major clients in the UK and Europe.
Additionally, Stuart has developed and delivered a portfolio of CDM-related courses to dutyholders within the construction industry for more than 20 years, is a past President of the Association for Project Safety (APS) and author of the sister publication Design Risk Management: Contribution to Health and Safety.
"About the title" may belong to another edition of this title.
Revaluation Books
Exeter, United Kingdom
AbeBooks seller since January 6, 2003
Shipping rates from United Kingdom to U.S.A.
| Item | 7 to 14 business days | 2 to 3 business days |
|---|---|---|
| First item | £ 10.00 | £ 25.00 |
Payment methods
Seller's business information
Edward Bowditch Ltd
Exstowe, Exton
Exeter, United Kingdom EX3 0PP
Terms of sale
Legal entity name: Edward Bowditch Ltd
Legal entity form: Limited company
Business correspondence address: Exstowe, Exton, Exeter, EX3 0PP
Company registration number: 04916632
VAT registration: GB834241546
Authorised representative: Mr. E. Bowditch
Right of withdrawal
If you are a consumer you can withdraw from the contract in accordance with the following. Consumer means any natural person who is acting for purposes which are outside his trade, business, craft or profession.
Information regarding the right of withdrawal
Statutory right to withdraw
You have the right to withdraw from this contract within 14 days without giving any reason.
The withdrawal period will expire after 14 days from the day on which you acquire, or a third party other than the carrier and indicated by you acquires, physical possession of the last good or the last lot or piece.
To exercise the right of withdrawal, electronically fill in and submit a clear statement on our website, under "My Purchases" in "My Account". We will communicate to you an acknowledgement of receipt of such a withdrawal on a durable medium (e.g. by e-mail) without delay.
To meet the withdrawal deadline, it is sufficient for you to send your communication concerning your exercise of the right of withdrawal before the withdrawal period has expired.
Effects of withdrawal
If you withdraw from this contract, we will reimburse to you all payments received from you, including the costs of delivery (except for the supplementary costs arising if you chose a type of delivery other than the least expensive type of standard delivery offered by us).
We may make a deduction from the reimbursement for loss in value of any goods supplied, if the loss is the result of unnecessary handling by you.
We will make the reimbursement without undue delay, and not later than 14 days after the day on which we are informed about your decision to withdraw from this contract.
We will make the reimbursement using the same means of payment as you used for the initial transaction, unless you have expressly agreed otherwise; in any event, you will not incur any fees as a result of such reimbursement.
We may withhold reimbursement until we have received the goods back, or you have supplied evidence of having sent back the goods, whichever is the earliest.
You shall send back the goods or hand them over to Revaluation Books, Hounslow, United Kingdom, without undue delay and in any event not later than 14 days from the day on which you communicate your withdrawal from this contract to us. The deadline is met if you send back the goods before the period of 14 days has expired. You will have to bear the direct cost of returning the goods. You are only liable for any diminished value of the goods resulting from the handling other than what is necessary to establish the nature, characteristics and functioning of the goods.
Exceptions to the right of withdrawal
The right of withdrawal does not apply to:
- The delivery of newspapers, journals or magazines with the exception of subscription contracts; and
- The supply of digital content which is not supplied on a tangible medium (e.g. on a CD or DVD) if you accepted when you placed your order that we could start to deliver it, and that you could not withdraw once delivery had started.
Shipping terms
Orders usually dispatched within two working days.