A simplified formula for the change in order of interference due to changes in temperature and pressure of air Volume: Bulletin of the Bureau of Standards, Vol. 9, 479-481 Scientific Paper 199 (S199) 1913 [LeatherBound]

  • Hardcover
  • New
See all details

Seller: True World of Books, Delhi, IndiaTrue World of Books

5-star seller

AbeBooks seller since December 6, 2017

Hardcover

Condition: New

£ 18.67

 Free Shipping 
Ships from India to U.S.A.
Seller accepted payment methods
  • Bank Wire Transfer
  • Direct Debit
  • Paypal

Quantity: 18 available

Add to basket
Free 30-day returns
Want to pay with your credit card?
  • Visa
  • Mastercard
  • American Express
  • Apple Pay
  • Google Pay
Buy on AbeBooks.com

Item description from seller

BOOKS ARE EXEMPT FROM IMPORT DUTIES AND TARIFFS; NO EXTRA CHARGES APPLY. Leather Binding on Spine and Corners with Golden leaf printing on spine. Bound in genuine leather with Satin ribbon page markers and Spine with raised gilt bands. A perfect gift for your loved ones. Reprinted from 1913 edition. NO changes have been made to the original text. This is NOT a retyped or an ocr'd reprint. Illustrations, Index, if any, are included in black and white. Each page is checked manually before printing. As this print on demand book is reprinted from a very old book, there could be some missing or flawed pages, but we always try to make the book as complete as possible. Fold-outs, if any, are not part of the book. If the original book was published in multiple volumes then this reprint is of only one volume, not the whole set and contains approximately 18 pages. IF YOU WISH TO ORDER PARTICULAR VOLUME OR ALL THE VOLUMES YOU CAN CONTACT US. Resized as per current standards. Sewing binding for longer life, where the book block is actually sewn (smythe sewn/section sewn) with thread before binding which results in a more durable type of binding. Language: English.…

Seller Inventory # LB990000023858

Bibliographic details

Title
A simplified formula for the change in order of interference due to changes in temperature and pressure of air Volume: Bulletin of the Bureau of Standards, Vol. 9, 479-481 Scientific Paper 199 (S199) 1913 [LeatherBound]
Author
Irwin G Priest
Publication year
2025
Condition
New
Binding
LeatherBound

True World of Books

Delhi, India

5-star seller

AbeBooks seller since December 6, 2017

Shipping rates from India to U.S.A.

Item15 to 40 business days10 to 30 business days
First item£ 0.00£ 5.82
Delivery times are set by sellers and vary by carrier and location. Orders passing through Customs may face delays and buyers are responsible for any associated duties or fees. Sellers may contact you regarding additional charges to cover any increased costs to ship your items.

Payment methods

You can pay with your credit card on AbeBooks.com.
  • Bank Wire Transfer
  • Direct Debit
  • Paypal

Specialty

Books published in India

Seller's business information

True World of Books

India