[Two adjoining RAF pilot's maps] Asia 1:2,000,000 (Arabia) Sheets S.E. Arabia Layered (M.D.R. 538 / 6215) AND Gulf of Aden (M.D.R. 538 / 6216) Not to be Published
Language: English
Published by 512 Forward Survey Company, Royal Engineers, (Cairo), 1943
- Map
- Used





Condition: Used - Good
£ 850.00
Quantity:Â 1 available
Add to basketItem description from seller
Two adjoining colour printed paper sheets from the Asia 1/2M (Arabia) series: Sheet S.E. Arabia Layered 80x63cm, and Sheet Gulf of Aden (sitting off-centre below) 80x46cm. Both good, neatly folded with short closed tears, dusting and marks, and flight-related ms annotations. They were reproduced by 512 Forward Survey Company in February and March 1943 respectively, from Survey of India first editions 1934 and 1935. The former is layered with air information for March 1943 from HQ RAF Middle East, the latter with revised communications. Their issue coincides with major reorganisation of Allied air forces in the North African and Mediterranean Theater in February 1943. This made HQ British Forces Aden a sub-command of RAF Middle East Command primarily responsible for anti-submarine operations and escort missions. Centred on the Rub al Khali, the SE Arabia sheet is bounded by the Dahana Sands (NW), Muscat and Ras al Hadd (NE), and the Oman coast as far as Haifif in the Hadhramaut (S). The Gulf of Aden sheet continues along the Aden Protectorate and Yemen coasts to the Red Sea port of Luhaiya (thus including major locations including Masirah Island, Mukalla, Aden, Hodeida, Sana'a etc), with Socotra (SE). Altitudes are shown by colour tints with approximate contours and spot heights. Features include settlements, a web of mainly pack animal tracks, wadis, descriptive notes about terrain in the image, with a large area in the Rub al Khali bounded by Qaamiyat and Awamir labelled "Unexplored desert". Communications include steamer services with destinations and distances and submarine cables especially off the coasts at Aden and Hodeida highlighting the strategic importance of the Bab el Mandeb Strait, and Muscat. RAF data includes airfields, landing grounds, airfields whose local position or existence is not confirmed, landing grounds not regularly visited or unconfirmed, airfields and landing grounds abandoned etc. The annotations include a flight line connecting Aden (RAF Khormaksar) to Masirah Island, which largely follows the coast via Ras Quseir, Mukalla, Quishn, Salalah, Murbat etc with additional points written on. During WW2 RAF Khormaksar played a key role in the East African Campaign, and as a USAAF stopover. The RAF established a permanent detachment on Masirah Island in 1942, building a major base in 1943 to serve as remote refuelling point, staging post on the Aden to India route, and base for anti-submarine patrols. RAF Mirbat and RAF Salalah on the Dhofar coast were early bases established by the RAF to exert control over the Peninsula, the latter providing a staging post during WW2. The annotated route bypasses Khor Gharim, which with Bayt al Falaj and Ras Al-Hadd offered emergency landing grounds. (Reference: RAF Museum website).…
Seller Inventory # 6093
Bibliographic details
- Title
- [Two adjoining RAF pilot's maps] Asia 1:2,000,000 (Arabia) Sheets S.E. Arabia Layered (M.D.R. 538 / 6215) AND Gulf of Aden (M.D.R. 538 / 6216) Not to be Published
- Author
- Survey of India; 512 Forward Survey Company, Royal Engineers
- Publisher
- 512 Forward Survey Company, Royal Engineers, (Cairo)
- Publication year
- 1943
- Condition
- Good
- Binding
- No Binding
- Language
- English
Shipping rates from United Kingdom to U.S.A.
| Item | 7 to 10 business days | 15 to 30 business days |
|---|---|---|
| First item | £ 43.00 | £ 43.00 |
Payment methods
Store description
My interests include travel, exploration, and art. Books, reports, maps, photographs, posters, correspondence, ephemera, souvenirs, and related items.
Specialty
Primarily travel, exploration and art related.Seller's business information
Dendera
United Kingdom
Right of withdrawal
If you are a consumer you can withdraw from the contract in accordance with the following. Consumer means any natural person who is acting for purposes which are outside his trade, business, craft or profession.
Information regarding the right of withdrawal
Statutory right to withdraw
You have the right to withdraw from this contract within 14 days without giving any reason.
The withdrawal period will expire after 14 days from the day on which you acquire, or a third party other than the carrier and indicated by you acquires, physical possession of the last good or the last lot or piece.
To exercise the right of withdrawal, electronically fill in and submit a clear statement on our website, under "My Purchases" in "My Account". We will communicate to you an acknowledgement of receipt of such a withdrawal on a durable medium (e.g. by e-mail) without delay.
To meet the withdrawal deadline, it is sufficient for you to send your communication concerning your exercise of the right of withdrawal before the withdrawal period has expired.
Effects of withdrawal
If you withdraw from this contract, we will reimburse to you all payments received from you, including the costs of delivery (except for the supplementary costs arising if you chose a type of delivery other than the least expensive type of standard delivery offered by us).
We may make a deduction from the reimbursement for loss in value of any goods supplied, if the loss is the result of unnecessary handling by you.
We will make the reimbursement without undue delay, and not later than 14 days after the day on which we are informed about your decision to withdraw from this contract.
We will make the reimbursement using the same means of payment as you used for the initial transaction, unless you have expressly agreed otherwise; in any event, you will not incur any fees as a result of such reimbursement.
We may withhold reimbursement until we have received the goods back, or you have supplied evidence of having sent back the goods, whichever is the earliest.
You shall send back the goods or hand them over to Dendera, Beckenham, Kent, United Kingdom, without undue delay and in any event not later than 14 days from the day on which you communicate your withdrawal from this contract to us. The deadline is met if you send back the goods before the period of 14 days has expired. You will have to bear the direct cost of returning the goods. You are only liable for any diminished value of the goods resulting from the handling other than what is necessary to establish the nature, characteristics and functioning of the goods.
Exceptions to the right of withdrawal
The right of withdrawal does not apply to:
- The delivery of newspapers, journals or magazines with the exception of subscription contracts; and
- The supply of digital content which is not supplied on a tangible medium (e.g. on a CD or DVD) if you accepted when you placed your order that we could start to deliver it, and that you could not withdraw once delivery had started.
Shipping terms
SHIPPING: Domestic and international shipping is tracked and insured with UPS. This has unfortunately meant an increase in domestic rates especially, and in most cases I am absorbing some of the increase. (I have moved away from Royal Mail owing to a series of problems).
DELIVERY DEADLINES: If you have a hard deadline for receipt that is before the processing time stated on Abe, eg, if you need it to arrive urgently before you travel or before a particular event, please contact me at the time of order to advise, so options can be discussed and steps taken to ensure it gets there in time.
RETURNS: Please return any items for refund within 30 days of the estimated delivery date, and contact me first with the reason for the return to establish whether postal costs will be included in the refund. If the item is not as described, I will cover the original and return post.