2G N.31 Riegler Riewe (2G: International Architecture Review Series)
Language: English
Published by Editorial Gustavo Gili, S.L., 2004
- First Edition
- Softcover
- Magazine / Periodical
- New

Seller: castlebooksbcn, Barcelona, B, Spaincastlebooksbcn
AbeBooks seller since June 13, 2014
Condition: New
£ 26.50
Quantity: 1 available
Add to basketItem description from seller
Seller Inventory # ABE-1605886798109
- Title
- 2G N.31 Riegler Riewe (2G: International Architecture Review Series)
- Author
- Guttmann, Eva
- Publisher
- Editorial Gustavo Gili, S.L.
- Publication year
- 2004
- Condition
- Nuevo
- Dust jacket
- Como Nuevo
- Binding
- Encuadernación de tapa blanda
- Language
- English
- ISBN 10
- 8425219590
- ISBN 13
- 9788425219597
- Edition
- 1ª Edición
"Synopsis" may belong to another edition of this title.
Excerpt. © Reprinted by permission. All rights reserved.
| Excerpt from the nexus section.
Tetra Pak, or an Architecture of the Background by Roger Riewe Tetra Pak For the most part we use open materials, materials that are not occupied by or subject to a meaning. Open materials are for us those materials that cannot per se be connected with nature or ecology, or not those materials that are automatically associated with the past because they were deliberately used in the past as a medium of meaning in order to present and misuse architecture as an instrument of power. Where we do use materials that bear a certain meaning we change their form by taking them apart, deconstructing them and putting them together in a new way in order to deprive them of their meaning. By using materials without a meaning or that are relatively poor in meaning the perception of the viewer is not bound to certain attempts at interpretation, as would happen with materials that convey meaning. Creating a material surface that is neutral in terms of meaning, which acquires, to a certain extent, an immaterial character, allows much space for perception, not only through the depth of the surface or, as Jean-François Lyotard puts it, to allow it be seen that there is something invisible in the visible. Architecture is background. With these premises we choose the appropriate material for each commission with a great deal of care, also taking into account the ways of working it. Thus it can happen that materials that are usually seen as belonging to the area of low tech are used with a high level of technical expenditure, similar to the application in the area of high tech but with the important difference that the aestheticisation takes place on different levels. In high tech it becomes a formal element, as a result of which high tech becomes a style, whereas in low tech, in contrast, the aestheticisation, inasmuch as one can speak of it at all, is not celebrated; it has a minor, project-related, contextual meaning. Sol LeWitt: New materials are one of the great afflictions of contemporary art. Some artists confuse new materials with new ideas. There is nothing worse than seeing art that wallows in gaudy baubles [...]. The danger is, I think, in making the physicality of the materials so important that it becomes the idea of the work (another kind of expressionism). Thus, for example, it is certainly significant that in our buildings for the Institutes for Computer Science and Electronics a rough in situ concrete surface was made without construction joints and that the facade was not made of pre-cast elements. Equally it was also important to us that the facade of the Innsbruck Railway Station building should not be erected using a pre-cast construction system but with in situ concrete as the perception of and the effect achieved by these different construction methods are very different. That the facade in Innsbruck was ultimately made with a special concrete technology (self-compacting concrete) and with the first use of pigmentation on this scale was a consequence of our design requirements. What we attempted was not under any circumstances to give the technology used a special value or to celebrate it. Using the same approach in 1992 we built the thinnest facade in the field of Austrian housing and in 1994 used the first thermal glazing in office building to be filled with heavy gases. What applies to the materials and the execution is also a premise for the details and detailing. The details never assert themselves in the foreground; they play a minor role that is, nevertheless, important in the overall context of the project. The development of the details in the planning phase demands a great deal of time, as the contextuality in the overall concept must be considered as well as the formation of the detail as an individual element. At the same time and this is perhaps the most difficult thing about this process we also take into account local levels of construction and specialist skills. This is not intended to imply that good architecture can only be made where there are specialist skilled workers of a particular standard. Le Corbusier s La Tourette, Peter Märkli s Haus für Skulpturen in Giornico in Switzerland or Max Bill s Hochschule für Gestaltung in Ulm, to cite just a few examples, prove the opposite. Hereby we are dealing with a very specific form of the glocal, that is an overlay of a supra-local, indeed globally shaped, approach and local circumstances. In the future we will have to examine the question whether, particularly in the area of cultural studies, the term glocal for our architecture and our approach is too vague or even wrongly connoted and whether our approach to architecture could be better described by the term eurocal. |
"About the title" may belong to another edition of this title.
castlebooksbcn
Barcelona, B, Spain
AbeBooks seller since June 13, 2014
Shipping rates from Spain to U.S.A.
| Item | 25 to 45 business days | 8 to 14 business days |
|---|---|---|
| First item | £ 29.16 | £ 37.74 |
Payment methods
- Bank Wire Transfer
Store description
Seller's business information
castlebooksbcn
Spain
Terms of sale
Transferencia bancaria
Right of withdrawal
If you are a consumer you can withdraw from the contract in accordance with the following. Consumer means any natural person who is acting for purposes which are outside his trade, business, craft or profession.
Information regarding the right of withdrawal
Statutory right to withdraw
You have the right to withdraw from this contract within 14 days without giving any reason.
The withdrawal period will expire after 14 days from the day on which you acquire, or a third party other than the carrier and indicated by you acquires, physical possession of the last good or the last lot or piece.
To exercise the right of withdrawal, electronically fill in and submit a clear statement on our website, under "My Purchases" in "My Account". We will communicate to you an acknowledgement of receipt of such a withdrawal on a durable medium (e.g. by e-mail) without delay.
To meet the withdrawal deadline, it is sufficient for you to send your communication concerning your exercise of the right of withdrawal before the withdrawal period has expired.
Effects of withdrawal
If you withdraw from this contract, we will reimburse to you all payments received from you, including the costs of delivery (except for the supplementary costs arising if you chose a type of delivery other than the least expensive type of standard delivery offered by us).
We may make a deduction from the reimbursement for loss in value of any goods supplied, if the loss is the result of unnecessary handling by you.
We will make the reimbursement without undue delay, and not later than 14 days after the day on which we are informed about your decision to withdraw from this contract.
We will make the reimbursement using the same means of payment as you used for the initial transaction, unless you have expressly agreed otherwise; in any event, you will not incur any fees as a result of such reimbursement.
We may withhold reimbursement until we have received the goods back, or you have supplied evidence of having sent back the goods, whichever is the earliest.
You shall send back the goods or hand them over to castlebooksbcn, Barcelona, Barcelona, Spain, without undue delay and in any event not later than 14 days from the day on which you communicate your withdrawal from this contract to us. The deadline is met if you send back the goods before the period of 14 days has expired. You will have to bear the direct cost of returning the goods. You are only liable for any diminished value of the goods resulting from the handling other than what is necessary to establish the nature, characteristics and functioning of the goods.
Exceptions to the right of withdrawal
The right of withdrawal does not apply to:
- The delivery of newspapers, journals or magazines with the exception of subscription contracts; and
- The supply of digital content which is not supplied on a tangible medium (e.g. on a CD or DVD) if you accepted when you placed your order that we could start to deliver it, and that you could not withdraw once delivery had started.
Shipping terms
Los gastos de envío están calculados sobre la base del peso de un libro de 2.2 LB ó 1 KG. Si su pedido es demasiado grande o pesado, nosotros podemos ponernos en contacto con usted para comunicarle que gasto de envío adicional es requerido.
Orders usually ship within 2 business days. Shipping costs are based on books weighing 2.2 LB, or 1 KG. If your book order is heavy or oversized, we may contact you to let you know extra shipping is required.