Technical Letter Number 39: Mineral Exploration between Bi'r Idimah and Wadi Haraman, Asir Quadrangle, Saudi Arabia
Language: English
Published by United States Geological Survey (USGS), Jiddah [Jeddah], 1966
- First Edition
- Softcover
- Used





Condition: Used - Good
£ 350.00
Quantity: 1 available
Add to basketItem description from seller
Original staple-bound green printed wraps 22x28cm. (1)pp covering letter from Glen Brown to Fadil Kabbani, Deputy Minister for Mineral Resources; 70pp Overstreet's report printed to the rectos only. Wraps good, foxed, torn to the upper staple at the front, staples rusted. Interiors very good with ink offsetting to several of the blank versos (not affecting text). This report is a very early "preliminary" product of the monumental USGS-Aramco mapping project (1956-63), which, among other things, produced 21 Geological maps covering the whole of Saudi Arabia in a series of Quadrangles numbered I-200A to I-220A. It was prepared under the follow-up Saudi Arabian Mineral Exploration Project launched in 1963, which Brown coordinated from Jeddah. Overstreet conducted his fieldwork during 8 May to 27 June 1965 using Map I-217A (Asir Quadrangle). This continued his expedition made the previous year between Khamis Mushayt and Bi'r Idimah (described in Technical Letter No. 23). He travelled 5300km accompanied by the local guide Maeith and driver Homud Saud in two 3/4 ton 4x4 Ford pickups provided by the Directorate General for Mineral Resources, with aircraft dispatched for 4 scheduled rendezvous. He took 490 samples of wadi sand, about the same number of magnetite, and 41 other materials. He identified possibilities for marble and asbestos, and suggested an ancient mine, the Ishaaib, may contain copper (pp4-5). He prepared the report on 5 July 1965, and it was issued on 15 January 1966. Very rare. Brown's covering letter states 10 copies were sent to Kabbani. Additional copies would have been circulated within USGS and probably Aramco. Worldcat records other letters in the series, but not this one. USGS reissued it in 1968 as Open-File Report 68-207 (USGS website).…
Seller Inventory # 5546
Bibliographic details
- Title
- Technical Letter Number 39: Mineral Exploration between Bi'r Idimah and Wadi Haraman, Asir Quadrangle, Saudi Arabia
- Author
- Overstreet, William C.; Glen F. Brown
- Publisher
- United States Geological Survey (USGS), Jiddah [Jeddah]
- Publication year
- 1966
- Condition
- Good
- Binding
- Soft cover
- Language
- English
- Edition
- 1st Edition
Shipping rates from United Kingdom to U.S.A.
| Item | 7 to 10 business days | 15 to 30 business days |
|---|---|---|
| First item | £ 43.00 | £ 43.00 |
Payment methods
Store description
My interests include travel, exploration, and art. Books, reports, maps, photographs, posters, correspondence, ephemera, souvenirs, and related items.
Specialty
Primarily travel, exploration and art related.Seller's business information
Dendera
United Kingdom
Right of withdrawal
If you are a consumer you can withdraw from the contract in accordance with the following. Consumer means any natural person who is acting for purposes which are outside his trade, business, craft or profession.
Information regarding the right of withdrawal
Statutory right to withdraw
You have the right to withdraw from this contract within 14 days without giving any reason.
The withdrawal period will expire after 14 days from the day on which you acquire, or a third party other than the carrier and indicated by you acquires, physical possession of the last good or the last lot or piece.
To exercise the right of withdrawal, electronically fill in and submit a clear statement on our website, under "My Purchases" in "My Account". We will communicate to you an acknowledgement of receipt of such a withdrawal on a durable medium (e.g. by e-mail) without delay.
To meet the withdrawal deadline, it is sufficient for you to send your communication concerning your exercise of the right of withdrawal before the withdrawal period has expired.
Effects of withdrawal
If you withdraw from this contract, we will reimburse to you all payments received from you, including the costs of delivery (except for the supplementary costs arising if you chose a type of delivery other than the least expensive type of standard delivery offered by us).
We may make a deduction from the reimbursement for loss in value of any goods supplied, if the loss is the result of unnecessary handling by you.
We will make the reimbursement without undue delay, and not later than 14 days after the day on which we are informed about your decision to withdraw from this contract.
We will make the reimbursement using the same means of payment as you used for the initial transaction, unless you have expressly agreed otherwise; in any event, you will not incur any fees as a result of such reimbursement.
We may withhold reimbursement until we have received the goods back, or you have supplied evidence of having sent back the goods, whichever is the earliest.
You shall send back the goods or hand them over to Dendera, Beckenham, Kent, United Kingdom, without undue delay and in any event not later than 14 days from the day on which you communicate your withdrawal from this contract to us. The deadline is met if you send back the goods before the period of 14 days has expired. You will have to bear the direct cost of returning the goods. You are only liable for any diminished value of the goods resulting from the handling other than what is necessary to establish the nature, characteristics and functioning of the goods.
Exceptions to the right of withdrawal
The right of withdrawal does not apply to:
- The delivery of newspapers, journals or magazines with the exception of subscription contracts; and
- The supply of digital content which is not supplied on a tangible medium (e.g. on a CD or DVD) if you accepted when you placed your order that we could start to deliver it, and that you could not withdraw once delivery had started.
Shipping terms
SHIPPING: Domestic and international shipping is tracked and insured with UPS. This has unfortunately meant an increase in domestic rates especially, and in most cases I am absorbing some of the increase. (I have moved away from Royal Mail owing to a series of problems).
DELIVERY DEADLINES: If you have a hard deadline for receipt that is before the processing time stated on Abe, eg, if you need it to arrive urgently before you travel or before a particular event, please contact me at the time of order to advise, so options can be discussed and steps taken to ensure it gets there in time.
RETURNS: Please return any items for refund within 30 days of the estimated delivery date, and contact me first with the reason for the return to establish whether postal costs will be included in the refund. If the item is not as described, I will cover the original and return post.