Proceedings of the 1984 Summer Study on the Design and Utilization of the Superconducting Super Collider, June 23-July 13, 1984, Snowmass, Colorado
Published by Division of Particles and Fields of the American Physical Society, 1984
- First Edition
- Hardcover
- Used
Seller: Ground Zero Books, Ltd., Silver Spring, MD, U.S.A.Ground Zero Books, Ltd.
AbeBooks seller since August 14, 1998
Condition: Used - Good
£ 95.36
Quantity: 1 available
Add to basketItem description from seller
xv, [1], 851, [1] pages. Illustrated endpapers. Illustrations, Figures. References. Author Index. Cover has some wear and soiling. Corners rubbed. Sticker residue on fep. Morfín is a senior scientist in the Particle Physics Division of Fermi National Accelerator laboratory. He received his Ph.D. from University of Michigan in 1970 and joined III Physikalisches Institut of Technische Hochschule Aachen to work on the Gargamelle experiment at CERN. He was deeply involved in the search for the weak neutral current, leading to its discovery in 1973, and in the determination of the structure of the nucleon. While at the TH Aachen he also participated in experiments using the large BEBC bubble chamber. As a founding member of CTEQ he proposed the CTEQ Summer School, an international school on QCD Analysis and Phenomenology. He is also currently on the editorial board of European Physics Journal C. He was vice-chair and chair of the International Physics Group (IPG) of the A.P.S., the forerunner of the current Forum on International Physics. He was a member of the APS Committee on International Scientific Affairs (CISA) and he was vice-chair and chair of Selection Committee for the A.P.S. Wheatley Award for promoting cooperation in International Physics. The Superconducting Super Collider (SSC) (also nicknamed the Desertron) was a particle accelerator complex under construction in the vicinity of Waxahachie, Texas. Its planned ring circumference was 87.1 kilometers (54.1 mi) with an energy of 20 TeV per proton and was set to be the world's largest and most energetic. It would have greatly surpassed the current record held by the Large Hadron Collider which has ring circumference 27 km (17 mi) and energy of 6.5 TeV per proton. The project's director was Roy Schwitters, a physicist at the University of Texas at Austin. Dr. Louis Ianniello served as its first Project Director for 15 months. The project was canceled in 1993 due to budget problems. During the design and the first construction stage, a heated debate ensued about the high cost of the project. In 1987, Congress was told the project could be completed for $4.4 billion, and it gained the enthusiastic support of Speaker Jim Wright of nearby Fort Worth, Texas. A recurring argument was the contrast with NASA's contribution to the International Space Station (ISS), a similar dollar amount. Critics of the project (Congressmen representing other US states and scientists working in non-SSC fields who felt the money would be better spent on their own fields) argued that the US could not afford both of them. Early in 1993 a group supported by funds from project contractors organized a public relations campaign to lobby Congress directly, but in June, the non-profit Project on Government Oversight released a draft audit report by the Department of Energy's Inspector General heavily criticizing the Super Collider for its high costs and poor management by officials in charge of it. Congress officially canceled the project October 21, 1993 after $2 billion had been spent. Many factors contributed to the cancellation: rising cost estimates (to $12bn); poor management by physicists and Department of Energy officials; the end of the need to prove the supremacy of American science with the collapse of the Soviet Union; belief that many smaller scientific experiments of equal merit could be funded for the same cost; Congress's desire to generally reduce spending (the USA was running a $255bn budget deficit); the reluctance of Texas Governor Ann Richards; and President Bill Clinton's initial lack of support for a project begun during the administrations of Richards's predecessor, Bill Clements, and Clinton's predecessors, Ronald Reagan and George H. W. Bush.…
Seller Inventory # 72359
Bibliographic details
- Title
- Proceedings of the 1984 Summer Study on the Design and Utilization of the Superconducting Super Collider, June 23-July 13, 1984, Snowmass, Colorado
- Author
- Donaldson, Rene (Editor), and Morfin, Jorge G. (Editor)
- Publisher
- Division of Particles and Fields of the American Physical Society
- Publication year
- 1984
- Condition
- Good +
- Binding
- Hardcover
- Edition
- Presumed first edition, first printing.
Ground Zero Books, Ltd.
Silver Spring, MD, U.S.A.
AbeBooks seller since August 14, 1998
Shipping rates within U.S.A.
| Item | 5 to 20 business days | 3 to 6 business days |
|---|---|---|
| First item | £ 3.70 | £ 5.56 |
Payment methods
- Check
- Invoice
- Money Order
- Paypal
Store description
Founded and operated by trained historians, Ground Zero Books, Ltd., serves the book collector, the scholar, and institutions. We focus on the individual, and pride ourselves on our personal service. Please contact us with your wants, as we have many books not yet listed in our database.
Specialty
Military History, Nuclear, American Revolution, Military Medicine, Vietnam, World War II, British Empire, World War I, Unit Histories, Civil WarSeller's business information
Ground Zero Books, Ltd.
9033 Georgia Avenue
Silver Spring, MD U.S.A. 20910-2254
Terms of sale
Books are subject to prior sale. Please ask us to hold a book for you before you
mail your check. Books are returnable within 7 days, if not satisfactory. MD
residents add 6% state sales tax.
The mailing address for Ground Zero Books, Ltd. (a subchapter-S corporation) is
P.O. Box 8369, Silver Spring, MD 20907-8369. You can reach us by phone at 301-
585-1471, by fax at 301-920-0253, or by e-mail at gzbooksltd@aol.com. Ground Zero
Books, Ltd., is owned & operated by R. Alan Lewis & Lynne Haims.
Right of withdrawal
If you are a consumer you can withdraw from the contract in accordance with the following. Consumer means any natural person who is acting for purposes which are outside his trade, business, craft or profession.
Information regarding the right of withdrawal
Statutory right to withdraw
You have the right to withdraw from this contract within 14 days without giving any reason.
The withdrawal period will expire after 14 days from the day on which you acquire, or a third party other than the carrier and indicated by you acquires, physical possession of the last good or the last lot or piece.
To exercise the right of withdrawal, electronically fill in and submit a clear statement on our website, under "My Purchases" in "My Account". We will communicate to you an acknowledgement of receipt of such a withdrawal on a durable medium (e.g. by e-mail) without delay.
To meet the withdrawal deadline, it is sufficient for you to send your communication concerning your exercise of the right of withdrawal before the withdrawal period has expired.
Effects of withdrawal
If you withdraw from this contract, we will reimburse to you all payments received from you, including the costs of delivery (except for the supplementary costs arising if you chose a type of delivery other than the least expensive type of standard delivery offered by us).
We may make a deduction from the reimbursement for loss in value of any goods supplied, if the loss is the result of unnecessary handling by you.
We will make the reimbursement without undue delay, and not later than 14 days after the day on which we are informed about your decision to withdraw from this contract.
We will make the reimbursement using the same means of payment as you used for the initial transaction, unless you have expressly agreed otherwise; in any event, you will not incur any fees as a result of such reimbursement.
We may withhold reimbursement until we have received the goods back, or you have supplied evidence of having sent back the goods, whichever is the earliest.
You shall send back the goods or hand them over to Ground Zero Books, Ltd., Silver Spring, Maryland, U.S.A., +1 240-316-0119, without undue delay and in any event not later than 14 days from the day on which you communicate your withdrawal from this contract to us. The deadline is met if you send back the goods before the period of 14 days has expired. You will have to bear the direct cost of returning the goods. You are only liable for any diminished value of the goods resulting from the handling other than what is necessary to establish the nature, characteristics and functioning of the goods.
Exceptions to the right of withdrawal
The right of withdrawal does not apply to:
- The delivery of newspapers, journals or magazines with the exception of subscription contracts; and
- The supply of digital content which is not supplied on a tangible medium (e.g. on a CD or DVD) if you accepted when you placed your order that we could start to deliver it, and that you could not withdraw once delivery had started.
Shipping terms
Orders usually ship within 2 business days. Shipping costs are based on books
weighing 2.2 LB, or 1 KG. If your book order is heavy or oversized, we may contact
you to let you know extra shipping is required.