Operation Morning Light; Nevada Test Site History DOE/NV - - 1198
Published by National Nuclear Security Administration, Nevada Site Office, Office of Public Affairs, Las Vegas, NV, 2010
- First Edition
- Used
Seller: Ground Zero Books, Ltd., Silver Spring, MD, U.S.A.Ground Zero Books, Ltd.
AbeBooks seller since August 14, 1998
Condition: Used - Very good
£ 15.48
Quantity: 2 available
Add to basketItem description from seller
Format is approximately 8.5 inches by 11 inches. Illustrations and text on both sides. The Nevada Test Site was the primary testing location of American nuclear devices from 1951 to 1992; 928 announced nuclear tests occurred there. Of those, 828 were underground. (Sixty-two of the underground tests included multiple, simultaneous nuclear detonations, adding 93 detonations and bringing the total number of NTS nuclear detonations to 1,021, of which 921 were underground.) The site is covered with subsidence craters from the testing. The NTS was the United States' primary location for tests smaller than 1 Mt (4.2 PJ). 126 tests were conducted elsewhere, including most larger tests. Many of these occurred at the Pacific Proving Grounds in the Marshall Islands. The last atmospheric test detonation at the Nevada Test Site was "Little Feller I" of Operation Sunbeam, on July 17, 1962. Kosmos 954 was a reconnaissance satellite launched by the Soviet Union in 1977. A malfunction prevented safe separation of its onboard nuclear reactor; when the satellite reentered the Earth's atmosphere the following year, it scattered radioactive debris over northern Canada, some of the debris landing in the Great Slave Lake next to Fort Resolution, NWT. This prompted an extensive cleanup operation known as Operation Morning Light. In mid-December North American Aerospace Defense Command, which had assigned the satellite the Satellite Catalog Number 10361, noticed Kosmos 954 making erratic maneuvers, changing the altitude of its orbit by up to 50 miles, as its Soviet operators struggled to control their failing spacecraft. In secret meetings, Soviet officials warned their US counterparts that they had lost control over the vehicle, and that the system which was intended to propel the spent reactor core into a safe disposal orbit had failed. At 11:53 GMT on 24 January 1978, Kosmos 954 reentered the Earth's atmosphere while traveling on a northeastward track over western Canada. At first the USSR claimed that the satellite had been completely destroyed during re-entry, but later searches showed debris from the satellite had been deposited on Canadian territory along a 600-kilometre (370 mi) path from Great Slave Lake to Baker Lake. The area spans portions of the Northwest Territories, present-day Nunavut, Alberta and Saskatchewan. The effort to recover radioactive material from the satellite was dubbed Operation Morning Light. Covering a total area of 124,000 square kilometers (48,000 sq mi), the joint CanadianAmerican team swept the area on foot and by air in Phase I from 24 January 1978 to 20 April 1978 and Phase II from 21 April 1978 to 15 October 1978. They were ultimately able to recover twelve large pieces of the satellite, ten of which were radioactive. These pieces displayed radioactivity of up to 1.1 sieverts per hour, yet they only comprised an estimated 1% of the fuel. Kosmos 954 was not the first nuclear-powered RORSAT to fail; a launch of a similar satellite in 1973 failed, dropping its reactor into the Pacific Ocean north of Japan. Subsequently, Kosmos 1402 also failed, dropping its reactor into the South Atlantic in 1983. Subsequent RORSATs were equipped with a backup core ejection mechanism, when the primary mechanism failed on Kosmos 1900 in 1988, this system succeeded in raising the core to a safe disposal orbit. Search teams did not find re-entry debris at the predicted location until they recalculated where that location would be based upon data indicating a stratospheric warming event had been in progress during re-entry. The stratospheric warming was first documented by the US Army Meteorological Rocket Network station at Poker Flat Research Range near Fairbanks, Alaska. Single sheet, printed on both sides Presumed First Edition, First 2010 printing thus.…
Seller Inventory # 90861
Bibliographic details
- Title
- Operation Morning Light; Nevada Test Site History DOE/NV - - 1198
- Author
- National Nuclear Security Administration, Nevada Site Office, Office of Public Affairs
- Publisher
- National Nuclear Security Administration, Nevada Site Office, Office of Public Affairs, Las Vegas, NV
- Publication year
- 2010
- Condition
- Very good
- Edition
- 1st Edition
- Seller catalogs
- Atomic Energy
Ground Zero Books, Ltd.
Silver Spring, MD, U.S.A.
AbeBooks seller since August 14, 1998
Shipping rates within U.S.A.
| Item | 5 to 20 business days | 3 to 6 business days |
|---|---|---|
| First item | £ 3.76 | £ 5.64 |
Payment methods
- Check
- Invoice
- Money Order
- Paypal
Store description
Founded and operated by trained historians, Ground Zero Books, Ltd., serves the book collector, the scholar, and institutions. We focus on the individual, and pride ourselves on our personal service. Please contact us with your wants, as we have many books not yet listed in our database.
Specialty
Military History, Nuclear, American Revolution, Military Medicine, Vietnam, World War II, British Empire, World War I, Unit Histories, Civil WarSeller's business information
Ground Zero Books, Ltd.
9033 Georgia Avenue
Silver Spring, MD U.S.A. 20910-2254
Terms of sale
Books are subject to prior sale. Please ask us to hold a book for you before you
mail your check. Books are returnable within 7 days, if not satisfactory. MD
residents add 6% state sales tax.
The mailing address for Ground Zero Books, Ltd. (a subchapter-S corporation) is
P.O. Box 8369, Silver Spring, MD 20907-8369. You can reach us by phone at 301-
585-1471, by fax at 301-920-0253, or by e-mail at gzbooksltd@aol.com. Ground Zero
Books, Ltd., is owned & operated by R. Alan Lewis & Lynne Haims.
Right of withdrawal
If you are a consumer you can withdraw from the contract in accordance with the following. Consumer means any natural person who is acting for purposes which are outside his trade, business, craft or profession.
Information regarding the right of withdrawal
Statutory right to withdraw
You have the right to withdraw from this contract within 14 days without giving any reason.
The withdrawal period will expire after 14 days from the day on which you acquire, or a third party other than the carrier and indicated by you acquires, physical possession of the last good or the last lot or piece.
To exercise the right of withdrawal, electronically fill in and submit a clear statement on our website, under "My Purchases" in "My Account". We will communicate to you an acknowledgement of receipt of such a withdrawal on a durable medium (e.g. by e-mail) without delay.
To meet the withdrawal deadline, it is sufficient for you to send your communication concerning your exercise of the right of withdrawal before the withdrawal period has expired.
Effects of withdrawal
If you withdraw from this contract, we will reimburse to you all payments received from you, including the costs of delivery (except for the supplementary costs arising if you chose a type of delivery other than the least expensive type of standard delivery offered by us).
We may make a deduction from the reimbursement for loss in value of any goods supplied, if the loss is the result of unnecessary handling by you.
We will make the reimbursement without undue delay, and not later than 14 days after the day on which we are informed about your decision to withdraw from this contract.
We will make the reimbursement using the same means of payment as you used for the initial transaction, unless you have expressly agreed otherwise; in any event, you will not incur any fees as a result of such reimbursement.
We may withhold reimbursement until we have received the goods back, or you have supplied evidence of having sent back the goods, whichever is the earliest.
You shall send back the goods or hand them over to Ground Zero Books, Ltd., Silver Spring, Maryland, U.S.A., +1 240-316-0119, without undue delay and in any event not later than 14 days from the day on which you communicate your withdrawal from this contract to us. The deadline is met if you send back the goods before the period of 14 days has expired. You will have to bear the direct cost of returning the goods. You are only liable for any diminished value of the goods resulting from the handling other than what is necessary to establish the nature, characteristics and functioning of the goods.
Exceptions to the right of withdrawal
The right of withdrawal does not apply to:
- The delivery of newspapers, journals or magazines with the exception of subscription contracts; and
- The supply of digital content which is not supplied on a tangible medium (e.g. on a CD or DVD) if you accepted when you placed your order that we could start to deliver it, and that you could not withdraw once delivery had started.
Shipping terms
Orders usually ship within 2 business days. Shipping costs are based on books
weighing 2.2 LB, or 1 KG. If your book order is heavy or oversized, we may contact
you to let you know extra shipping is required.