Improving Project Management in the Department of Energy
Language: English
Published by National Academy Press, Washington, DC, 1999
- First Edition
- Softcover
- Used

Seller: Ground Zero Books, Ltd., Silver Spring, MD, U.S.A.Ground Zero Books, Ltd.
AbeBooks seller since August 14, 1998
Condition: Used - Very good
£ 35.56
Quantity: 2 available
Add to basketItem description from seller
xii, 137, [1] pages. Wraps. Figures. Tables. References. Appendices. Glossary. Acronyms. Pencil erasure on title page. Project management is the discipline of initiating, planning, executing, controlling, and closing the work of a team to achieve specific goals and meet specific success criteria. A project is a temporary endeavor designed to produce a unique product, service or result with a defined beginning and end (usually time-constrained, and often constrained by funding or deliverable) undertaken to meet unique goals and objectives, typically to bring about beneficial change or added value. The temporary nature of projects stands in contrast with business as usual (or operations), which are repetitive, permanent, or semi-permanent functional activities to produce products or services. In practice, the management of such distinct production approaches requires the development of distinct technical skills and management strategies. The primary challenge of project management is to achieve all of the project goals within the given constraints. This information is usually described in project documentation, created at the beginning of the development process. The primary constraints are scope, time, quality and budget. The secondary - and more ambitious - challenge is to optimize the allocation of necessary inputs and apply them to meet pre-defined objectives. DOE requested that the National Research Council (NRC) conduct a study to review the policies, procedures, and practices used by DOE to identify, plan, design, and manage its portfolio of projects. The goal of the study was to develop recommendations to improve DOE's oversight and management of projects.The Board on Infrastructure and the Constructed Environment (BICE) advises the executive and legislative branches of government, other governmental and private sector organizations, and the general public on questions of technology, science, and public policy applied to: the design, construction, operations, maintenance, security, and evaluation of buildings, facilities, and infrastructure systems; the relationship between the constructed and natural environments and their interaction with human activities; the effects of natural and manmade hazards on constructed facilities and infrastructure the interdependencies of infrastructure systems (power, water, transportation, telecommunications, wastewater, buildings) and the potential for cascading failuresThe BICE brings together in an independent forum expertise from a wide range of scientific, engineering, and social science disciplines to address problems and issues in these areas. It provides a unique structure to respond to specific requests from government, or to act on its own initiative with public or private sector support. To respond to requests, the BICE oversees committee activities involving studies, briefings, workshops, symposia, and a variety of information dissemination activities.Established in 1946 as the Building Research Advisory Board, BICE and its predecessor organizations have been the principal units of the NRC concerned with the built environment. Although advisory services make up the bulk of BICE activities, a number of specific programs have been created and maintained over the years, the most significant and longest running of which is the Federal Facilities Council. Presumed First Edition, First printing [A limited number of copies of this report were available from the Board on Infrastructure and the Constructed Environment, National Research Council].…
Seller Inventory # 34865
- Title
- Improving Project Management in the Department of Energy
- Author
- National Research Council, Commission on Engineering and Technical Services, Board on Infrastructure and the Constructed Environment, Committee to Assess the Policies and Practices of the Department of Energy to Design, Manage, and Procure Environmental Restoration, Waste Management, and Other Construction Methods
- Publisher
- National Academy Press, Washington, DC
- Publication year
- 1999
- Condition
- very good
- Binding
- Trade paperback
- Language
- English
- ISBN 10
- 0309066263
- ISBN 13
- 9780309066266
- Edition
- 1st Edition
- Seller catalogs
- Environment
"Synopsis" may belong to another edition of this title.
About the Author
"About the title" may belong to another edition of this title.
Ground Zero Books, Ltd.
Silver Spring, MD, U.S.A.
AbeBooks seller since August 14, 1998
Shipping rates within U.S.A.
| Item | 5 to 20 business days | 3 to 6 business days |
|---|---|---|
| First item | £ 3.84 | £ 5.75 |
Payment methods
- Check
- Invoice
- Money Order
- Paypal
Store description
Founded and operated by trained historians, Ground Zero Books, Ltd., serves the book collector, the scholar, and institutions. We focus on the individual, and pride ourselves on our personal service. Please contact us with your wants, as we have many books not yet listed in our database.
Specialty
Military History, Nuclear, American Revolution, Military Medicine, Vietnam, World War II, British Empire, World War I, Unit Histories, Civil WarSeller's business information
Ground Zero Books, Ltd.
9033 Georgia Avenue
Silver Spring, MD U.S.A. 20910-2254
Terms of sale
Books are subject to prior sale. Please ask us to hold a book for you before you
mail your check. Books are returnable within 7 days, if not satisfactory. MD
residents add 6% state sales tax.
The mailing address for Ground Zero Books, Ltd. (a subchapter-S corporation) is
P.O. Box 8369, Silver Spring, MD 20907-8369. You can reach us by phone at 301-
585-1471, by fax at 301-920-0253, or by e-mail at gzbooksltd@aol.com. Ground Zero
Books, Ltd., is owned & operated by R. Alan Lewis & Lynne Haims.
Right of withdrawal
If you are a consumer you can withdraw from the contract in accordance with the following. Consumer means any natural person who is acting for purposes which are outside his trade, business, craft or profession.
Information regarding the right of withdrawal
Statutory right to withdraw
You have the right to withdraw from this contract within 14 days without giving any reason.
The withdrawal period will expire after 14 days from the day on which you acquire, or a third party other than the carrier and indicated by you acquires, physical possession of the last good or the last lot or piece.
To exercise the right of withdrawal, electronically fill in and submit a clear statement on our website, under "My Purchases" in "My Account". We will communicate to you an acknowledgement of receipt of such a withdrawal on a durable medium (e.g. by e-mail) without delay.
To meet the withdrawal deadline, it is sufficient for you to send your communication concerning your exercise of the right of withdrawal before the withdrawal period has expired.
Effects of withdrawal
If you withdraw from this contract, we will reimburse to you all payments received from you, including the costs of delivery (except for the supplementary costs arising if you chose a type of delivery other than the least expensive type of standard delivery offered by us).
We may make a deduction from the reimbursement for loss in value of any goods supplied, if the loss is the result of unnecessary handling by you.
We will make the reimbursement without undue delay, and not later than 14 days after the day on which we are informed about your decision to withdraw from this contract.
We will make the reimbursement using the same means of payment as you used for the initial transaction, unless you have expressly agreed otherwise; in any event, you will not incur any fees as a result of such reimbursement.
We may withhold reimbursement until we have received the goods back, or you have supplied evidence of having sent back the goods, whichever is the earliest.
You shall send back the goods or hand them over to Ground Zero Books, Ltd., Silver Spring, Maryland, U.S.A., +1 240-316-0119, without undue delay and in any event not later than 14 days from the day on which you communicate your withdrawal from this contract to us. The deadline is met if you send back the goods before the period of 14 days has expired. You will have to bear the direct cost of returning the goods. You are only liable for any diminished value of the goods resulting from the handling other than what is necessary to establish the nature, characteristics and functioning of the goods.
Exceptions to the right of withdrawal
The right of withdrawal does not apply to:
- The delivery of newspapers, journals or magazines with the exception of subscription contracts; and
- The supply of digital content which is not supplied on a tangible medium (e.g. on a CD or DVD) if you accepted when you placed your order that we could start to deliver it, and that you could not withdraw once delivery had started.
Shipping terms
Orders usually ship within 2 business days. Shipping costs are based on books
weighing 2.2 LB, or 1 KG. If your book order is heavy or oversized, we may contact
you to let you know extra shipping is required.