The History of Developing the National Space Transportation System; The Beginning through STS-75
Language: English
Published by Dennis R. Jenkins, Indian Harbor Beach, FL, 1996
- First Edition
- Hardcover
- Used

Seller: Ground Zero Books, Ltd., Silver Spring, MD, U.S.A.Ground Zero Books, Ltd.
AbeBooks seller since August 14, 1998
Condition: Used - Very good
£ 95.58
Quantity: 1 available
Add to basketItem description from seller
The format is approximately 8.75 inches by 11.25 inches. viii, 324, 20 pages. 29 cm. Illustrations (photographs and drawings). Tabular Data. Bibliography. Acronyms. Index. Illustrated covers. No dust jacket present. Space Shuttle goes behind the scenes and describes the technical aspects of the Space Shuttle. This revised 2nd edition covers 25 new Shuttle flights. This is a brief history of the technology that began the true 'space age. ' The Space Shuttle gave man the first 'routine' access to space, in much the same way that the DC-3 gave the first routine access to air travel. Dennis R. Jenkins worked as a contractor to NASA for 33 years, mostly on the Space Shuttle Program in a variety of engineering and management roles. After supporting the first few space shuttle launches at the Kennedy Space Center (KSC), he spent five years activating the Vandenberg Launch Site in California before the facility was closed following the Challenger accident. Returning to KSC, he supported recovering from the accident and a variety of special projects. In 2010 he became the USA project manager for the Orbiters on Display Working Group that delivered the space shuttle orbiters to the National Air and Space Museum, Intrepid Sea, Air, and Space Museum, California Science Center, and the KSC Visitor Complex. Afterward Jenkins became the project director for the Samuel Oschin Air and Space Center that will ultimately display Endeavour as a full launch stack. The Space Shuttle is a retired, partially reusable low Earth orbital spacecraft system operated from 1981 to 2011 by the U.S. National Aeronautics and Space Administration (NASA) as part of the Space Shuttle program. Its official program name was the Space Transportation System (STS), taken from the 1969 plan led by U.S. vice president Spiro Agnew for a system of reusable spacecraft where it was the only item funded for development. The first (STS-1) of four orbital test flights occurred in 1981, leading to operational flights (STS-5) beginning in 1982. Five complete Space Shuttle orbiter vehicles were built and flown on a total of 135 missions from 1981 to 2011. They launched from the Kennedy Space Center (KSC) in Florida. Operational missions launched numerous satellites, interplanetary probes, and the Hubble Space Telescope (HST), conducted science experiments in orbit, participated in the Shuttle-Mir program with Russia, and participated in the construction and servicing of the International Space Station (ISS). The Space Shuttle fleet's total mission time was 1,323 days. Space Shuttle components include the Orbiter Vehicle (OV) with three clustered Rocketdyne RS-25 main engines, a pair of recoverable solid rocket boosters (SRBs), and the expendable external tank (ET) containing liquid hydrogen and liquid oxygen. The Space Shuttle was launched vertically, like a conventional rocket, with the two SRBs operating in parallel with the orbiter's three main engines, which were fueled from the ET. The SRBs were jettisoned before the vehicle reached orbit, while the main engines continued to operate, and the ET was jettisoned after main engine cutoff and just before orbit insertion, which used the orbiter's two Orbital Maneuvering System (OMS) engines. At the conclusion of the mission, the orbiter fired its OMS to deorbit and reenter the atmosphere. The orbiter was protected during reentry by its thermal protection system tiles, and it glided as a spaceplane to a runway landing, usually to the Shuttle Landing Facility at KSC, Florida, or to Rogers Dry Lake in Edwards Air Force Base, California. If the landing occurred at Edwards, the orbiter was flown back to the KSC atop the Shuttle Carrier Aircraft (SCA), a specially modified Boeing 747 designed to carry the shuttle above it. The first orbiter, Enterprise, was built in 1976 and used in Approach and Landing Tests (ALT), but had no orbital capability. Four fully operational orbiters were initially built: Columbia, Challenger, Discovery, and A.…
Seller Inventory # 90240
Bibliographic details
- Title
- The History of Developing the National Space Transportation System; The Beginning through STS-75
- Author
- Jenkins, Dennis R.
- Publisher
- Dennis R. Jenkins, Indian Harbor Beach, FL
- Publication year
- 1996
- Condition
- Very good
- Binding
- Hardcover
- Language
- English
- ISBN 10
- 0963397443
- ISBN 13
- 9780963397447
- Edition
- 1st Edition
- Seller catalogs
- NASA
Ground Zero Books, Ltd.
Silver Spring, MD, U.S.A.
AbeBooks seller since August 14, 1998
Shipping rates within U.S.A.
| Item | 5 to 20 business days | 3 to 6 business days |
|---|---|---|
| First item | £ 3.71 | £ 5.57 |
Payment methods
- Check
- Invoice
- Money Order
- Paypal
Store description
Founded and operated by trained historians, Ground Zero Books, Ltd., serves the book collector, the scholar, and institutions. We focus on the individual, and pride ourselves on our personal service. Please contact us with your wants, as we have many books not yet listed in our database.
Specialty
Military History, Nuclear, American Revolution, Military Medicine, Vietnam, World War II, British Empire, World War I, Unit Histories, Civil WarSeller's business information
Ground Zero Books, Ltd.
9033 Georgia Avenue
Silver Spring, MD U.S.A. 20910-2254
Terms of sale
Books are subject to prior sale. Please ask us to hold a book for you before you
mail your check. Books are returnable within 7 days, if not satisfactory. MD
residents add 6% state sales tax.
The mailing address for Ground Zero Books, Ltd. (a subchapter-S corporation) is
P.O. Box 8369, Silver Spring, MD 20907-8369. You can reach us by phone at 301-
585-1471, by fax at 301-920-0253, or by e-mail at gzbooksltd@aol.com. Ground Zero
Books, Ltd., is owned & operated by R. Alan Lewis & Lynne Haims.
Right of withdrawal
If you are a consumer you can withdraw from the contract in accordance with the following. Consumer means any natural person who is acting for purposes which are outside his trade, business, craft or profession.
Information regarding the right of withdrawal
Statutory right to withdraw
You have the right to withdraw from this contract within 14 days without giving any reason.
The withdrawal period will expire after 14 days from the day on which you acquire, or a third party other than the carrier and indicated by you acquires, physical possession of the last good or the last lot or piece.
To exercise the right of withdrawal, electronically fill in and submit a clear statement on our website, under "My Purchases" in "My Account". We will communicate to you an acknowledgement of receipt of such a withdrawal on a durable medium (e.g. by e-mail) without delay.
To meet the withdrawal deadline, it is sufficient for you to send your communication concerning your exercise of the right of withdrawal before the withdrawal period has expired.
Effects of withdrawal
If you withdraw from this contract, we will reimburse to you all payments received from you, including the costs of delivery (except for the supplementary costs arising if you chose a type of delivery other than the least expensive type of standard delivery offered by us).
We may make a deduction from the reimbursement for loss in value of any goods supplied, if the loss is the result of unnecessary handling by you.
We will make the reimbursement without undue delay, and not later than 14 days after the day on which we are informed about your decision to withdraw from this contract.
We will make the reimbursement using the same means of payment as you used for the initial transaction, unless you have expressly agreed otherwise; in any event, you will not incur any fees as a result of such reimbursement.
We may withhold reimbursement until we have received the goods back, or you have supplied evidence of having sent back the goods, whichever is the earliest.
You shall send back the goods or hand them over to Ground Zero Books, Ltd., Silver Spring, Maryland, U.S.A., +1 240-316-0119, without undue delay and in any event not later than 14 days from the day on which you communicate your withdrawal from this contract to us. The deadline is met if you send back the goods before the period of 14 days has expired. You will have to bear the direct cost of returning the goods. You are only liable for any diminished value of the goods resulting from the handling other than what is necessary to establish the nature, characteristics and functioning of the goods.
Exceptions to the right of withdrawal
The right of withdrawal does not apply to:
- The delivery of newspapers, journals or magazines with the exception of subscription contracts; and
- The supply of digital content which is not supplied on a tangible medium (e.g. on a CD or DVD) if you accepted when you placed your order that we could start to deliver it, and that you could not withdraw once delivery had started.
Shipping terms
Orders usually ship within 2 business days. Shipping costs are based on books
weighing 2.2 LB, or 1 KG. If your book order is heavy or oversized, we may contact
you to let you know extra shipping is required.