Battle Flight: RAF Air Defence Projects and Weapons Since 1945
Language: English
Published by Hikoki Publications, 2012
- First Edition
- Hardcover
- Used

Seller: Between The Boards, Connahs Quay, United KingdomBetween The Boards
AbeBooks seller since March 1, 2010
Condition: Used - As new
£ 145.00
Quantity: 1 available
Add to basketItem description from seller
UK 1st edition 1st impression, no inscriptions not price clipped. As new.
Seller Inventory # Scs3558
- Title
- Battle Flight: RAF Air Defence Projects and Weapons Since 1945
- Author
- Gibson, Chris
- Publisher
- Hikoki Publications
- Publication year
- 2012
- Condition
- As new
- Dust jacket
- Fine
- Binding
- Hardcover
- Language
- English
- ISBN 10
- 1902109260
- ISBN 13
- 9781902109268
- Edition
- 1st Edition
- Printing
- 1st Printing
- Item weight
- 1,157 grams
- Dimensions
- 21.91 centimeters width by 30.48 centimeters height by 2.22 centimeters depth
Following WWII, Britain's air defences comprised a mix of interceptors and anti-aircraft guns that were tailored to counter mass bomber raids by piston-engine aircraft. These defences were rendered obsolete by the jet engine and the atomic bomb and the search for a cost-effective anti-aircraft system began. Interceptors were the obvious first line of defence and would remain so to this day, but unguided rockets and new surface-to-air guided-weapons (SAGW) were also examined. Wartime advances in guided weapons had ended, the teams dispersed, and the work forgotten, but such weapons were soon prioritized.
Defensive weapons required control systems and plans were drawn up to integrate radar, command, control, and interception. These plans (Nucleus, Igloo, Rotor, Ahead, and Linesman) changed radically over a 20-year period, reflecting the rapid advance of technology in the post-war period. The 1960s saw stabilization with the interceptors as the main defence and SAMs to protect the V-bomber bases. All thoughts of ABMs were discarded, as the ballistic missile became the primary deterrent on both sides. By the 1980s the advent of long-range interceptors such as Tornado saw a change in the protection of north Atlantic convoys from Soviet attacks.
As the 21st century dawned the spectre of terrorism and airborne threat changed to include the possibility of shooting down hijacked airliners, Britain's air defences diminished to 5 squadrons of Typhoons and the Aster SAMs of the Royal Navy, and Russian Air Force's Blackjacks and Bears still make forays into Britain's air defence zone.
Battle Flight provides an in-depth examination of the history of Britain's air defence offering an insight into evolution up to the present day.
"Synopsis" may belong to another edition of this title.
About the Author
"About the title" may belong to another edition of this title.
Between The Boards
Connahs Quay, United Kingdom
AbeBooks seller since March 1, 2010
Shipping rates from United Kingdom to U.S.A.
| Item | 12 to 20 business days | 12 to 20 business days |
|---|---|---|
| First item | £ 31.00 | £ 31.00 |
Payment methods
Seller's business information
Between The Boards
United Kingdom
Terms of sale
Returns and Refunds in agreement with the Abebooks policies.
Right of withdrawal
If you are a consumer you can withdraw from the contract in accordance with the following. Consumer means any natural person who is acting for purposes which are outside his trade, business, craft or profession.
Information regarding the right of withdrawal
Statutory right to withdraw
You have the right to withdraw from this contract within 14 days without giving any reason.
The withdrawal period will expire after 14 days from the day on which you acquire, or a third party other than the carrier and indicated by you acquires, physical possession of the last good or the last lot or piece.
To exercise the right of withdrawal, electronically fill in and submit a clear statement on our website, under "My Purchases" in "My Account". We will communicate to you an acknowledgement of receipt of such a withdrawal on a durable medium (e.g. by e-mail) without delay.
To meet the withdrawal deadline, it is sufficient for you to send your communication concerning your exercise of the right of withdrawal before the withdrawal period has expired.
Effects of withdrawal
If you withdraw from this contract, we will reimburse to you all payments received from you, including the costs of delivery (except for the supplementary costs arising if you chose a type of delivery other than the least expensive type of standard delivery offered by us).
We may make a deduction from the reimbursement for loss in value of any goods supplied, if the loss is the result of unnecessary handling by you.
We will make the reimbursement without undue delay, and not later than 14 days after the day on which we are informed about your decision to withdraw from this contract.
We will make the reimbursement using the same means of payment as you used for the initial transaction, unless you have expressly agreed otherwise; in any event, you will not incur any fees as a result of such reimbursement.
We may withhold reimbursement until we have received the goods back, or you have supplied evidence of having sent back the goods, whichever is the earliest.
You shall send back the goods or hand them over to Between The Boards, Connahs Quay, United Kingdom, without undue delay and in any event not later than 14 days from the day on which you communicate your withdrawal from this contract to us. The deadline is met if you send back the goods before the period of 14 days has expired. You will have to bear the direct cost of returning the goods. You are only liable for any diminished value of the goods resulting from the handling other than what is necessary to establish the nature, characteristics and functioning of the goods.
Exceptions to the right of withdrawal
The right of withdrawal does not apply to:
- The delivery of newspapers, journals or magazines with the exception of subscription contracts; and
- The supply of digital content which is not supplied on a tangible medium (e.g. on a CD or DVD) if you accepted when you placed your order that we could start to deliver it, and that you could not withdraw once delivery had started.
Shipping terms
Shipping costs are based on books weighing 2.2 LB, or 1 KG. If your book order is heavy or oversized, we may contact you to let you know extra shipping is required.