Resource Constrained Project Scheduling Exact (10 results)

Title: 
Refine with Advanced Search

Refine your search

  • Books (10)

to

Custom price range (£)

to

  • Language: English

    Published by Springer, 1994

    354057834X / 9783540578345

    • Softcover

    Seller: -OnTimeBooks-, Phoenix, AZ, U.S.A.-OnTimeBooks-

    5-star seller
    Contact seller

    Condition: Used - Good

    £ 71.04

     Free Shipping 
    Ships within U.S.A.

    Quantity: 1 available

    Condition: good. A copy that has been read, remains in good condition. All pages are intact, and the cover is intact. The spine and cover show signs of wear. Pages can include notes and highlighting and show signs of wear, and the copy can include "From the library of" labels or previous owner inscriptions. 100% GUARANTEE! Shipped with delivery confirmation, if you're not satisfied with purchase please return item! Ships via media mail.…

  • Language: English

    Published by Springer 1994-05, 1994

    354057834X / 9783540578345

    • Softcover

    Seller: Chiron Media, Wallingford, United KingdomChiron Media

    5-star seller
    Contact seller

    Condition: New

    £ 89.30

    £ 15.49 shipping 
    Ships from United Kingdom to U.S.A.

    Quantity: 10 available

    PF. Condition: New.

  • Language: English

    Published by Springer, 1994

    354057834X / 9783540578345

    • Softcover

    Seller: Ria Christie Collections, Uxbridge, United KingdomRia Christie Collections

    5-star seller
    Contact seller

    Condition: New

    £ 101.07

    £ 9.37 shipping 
    Ships from United Kingdom to U.S.A.

    Quantity: Over 20 available

    Condition: New. In English.

  • Language: English

    Published by Springer, 1994

    354057834X / 9783540578345

    • Softcover

    Seller: AHA-BUCH GmbH, Einbeck, GermanyAHA-BUCH GmbH

    5-star seller
    Contact seller

    Condition: New

    £ 103.90

    £ 30.10 shipping 
    Ships from Germany to U.S.A.

    Quantity: 1 available

    Taschenbuch. Condition: Neu. Druck auf Anfrage Neuware - Printed after ordering - Within a project human and non-human resources are pulled together in a tempo raray organization in order to achieve a predefined goal (d. [20], p. 187). That is, in contrast to manufacturing management, project management is directed to an end. One major function of project management is the scheduling of the project. Project scheduling is the time-based arrangement of the activities comprising the project subject to precedence-, time-and resource-constraints (d. [4], p. 170). In the 1950's the standard methods MPM (Metra Potential Method) and CPM (Cri tical Path Method) were developed. Given deterministic durations and precedence constraints the minimum project length, time windows for the start times and critical paths can be calculated. At the same time another group of researchers developed the Program Evaluation and Review Technique (PERT) (d. [19], [73] and [90]). In contrast to MPM and CPM, random variables describe the activity durations. Based on the optimistic, most likely and pessimistic estimations of the activity durations an assumed Beta distribution is derived in order to calculate the distribution of the project duration, the critical events, the distribution of earliest and latest occurence of an event, the distribution of the slack of the events and the probability of exceeding a date. By the time the estimates of the distributions have been improved (d. e.g. [52] and [56]). Nevertheless, there are some points of critique concerning the estimation of the resulting distributions and probabilities (d. e.g. [48], [49] and [50]).…

  • Language: English

    Published by Springer, 1994

    354057834X / 9783540578345

    • Softcover

    Seller: Revaluation Books, Exeter, United KingdomRevaluation Books

    5-star seller
    Contact seller

    Condition: New

    £ 127.97

    £ 10.00 shipping 
    Ships from United Kingdom to U.S.A.

    Quantity: 2 available

    Paperback. Condition: Brand New. reprint edition. 154 pages. 9.20x6.10x0.37 inches. In Stock.

  • Language: English

    Published by Springer, 1994

    354057834X / 9783540578345

    • Softcover

    Seller: Mispah books, Redhill, SURRE, United KingdomMispah books

    4-star seller
    Contact seller

    Condition: Used - As new

    £ 137.00

    £ 25.00 shipping 
    Ships from United Kingdom to U.S.A.

    Quantity: 1 available

    Paperback. Condition: Like New. Like New. book.

  • Language: English

    Published by Springer Spektrum, 1994

    354057834X / 9783540578345

    • Softcover

    Seller: Buchpark, Trebbin, GermanyBuchpark

    5-star seller
    Contact seller

    Condition: Used - Very good

    £ 73.92

    £ 90.31 shipping 
    Ships from Germany to U.S.A.

    Quantity: 4 available

    Condition: Gut. Zustand: Gut | Sprache: Englisch | Produktart: Bücher | Within a project human and non-human resources are pulled together in a tempo­ raray organization in order to achieve a predefined goal (d. [20], p. 187). That is, in contrast to manufacturing management, project management is directed to an end. One major function of project management is the scheduling of the project. Project scheduling is the time-based arrangement of the activities comprising the project subject to precedence-, time-and resource-constraints (d. [4], p. 170). In the 1950's the standard methods MPM (Metra Potential Method) and CPM (Cri­ tical Path Method) were developed. Given deterministic durations and precedence­ constraints the minimum project length, time windows for the start times and critical paths can be calculated. At the same time another group of researchers developed the Program Evaluation and Review Technique (PERT) (d. [19], [73] and [90]). In contrast to MPM and CPM, random variables describe the activity durations. Based on the optimistic, most likely and pessimistic estimations of the activity durations an assumed Beta­ distribution is derived in order to calculate the distribution of the project duration, the critical events, the distribution of earliest and latest occurence of an event, the distribution of the slack of the events and the probability of exceeding a date. By the time the estimates of the distributions have been improved (d. e.g. [52] and [56]). Nevertheless, there are some points of critique concerning the estimation of the resulting distributions and probabilities (d. e.g. [48], [49] and [50]).…

  • Language: English

    Published by Springer Spektrum, 1994

    354057834X / 9783540578345

    • Softcover

    Seller: Buchpark, Trebbin, GermanyBuchpark

    5-star seller
    Contact seller

    Condition: Used - Fine

    £ 76.14

    £ 90.31 shipping 
    Ships from Germany to U.S.A.

    Quantity: 1 available

    Condition: Sehr gut. Zustand: Sehr gut | Sprache: Englisch | Produktart: Bücher | Within a project human and non-human resources are pulled together in a tempo­ raray organization in order to achieve a predefined goal (d. [20], p. 187). That is, in contrast to manufacturing management, project management is directed to an end. One major function of project management is the scheduling of the project. Project scheduling is the time-based arrangement of the activities comprising the project subject to precedence-, time-and resource-constraints (d. [4], p. 170). In the 1950's the standard methods MPM (Metra Potential Method) and CPM (Cri­ tical Path Method) were developed. Given deterministic durations and precedence­ constraints the minimum project length, time windows for the start times and critical paths can be calculated. At the same time another group of researchers developed the Program Evaluation and Review Technique (PERT) (d. [19], [73] and [90]). In contrast to MPM and CPM, random variables describe the activity durations. Based on the optimistic, most likely and pessimistic estimations of the activity durations an assumed Beta­ distribution is derived in order to calculate the distribution of the project duration, the critical events, the distribution of earliest and latest occurence of an event, the distribution of the slack of the events and the probability of exceeding a date. By the time the estimates of the distributions have been improved (d. e.g. [52] and [56]). Nevertheless, there are some points of critique concerning the estimation of the resulting distributions and probabilities (d. e.g. [48], [49] and [50]).…

  • Language: English

    Published by Springer Verlag, 1994

    038757834X / 9780387578347

    • Softcover

    Seller: Mispah books, Redhill, SURRE, United KingdomMispah books

    4-star seller
    Contact seller

    Condition: Used - As new

    £ 150.00

    £ 25.00 shipping 
    Ships from United Kingdom to U.S.A.

    Quantity: 1 available

    Paperback. Condition: Like New. LIKE NEW. SHIPS FROM MULTIPLE LOCATIONS. book.

  • More images

    Language: English

    Published by Springer, 1994

    354057834X / 9783540578345

    • Softcover
    • Print on Demand

    Seller: preigu, Osnabrück, Germanypreigu

    5-star seller
    Contact seller

    Condition: New

    £ 84.78

    £ 60.21 shipping 
    Ships from Germany to U.S.A.

    Quantity: 5 available

    Taschenbuch. Condition: Neu. Resource-Constrained Project Scheduling | Exact Methods for the Multi-Mode Case | Arno Sprecher | Taschenbuch | Lecture Notes in Economics and Mathematical Systems | xii | Englisch | 1994 | Springer | EAN 9783540578345 | Verantwortliche Person für die EU: Springer Verlag GmbH, Tiergartenstr. 17, 69121 Heidelberg, juergen[dot]hartmann[at]springer[dot]com | Anbieter: preigu Print on Demand.…