Language: English
Published by Pitman, 1964
Seller: A Squared Books (Don Dewhirst), South Lyon, MI, U.S.A.
Hardcover. Condition: Very Good. Dust Jacket Condition: Very Good. Black cloth covered boards with silver spine titles; jacket has mild edge wear, with a few small chips and tears along edges; 8vo - over 7 3/4" to 9 3/4" tall; interior clean and unmarked; 111 pages.
Hardcover. Condition: Good. Third edition. Light wear to boards. Content is clean and bright. Good DJ with some edge wear and fading.
Hardback. Condition: Good. The book has been read but remains in clean condition. All pages are intact and the cover is intact. Some minor wear to the spine.
Hardback. Condition: Used: Acceptable. Hardback with D/J in good condition. Ex library with first page removed. 3rd edition Pitman 1969. - used books, secondhand books, out of print books, hard to find books, for sale, second-hand books, college books, student books, nonfiction, first edition, signed copies, non-fiction books delivered world wide. Excess postage may be required for books over 1 kg in weight outside the EU. ISBN 0-273-40544-6 0273405446.
Language: English
Published by Pitman
Seller: Anybook.com, Lincoln, United Kingdom
Hardcover. Condition: Fair. Dust Jacket Included. This book has hardback covers. Ex-library, With usual stamps and markings, In fair condition, suitable as a study copy. Dust Jacket in fair condition. Please note the Image in this listing is a stock photo and may not match the covers of the actual item,400grams, ISBN:
Condition: Fair. This is an ex-library book and may have the usual library/used-book markings inside.This book has soft covers. In fair condition, suitable as a study copy. Please note the Image in this listing is a stock photo and may not match the covers of the actual item,400grams, ISBN:0273011774.
Condition: Poor. This is an ex-library book and may have the usual library/used-book markings inside.This book has soft covers. In poor condition, suitable as a reading copy. Please note the Image in this listing is a stock photo and may not match the covers of the actual item,400grams, ISBN:0273011774.
Language: English
Published by Sir Isaac Pitman & Sons, 1969
ISBN 10: 0273405446 ISBN 13: 9780273405443
Seller: Anybook.com, Lincoln, United Kingdom
Condition: Good. This is an ex-library book and may have the usual library/used-book markings inside.This book has hardback covers. In good all round condition. Dust jacket in fair condition. Please note the Image in this listing is a stock photo and may not match the covers of the actual item,450grams, ISBN:0273405446.
Published by Sir Isaac Pitman and Sons Ltd, 1964
Seller: BoundlessBookstore, Wallingford, United Kingdom
Condition: Good. DJ may have small chips and tears. Book will have been read but remains clean. Cover may have light wear or slight soiling. Pages may be slightly tanned. May contain inscriptions.
Black Cloth. Condition: Near Fine. Dust Jacket Condition: Near Fine. Reprint. illustrated by b/w. diagrams & charts; "this third edition of the pioneer work on Critical Path Analysis is suitable for both student and practitioner. It contains the distillation of wide experience in teaching and using C. P. A. and embraces all the useful manipulations and calculations currently being used. No mathematical expertise is implied or required. Critical Path Analysis (CPA) is a project management tool that sets out all the individual activities that make up a larger project & shows the order in which activities have to be undertaken including which activities can only take place once other activities have been completed & which activities can be undertaken simultaneously, thereby reducing the overall time taken to complete the whole project."; including index - 219 pages. Size: 8vo - over 7¾" - 9¾" tall. Quantity Available: 1. Category: Science & Technology; C. P. A.; Project Planning; Engineering, Industrial, Trade. ISBN: 0273405446. ISBN/EAN: 9780273405443. Inventory No: SCE00042.
Published by Pitman Publishing, 1965
Seller: World of Rare Books, Goring-by-Sea, SXW, United Kingdom
Condition: Good. 1965. 111 pages. No dust jacket. Black cloth. Pages are lightly tanned and thumbed at the edges, with light foxing. Binding has remained firm. Boards are a little rub worn, slight shelf wear to corners, spine and edges. Corners are a little bumped. Spine ends are mildly crushed. Light tanning to spine and edges. Boards are bowed. Book has a forward lean.
Published by PITMAN
Seller: Kennys Bookstore, Olney, MD, U.S.A.
Condition: As New. 1964. Reprint. Hardcover. Clean copy. . . . . Books ship from the US and Ireland.
Published by PITMAN, 1964
Seller: Kennys Bookshop and Art Galleries Ltd., Galway, GY, Ireland
Condition: As New. 1964. Reprint. Hardcover. Clean copy. . . . .
Published by Sir Isaac Pitman & Sons, 1965
Seller: Anybook.com, Lincoln, United Kingdom
Condition: Good. This is an ex-library book and may have the usual library/used-book markings inside.This book has hardback covers. Clean from markings. In good all round condition. No dust jacket. Please note the Image in this listing is a stock photo and may not match the covers of the actual item,350grams, ISBN:
Language: English
Published by Sir Isaac Pitman & Sons Ltd, London, 1969
ISBN 10: 0273405446 ISBN 13: 9780273405443
Seller: J J Basset Books, bassettbooks, bookfarm.co.uk, Peter Tavy, United Kingdom
Black Cloth. Condition: Very Good. No Jacket. Diagrams (illustrator). Third Edition. Please Email for further details. Size: 8vo - over 7¾" - 9¾". Signed By a "J.A Sherman".
Published by Pitman
Seller: Chapter Two Books, Ammanford, United Kingdom
Hardback. Condition: Good. Hardback. With dust jacket. Photograph available on request.
Language: English
Published by Pitman, London, 1969
Seller: Marion Pitman Books, Reading, United Kingdom
Hardcover. Condition: Very Good. Dust Jacket Condition: Good. Third Edition. D/w bit worn & frayed on edges, sm. tear in back.
Published by Pitman, London, 1969
Seller: Laura Books, Georgetown, SA, Australia
Hard Cover. Condition: Very Good. Dust Jacket Condition: Good. 3rd Edition. owners name front endpaper, otherwise book clean and tight. DJ: some wear Size: 8vo - over 7¾" - 9¾" tall.
Language: English
Published by PITMAN, 1964
Seller: NEPO UG, Rüsselsheim am Main, Germany
Gebundene Ausgabe. Condition: Gut. 111 Seiten Versand sofort weltweit. Rechnung mit ausgewiesener MwSt. Bibliotheksexemplar. Worldwide shipping with invoice. Ex library Sprache: Englisch Gewicht in Gramm: 550.
Published by Pitman, 1967
Seller: BookDepart, Shepherdstown, WV, U.S.A.
Hardcover. Condition: UsedGood. Hardcover, 2nd edition; surplus library copy with the usual stampings; reference number taped to dust jacket spine; light shelf wear, light fading to exterior; a few coffee-colored marks at bottom outside page edge; otherwise in good condition with clean text, firm binding. Dust jacket, light fading, light shelf wear; wrapped in protective Mylar sleeve.
Published by Sir Isaac Pitman & Sons, London England, 1965
Seller: The London Bookworm, East Sussex, United Kingdom
Cloth. Condition: Very Good. No Jacket. Reprinted With Minor Amendments. Hardcover. An Introduction to Vritical Path Analysis. Previous owners name to inside cover. Slightly sunned top edge of cloth. Black cloth with silver lettering. Contents: Preface. Introductory. The Elements of a Network. Drawing the Network. Analysing the Network: Isolating the Critical Path. Analysing the Network: Float or Slack. Reducing the Project Time. The Arrow Diagram and the Gantt Chart. Loading. Control and Critical Path Analysis. Uncertainty. Slected Reading. Index. Illustrations. 111 pp. (We carry a wide selection of titles in The Arts, Theology, History, Politics, Social and Physical Sciences. academic and scholarly books and Modern First Editions, Reference books ,and all types of Academic Literature.).
Published by Pitman Publishing, New York, 1967
Seller: Rare Book Cellar, Pomona, NY, U.S.A.
Hardcover. Second Edition. Near Fine in a Very Good+ dust jacket.
Published by Sir Isaac Pitman & Sons Ltd, London, 1967
Seller: Pulp Fiction Murwillumbah, Murwillumbah, NSW, Australia
Hardcover. Condition: Very Good. Dust Jacket Condition: Fair. 2nd. Dust jacket is chipped and clipped, there is some foxing to the endpapers, and a small inscription.