Critical Path Methods Building (3 results)

- Hardcover
Seller: ThriftBooks-Dallas, Dallas, TX, U.S.A.ThriftBooks-Dallas
Contact seller5-star sellerCondition: Used - Fair
£ 12.28
Free ShippingShips within U.S.A.Quantity: 1 available
Hardcover. Condition: Fair. No Jacket. Readable copy. Pages may have considerable notes/highlighting. ~ ThriftBooks: Read More, Spend Less.

- Hardcover
- First Edition
Seller: Rob the Book Man, Vancouver, WA, U.S.A.Rob the Book Man
Contact seller4-star sellerCondition: Used - Very good
£ 21.15
£ 5.22 shippingShips within U.S.A.Quantity: 1 available
Hardcover. Condition: Very Good. Dust Jacket Condition: Fair. 1st Edition. Hardback in very good condition with a fair dust jacket.

- Hardcover
Seller: BookDepart, Shepherdstown, WV, U.S.A.BookDepart
Contact seller5-star sellerCondition: Used - Very good
£ 27.32
£ 6.30 shippingShips within U.S.A.Quantity: 1 available
Hardcover. Condition: UsedVeryGood. Hardcover; light fading, light shelf wear to exterior; otherwise in very go od condition with clean text, firm binding.