Published by Pearson College Div (edition First Edition), 2004
ISBN 10: 0131133373 ISBN 13: 9780131133372
Language: English
Seller: BooksRun, Philadelphia, PA, U.S.A.
First Edition
£ 17.99
Convert currencyQuantity: 1 available
Add to basketHardcover. Condition: Fair. First Edition. Heavy wear. Ship within 24hrs. Satisfaction 100% guaranteed. APO/FPO addresses supported.
£ 19.83
Convert currencyQuantity: 1 available
Add to basketHardcover. Condition: Good. No Jacket. Pages can have notes/highlighting. Spine may show signs of wear. ~ ThriftBooks: Read More, Spend Less 1.94.
£ 19.79
Convert currencyQuantity: 1 available
Add to basketCondition: Good. Item in good condition. Textbooks may not include supplemental items i.e. CDs, access codes etc.
£ 37.27
Convert currencyQuantity: 1 available
Add to basketCondition: Very Good. Item in very good condition! Textbooks may not include supplemental items i.e. CDs, access codes etc.
Condition: Poor. This is an ex-library book and may have the usual library/used-book markings inside.This book has hardback covers. In poor condition, suitable as a reading copy. No dust jacket. CD missing . Please note the Image in this listing is a stock photo and may not match the covers of the actual item,950grams, ISBN:9780131133372.
£ 66.40
Convert currencyQuantity: 1 available
Add to basketHardcover. Condition: Fair. 2. Supplements included Ship within 24hrs. Satisfaction 100% guaranteed. APO/FPO addresses supported.
Seller: BooksRun, Philadelphia, PA, U.S.A.
£ 66.96
Convert currencyQuantity: 1 available
Add to basketHardcover. Condition: Good. 2. Supplements not included Ship within 24hrs. Satisfaction 100% guaranteed. APO/FPO addresses supported.
£ 16.60
Convert currencyQuantity: 1 available
Add to baskethardcover. Condition: Good. The item is in good condition and works perfectly, however it is showing some signs of previous ownership which could include: small tears, scuffing, notes, highlighting, gift inscriptions, and library markings.
Seller: Anybook.com, Lincoln, United Kingdom
Condition: Fair. This is an ex-library book and may have the usual library/used-book markings inside.This book has hardback covers. In fair condition, suitable as a study copy. No dust jacket. Please note the Image in this listing is a stock photo and may not match the covers of the actual item,850grams, ISBN:9780135137826.
£ 16.79
Convert currencyQuantity: 1 available
Add to baskethardcover. Condition: Good. Connecting readers with great books since 1972! Used textbooks may not include companion materials such as access codes, etc. May have some wear or writing/highlighting. We ship orders daily and Customer Service is our top priority!
£ 65.76
Convert currencyQuantity: 2 available
Add to basketHardcover. Condition: Good. May contain highlighting/underlining/notes/etc. May have used stickers on cover. Access codes and supplements are not guaranteed to be included with used books. DVD/CD included. Ships same or next day. Expedited shipping: 3-5 business days, Standard shipping: 4-14 business days.
Seller: Meadowland Media, Fayetteville, AR, U.S.A.
£ 83.72
Convert currencyQuantity: 1 available
Add to baskethardcover. still has cd book has heavy wear.
£ 154.09
Convert currencyQuantity: 1 available
Add to basketCondition: Very Good.
£ 194.68
Convert currencyQuantity: 1 available
Add to basketHardcover. Condition: new. Excellent Condition.Excels in customer satisfaction, prompt replies, and quality checks.
£ 252.29
Convert currencyQuantity: Over 20 available
Add to basketCondition: New. Brand new! Please provide a physical shipping address.
£ 383.54
Convert currencyQuantity: 1 available
Add to basketHardcover. Condition: new. Excellent Condition.Excels in customer satisfaction, prompt replies, and quality checks.