Construction Scheduling Primavera by Marchman David (5 results)

- Softcover
Seller: BooksRun, Philadelphia, PA, U.S.A.BooksRun
Contact seller5-star sellerCondition: Used - Fair
£ 6.13
Free ShippingShips within U.S.A.Quantity: 1 available
Paperback. Condition: Fair. 1. The item might be beaten up but readable. May contain markings or highlighting, as well as stains, bent corners, or any other major defect, but the text is not obscured in any way.

- Softcover
Seller: ThriftBooks-Dallas, Dallas, TX, U.S.A.ThriftBooks-Dallas
Contact seller5-star sellerCondition: Used - Fair
£ 18.36
Free ShippingShips within U.S.A.Quantity: 1 available
Paperback. Condition: Fair. No Jacket. Readable copy. Pages may have considerable notes/highlighting. ~ ThriftBooks: Read More, Spend Less.

- Softcover
Seller: SHIMEDIA, Brooklyn, NY, U.S.A.SHIMEDIA
Contact seller4-star sellerCondition: New
£ 117.83
Free ShippingShips within U.S.A.Quantity: 1 available
Condition: New. Satisfaction Guaranteed or your money back.

- Softcover
Seller: BOOKWEST, Phoenix, AZ, U.S.A.BOOKWEST
Contact seller3-star sellerCondition: New
£ 117.83
£ 3.81 shippingShips within U.S.A.Quantity: 1 available
Soft cover. Condition: New. 2nd Edition. US SELLER SHIPS FAST FROM USA. SHRINK-WRAPPED NEW: Construction Scheduling with Primavera Enterprise 2002 Ed 2 by David A. Marchman (Author) OUR REFERENCE: 131E1-127A13-B4-S22-0766828611-2-lb.

- Softcover
Seller: The Book Spot, North Branch, MN, U.S.A.The Book Spot
Contact seller4-star sellerCondition: Used
£ 235.67
Free ShippingShips within U.S.A.Quantity: 1 available
Paperback.