9781025091921 - the Impact of the Packard Commission's Recommendations on Reducing Cost Overruns in Major Defense Acquisitions Programs by Searle, David A (6 results)

- Hardcover
Seller: PBShop.store UK, Fairford, GLOS, United KingdomPBShop.store UK
Contact seller5-star sellerCondition: New
£ 26.27
£ 4.16 shippingShips from United Kingdom to U.S.A.Quantity: Over 20 available
HRD. Condition: New. New Book. Shipped from UK. Established seller since 2000.

- Hardcover
Seller: AHA-BUCH GmbH, Einbeck, GermanyAHA-BUCH GmbH
Contact seller5-star sellerCondition: New
£ 37.30
£ 52.57 shippingShips from Germany to U.S.A.Quantity: 2 available
Buch. Condition: Neu. Neuware - The phenomenon of cost overruns in Department of Defense acquisitionprograms has been a problem for decades. In fact, regulations to controldefense procurements extend as far back as the 1940's. However, thesepolicies have accomplished little in controlling or reducing the problem. A 1993Rand Corp…oration study discussed the extent of cost growth in the DoD andindicated that cost growth has fluctuated around 20 percent since the mid 1960'sand that little improvement has occurred over time (Drezner and others, 1993:2).Other research indicates that the average cost overrun on DoD acquisitioncontracts is approximately 40 percent (Gansler, 1989:4). However onemeasures the unplanned cost increases (growth or overruns to be explainedlater in this thesis) is academic; the magnitude of the problem persists and isreadily seen as 20 to 40 percent can represent a notable loss.This work has been selected by scholars as being culturally important, and is part of the knowledge base of civilization as we know it. This work was reproduced from the original artifact, and remains as true to the original work as possible. Therefore, you will see the original copyright references, library stamps (as most of these works have been housed in our most important libraries around the world), and other notations in the work.This work is in the public domain in the United States of America, and possibly other nations. Within the United States, you may freely copy and distribute this work, as no entity (individual or corporate) has a copyright on the body of the work.As a reproduction of a historical artifact, this work may contain missing or blurred pages, poor pictures, errant marks, etc. Scholars believe, and we concur, that this work is important enough to be preserved, reproduced, and made generally available to the public. We appreciate your support of the preservation process, and thank you for being an important part of keeping this knowledge alive and relevant.

- Hardcover
- Print on Demand
Seller: Majestic Books, Hounslow, United KingdomMajestic Books
Contact seller4-star sellerCondition: New
£ 32.77
£ 6.50 shippingShips from United Kingdom to U.S.A.Quantity: 4 available
Condition: New. Print on Demand.

- Hardcover
- Print on Demand
Seller: Books Puddle, New York, NY, U.S.A.Books Puddle
Contact seller4-star sellerCondition: New
£ 37.42
£ 2.98 shippingShips within U.S.A.Quantity: 4 available
Condition: New. Print on Demand.

- Hardcover
- Print on Demand
Seller: Biblios, frankfurt am main, HESSE, GermanyBiblios
Contact seller4-star sellerCondition: New
£ 33.93
£ 8.48 shippingShips from Germany to U.S.A.Quantity: 4 available
Condition: New. PRINT ON DEMAND.

- Hardcover
- Print on Demand
Seller: CitiRetail, Stevenage, United KingdomCitiRetail
Contact seller5-star sellerCondition: New
£ 29.49
£ 37.00 shippingShips from United Kingdom to U.S.A.Quantity: 1 available
Hardcover. Condition: new. Hardcover. The phenomenon of cost overruns in Department of Defense acquisitionprograms has been a problem for decades. In fact, regulations to controldefense procurements extend as far back as the 1940's. However, thesepolicies have accomplished little in controlling or reducing the problem. A 1993Ran…d Corporation study discussed the extent of cost growth in the DoD andindicated that cost growth has fluctuated around 20 percent since the mid 1960'sand that little improvement has occurred over time (Drezner and others, 1993:2).Other research indicates that the average cost overrun on DoD acquisitioncontracts is approximately 40 percent (Gansler, 1989:4). However onemeasures the unplanned cost increases (growth or overruns to be explainedlater in this thesis) is academic; the magnitude of the problem persists and isreadily seen as 20 to 40 percent can represent a notable loss.This work has been selected by scholars as being culturally important, and is part of the knowledge base of civilization as we know it. This work was reproduced from the original artifact, and remains as true to the original work as possible. Therefore, you will see the original copyright references, library stamps (as most of these works have been housed in our most important libraries around the world), and other notations in the work.This work is in the public domain in the United States of America, and possibly other nations. Within the United States, you may freely copy and distribute this work, as no entity (individual or corporate) has a copyright on the body of the work.As a reproduction of a historical artifact, this work may contain missing or blurred pages, poor pictures, errant marks, etc. Scholars believe, and we concur, that this work is important enough to be preserved, reproduced, and made generally available to the public. We appreciate your support of the preservation process, and thank you for being an important part of keeping this knowledge alive and relevant. This item is printed on demand. Shipping may be from our UK warehouse or from our Australian or US warehouses, depending on stock availability.