AI and Wind Power 2: Advancing Sustainability, Gri d Integration, and Future Frameworks
Language: English
Published by Wiley-ISTE, 2026
- Hardcover
- New

Condition: New
£ 130.78
Quantity: Over 20 available
Add to basketSeller Inventory # 3401332770
- Title
- AI and Wind Power 2: Advancing Sustainability, Gri d Integration, and Future Frameworks
- Author
- A Kumar
- Publisher
- Wiley-ISTE
- Publication year
- 2026
- Condition
- New
- Binding
- Hardcover
- Language
- English
- ISBN 10
- 1836691424
- ISBN 13
- 9781836691426
As wind power scales from a complementary energy source to a cornerstone of global electricity systems, the challenge is no longer simply generating more clean energy - it is integrating, sustaining and governing the energy within an increasingly complex and interconnected grid.
AI and Wind Power 2 examines how artificial intelligence (AI) is enabling this critical transition. Moving beyond turbine-level optimization, this book explores AI-driven architectures for hybrid renewable energy systems that unite wind with solar, hydro and storage. It presents advanced frameworks for smart grid management, dynamic balancing of variable resources and real-time sustainability optimization. Dedicated chapters address the economic and market impacts of AI in wind power, its role in shaping policy and regulatory frameworks, emerging applications in offshore wind, generative AI for system design and consumption behavior analysis.
An essential resource for engineers, policymakers, researchers and energy professionals, this book illuminates how intelligent systems are forging a more resilient, sustainable and adaptive energy future.
"Synopsis" may belong to another edition of this title.
About the Author
Abhishek Kumar is a senior IEEE member, and an assistant director and professor in the Department of Computer Science and Engineering at Chandigarh University, India.
Ananth Kumar T. is a senior IEEE member, and an associate professor and Head of the Department of Computer Science and Engineering at the IFET College of Engineering (Autonomous Institution), Tamil Nadu, India.
Ashutosh Kumar Dubey is an associate professor in the Department of Computer Science at the School of Engineering and Technology, Chitkara University, India.
Arun Lal Srivastav is an associate professor at the School of Engineering and Technology, Chitkara University, Himachal Pradesh, India.
J. Reyes Juárez-Ramírez is a professor–researcher in the Facultad de Ciencias Quíquimicas e Ingeniería, Universidad Autónoma de Baja California, Mexico.
"About the title" may belong to another edition of this title.
Shipping rates from Germany to U.S.A.
| Item | 26 to 60 business days | 26 to 60 business days |
|---|---|---|
| First item | £ 41.31 | £ 41.31 |
Payment methods
- Bank Wire Transfer
- Check
- Paypal
Store description
Online Handel nur mit Neubüchern
Seller's business information
Moluna GmbH
Engberdingdamm 27
Greven, Germany 48268
Terms of sale
About Us
Legal website operator identification:
Moluna GmbH
Represented by the general manager Helge Blischke
Engberdingdamm 27
48268 Greven
Germany
Telephone: 02571/5698933
Telefax: 02571/5698930
E-Mail: abe@moluna.de
VAT No.: DE296281834
listed in the commercial register of the local court Steinfurt
Commercial register number - Part B of the commercial register - 10553
We are a member of the initiative „FairCommerce“ since 24.07.2015.
For more information, see: www.haendlerbund.de/faircommerce.
Right of withdrawal
If you are a consumer you can withdraw from the contract in accordance with the following. Consumer means any natural person who is acting for purposes which are outside his trade, business, craft or profession.
Information regarding the right of withdrawal
Statutory right to withdraw
You have the right to withdraw from this contract within 14 days without giving any reason.
The withdrawal period will expire after 14 days from the day on which you acquire, or a third party other than the carrier and indicated by you acquires, physical possession of the last good or the last lot or piece.
To exercise the right of withdrawal, electronically fill in and submit a clear statement on our website, under "My Purchases" in "My Account". We will communicate to you an acknowledgement of receipt of such a withdrawal on a durable medium (e.g. by e-mail) without delay.
To meet the withdrawal deadline, it is sufficient for you to send your communication concerning your exercise of the right of withdrawal before the withdrawal period has expired.
Effects of withdrawal
If you withdraw from this contract, we will reimburse to you all payments received from you, including the costs of delivery (except for the supplementary costs arising if you chose a type of delivery other than the least expensive type of standard delivery offered by us).
We may make a deduction from the reimbursement for loss in value of any goods supplied, if the loss is the result of unnecessary handling by you.
We will make the reimbursement without undue delay, and not later than 14 days after the day on which we are informed about your decision to withdraw from this contract.
We will make the reimbursement using the same means of payment as you used for the initial transaction, unless you have expressly agreed otherwise; in any event, you will not incur any fees as a result of such reimbursement.
We may withhold reimbursement until we have received the goods back, or you have supplied evidence of having sent back the goods, whichever is the earliest.
You shall send back the goods or hand them over to moluna, Greven, Germany, without undue delay and in any event not later than 14 days from the day on which you communicate your withdrawal from this contract to us. The deadline is met if you send back the goods before the period of 14 days has expired. You will have to bear the direct cost of returning the goods. You are only liable for any diminished value of the goods resulting from the handling other than what is necessary to establish the nature, characteristics and functioning of the goods.
Exceptions to the right of withdrawal
The right of withdrawal does not apply to:
- The delivery of newspapers, journals or magazines with the exception of subscription contracts; and
- The supply of digital content which is not supplied on a tangible medium (e.g. on a CD or DVD) if you accepted when you placed your order that we could start to deliver it, and that you could not withdraw once delivery had started.