Vertical and Decline Shaft Sinking: Good Practices in Technique and Technology, International Mining Forum 2015
Language: English
Published by CRC Pr I Llc, 2015
- Hardcover
- New

Seller: Revaluation Books, Exeter, United KingdomRevaluation Books
AbeBooks seller since January 6, 2003
Condition: New
£ 222.49
Quantity: 2 available
Add to basketItem description from seller
197 pages. 10.00x7.00x0.75 inches. In Stock.
Seller Inventory # x-1138028207
- Title
- Vertical and Decline Shaft Sinking: Good Practices in Technique and Technology, International Mining Forum 2015
- Author
- Kicki, Jerzy (Editor)/ Sobczyk, Eugeniusz J. (Editor)/ Kaminski, Pawel (Editor)
- Publisher
- CRC Pr I Llc
- Publication year
- 2015
- Condition
- Brand New
- Binding
- Hardcover
- Language
- English
- ISBN 10
- 1138028207
- ISBN 13
- 9781138028203
- Item weight
- 0.54 kilograms
Shaft sinking for underground transportation purposes is a very complex technological process in mining and geotechnology which requires specific and specially designed technological equipment. This technological process is dealt with for a long time, since mining is one of the oldest industries in the world.
This book presents the technical papers that were presented at the International Mining Forum 2015. The International Mining Forum (IMF) is a meeting place of scientists and professionals who are engaged in confronting ideas and experience, evaluating solutions implemented, and discussing new ideas that might change the image of the mining industry. The IMF is an international activity of the School of Underground Mining, the major branch event organized both by the Mineral & Energy Economy Research Institute of the Polish Academy of Sciences and AGH–University of Science & Technology of Cracow, which gathering approximately 500 people from Poland and other countries every year.
This year's edition of the International Mining Forum was related to specialistic underground construction. Experts presented papers related to the implementation and operation of the vertical and decline shafts. Experience from China, Germany, Serbia, Slovenia and Poland were shared at the meeting.
The topics of papers submitted include:
- Application of TBM for driving declines shafts
- State-of-the-Art in Blind Shaft Drilling
- Ground freezing
- Technology of shaft sinking in low-strength rocks and high natural hazards probabilities
- Static calculations of the shaft linings
- Determinants of forecasting deformation in a shaft
"Synopsis" may belong to another edition of this title.
About the Author
Jerzy Kicki
ACADEMIC EXPERIENCE: Lectures and classes for the Mining and Geoengineering Faculties on the following courses; 150 graduated MSc. Students.
PROFESSIONAL EXPERIENCE: An Economic and Mining Engineer with more than 30 years of experience including: project evaluation, due diligence activity, pre and feasibility studies. Dr. Kicki made more than 200 industrial reports and large projects which were prepared and managed for Polish mining industry. From this list more than 100 are related to coal mining. He has managed diverse teams working on mineral property development and feasibility study, mine and plant operations.
ORGANIZATION EXPERIENCE: Deputy Dean of Mining Faculty at the University of Mining and Metallurgy (AGH), Chair of the Organizing Committee of School of Underground Mining (organized since 1992), Chairman of the World Mining Congress 2008,since 1996 head of Mineral Engineering Department in Polish Academy of Sciences- Institute of Mineral Economy and Energy.
Eugeniusz Jacek Sobczyk
ACADEMIC EXPERIENCE: University of Lodz (1978-1982); master of science degree of geomorphology. Academy of Mining and Metallurgy in Cracow (1982-1986); engineer of geology and mining. Jagiellonian University in Cracow (1989-1990). Doctor’s degree of mining geology (2000). Qualifying as assistant professor of mining geology (2010).
PROFESSIONAL EXPERIENCE: Scientist in Mineral and Energy Economy Research Centre of Polish Academy of Sciences in Cracow since 1986. Working on management of coal reserves and on restructuring of the coal industry in Poland; evaluation of deposits and mining project. Member of the Polish Association of Mineral Asset Valuators. The valuator of mineral deposits (Co-author of the valuation of hard-coal deposits). He holds the title of European Geologist.
Research and teaching assistant at AGH University of Science and Technology in Cracow. Participant of many studies and projects, primarily related to underground mining, ventilation and underground construction.
"About the title" may belong to another edition of this title.
Revaluation Books
Exeter, United Kingdom
AbeBooks seller since January 6, 2003
Shipping rates from United Kingdom to U.S.A.
| Item | 7 to 14 business days | 2 to 3 business days |
|---|---|---|
| First item | £ 12.50 | £ 30.00 |
Payment methods
Seller's business information
Edward Bowditch Ltd
Exstowe, Exton
Exeter, United Kingdom EX3 0PP
Terms of sale
Legal entity name: Edward Bowditch Ltd
Legal entity form: Limited company
Business correspondence address: Exstowe, Exton, Exeter, EX3 0PP
Company registration number: 04916632
VAT registration: GB834241546
Authorised representative: Mr. E. Bowditch
Right of withdrawal
If you are a consumer you can withdraw from the contract in accordance with the following. Consumer means any natural person who is acting for purposes which are outside his trade, business, craft or profession.
Information regarding the right of withdrawal
Statutory right to withdraw
You have the right to withdraw from this contract within 14 days without giving any reason.
The withdrawal period will expire after 14 days from the day on which you acquire, or a third party other than the carrier and indicated by you acquires, physical possession of the last good or the last lot or piece.
To exercise the right of withdrawal, electronically fill in and submit a clear statement on our website, under "My Purchases" in "My Account". We will communicate to you an acknowledgement of receipt of such a withdrawal on a durable medium (e.g. by e-mail) without delay.
To meet the withdrawal deadline, it is sufficient for you to send your communication concerning your exercise of the right of withdrawal before the withdrawal period has expired.
Effects of withdrawal
If you withdraw from this contract, we will reimburse to you all payments received from you, including the costs of delivery (except for the supplementary costs arising if you chose a type of delivery other than the least expensive type of standard delivery offered by us).
We may make a deduction from the reimbursement for loss in value of any goods supplied, if the loss is the result of unnecessary handling by you.
We will make the reimbursement without undue delay, and not later than 14 days after the day on which we are informed about your decision to withdraw from this contract.
We will make the reimbursement using the same means of payment as you used for the initial transaction, unless you have expressly agreed otherwise; in any event, you will not incur any fees as a result of such reimbursement.
We may withhold reimbursement until we have received the goods back, or you have supplied evidence of having sent back the goods, whichever is the earliest.
You shall send back the goods or hand them over to Revaluation Books, Hounslow, United Kingdom, without undue delay and in any event not later than 14 days from the day on which you communicate your withdrawal from this contract to us. The deadline is met if you send back the goods before the period of 14 days has expired. You will have to bear the direct cost of returning the goods. You are only liable for any diminished value of the goods resulting from the handling other than what is necessary to establish the nature, characteristics and functioning of the goods.
Exceptions to the right of withdrawal
The right of withdrawal does not apply to:
- The delivery of newspapers, journals or magazines with the exception of subscription contracts; and
- The supply of digital content which is not supplied on a tangible medium (e.g. on a CD or DVD) if you accepted when you placed your order that we could start to deliver it, and that you could not withdraw once delivery had started.
Shipping terms
Orders usually dispatched within two working days.