Understanding Electric Power Systems
Language: English
Published by John Wiley & Sons, 2010
- Softcover
- New

Seller: moluna, Greven, Germanymoluna
AbeBooks seller since July 9, 2020
Condition: New
£ 99.28
Quantity: Over 20 available
Add to basketItem description from seller
Seller Inventory # 556555732
- Title
- Understanding Electric Power Systems
- Author
- J Casazza
- Publisher
- John Wiley & Sons
- Publication year
- 2010
- Condition
- New
- Binding
- Kartoniert / Broschiert
- Language
- English
- ISBN 10
- 0470484187
- ISBN 13
- 9780470484180
- Edition
- 2nd Edition
A COMPREHENSIVE LOOK IN LAYMAN'S TERMS AT THE MANY ASPECTS OF THE PROVISION OF ELECTRIC POWER, BY TWO VETERAN EXECUTIVES AND RESPECTED EXPERTS
Technological advances and changes in government policy and regulation have altered the electric power industry in recent years and will continue to impact it for quite some time. Fully updated with the latest changes to regulation, structure, and technology, this new edition of Understanding Electric Power Systems offers a real-world view of the industry, explaining how it operates, how it is structured, and how electricity is regulated and priced. It includes extensive references for the reader and will be especially useful to lawyers, government officials, regulators, engineers, and students, as well as the general public.
The book explains the physical functioning of electric power systems, the electric power business in today's environment, and the related institutions, including recent changes in the roles of the Federal Energy Regulatory Commission and the North American Reliability Company. Significant changes that are affecting the industry are covered in this new edition, including:
- The expanded role of the federal government in the planning and operation of the nation's electric utilities
- New energy laws and a large number of FERC regulations implementing these laws
- Concerns over global warming and potential impacts on the electric industry
- Pressures for expansion of the electric grid and the implementation of "smart-grid" technologies
- The growing importance of various energy-storage technologies and renewable energy sources
- New nuclear generation technologies
- The 2009 economic stimulus package
"Synopsis" may belong to another edition of this title.
About the Author
JACK CASAZZA is an electrical engineer with wide experience in the electric power profession as an executive, researcher, economist, and consultant. He has served as vice president in a major utility responsible for elec- tric and gas planning and research, as a member of the Board of Directors of the Georgia System Operating Co., and as chairman of the U.S. Technical Committee of CIGRE. Casazza is the author of six books on electric power policy and technology and founded the American Education Institute. An IEEE Life Fellow, he received the Halperin Award for his contributions to the development of the national transmission system.
FRANK DELEA is retired from Consolidated Edison Company, where he had a wide range of assignments giving him insight into planning, operational, financial, organizational, and legal issues. He was the company's chief electric planning engineer, its chief forecast engineer, its first project manager for rate cases, and a corporate planning director. He is an IEEE Senior Member. Since his retirement, Delea has conducted many short courses in technical, business, and regulatory issues relating to electric power systems for non-engineers.
"About the title" may belong to another edition of this title.
Shipping rates from Germany to U.S.A.
| Item | 26 to 60 business days | 26 to 60 business days |
|---|---|---|
| First item | £ 42.09 | £ 42.09 |
Payment methods
- Bank Wire Transfer
- Check
- Paypal
Store description
Seller's business information
Moluna GmbH
Engberdingdamm 27
Greven, Germany 48268
Terms of sale
About Us
Legal website operator identification:
Moluna GmbH
Represented by the general manager Helge Blischke
Engberdingdamm 27
48268 Greven
Germany
Telephone: 02571/5698933
Telefax: 02571/5698930
E-Mail: abe@moluna.de
VAT No.: DE296281834
listed in the commercial register of the local court Steinfurt
Commercial register number - Part B of the commercial register - 10553
We are a member of the initiative „FairCommerce“ since 24.07.2015.
For more information, see: www.haendlerbund.de/faircommerce.
Right of withdrawal
If you are a consumer you can withdraw from the contract in accordance with the following. Consumer means any natural person who is acting for purposes which are outside his trade, business, craft or profession.
Information regarding the right of withdrawal
Statutory right to withdraw
You have the right to withdraw from this contract within 14 days without giving any reason.
The withdrawal period will expire after 14 days from the day on which you acquire, or a third party other than the carrier and indicated by you acquires, physical possession of the last good or the last lot or piece.
To exercise the right of withdrawal, electronically fill in and submit a clear statement on our website, under "My Purchases" in "My Account". We will communicate to you an acknowledgement of receipt of such a withdrawal on a durable medium (e.g. by e-mail) without delay.
To meet the withdrawal deadline, it is sufficient for you to send your communication concerning your exercise of the right of withdrawal before the withdrawal period has expired.
Effects of withdrawal
If you withdraw from this contract, we will reimburse to you all payments received from you, including the costs of delivery (except for the supplementary costs arising if you chose a type of delivery other than the least expensive type of standard delivery offered by us).
We may make a deduction from the reimbursement for loss in value of any goods supplied, if the loss is the result of unnecessary handling by you.
We will make the reimbursement without undue delay, and not later than 14 days after the day on which we are informed about your decision to withdraw from this contract.
We will make the reimbursement using the same means of payment as you used for the initial transaction, unless you have expressly agreed otherwise; in any event, you will not incur any fees as a result of such reimbursement.
We may withhold reimbursement until we have received the goods back, or you have supplied evidence of having sent back the goods, whichever is the earliest.
You shall send back the goods or hand them over to moluna, Greven, Germany, without undue delay and in any event not later than 14 days from the day on which you communicate your withdrawal from this contract to us. The deadline is met if you send back the goods before the period of 14 days has expired. You will have to bear the direct cost of returning the goods. You are only liable for any diminished value of the goods resulting from the handling other than what is necessary to establish the nature, characteristics and functioning of the goods.
Exceptions to the right of withdrawal
The right of withdrawal does not apply to:
- The delivery of newspapers, journals or magazines with the exception of subscription contracts; and
- The supply of digital content which is not supplied on a tangible medium (e.g. on a CD or DVD) if you accepted when you placed your order that we could start to deliver it, and that you could not withdraw once delivery had started.