Understanding Concurrent Systems
Language: English
Published by Springer 2010-10-25, 2010
- Hardcover
- New

Seller: Chiron Media, Wallingford, United KingdomChiron Media
AbeBooks seller since August 2, 2010
Condition: New
£ 40.73
Quantity: 1 available
Add to basketSeller Inventory # 6666-GRD-9781848822573
- Title
- Understanding Concurrent Systems
- Author
- Roscoe, A. W.
- Publisher
- Springer 2010-10-25
- Publication year
- 2010
- Condition
- New
- Binding
- Hardback
- Language
- English
- ISBN 10
- 184882257X
- ISBN 13
- 9781848822573
- Series
- Book 18 of 83: Texts in Computer Science
"Synopsis" may belong to another edition of this title.
From the Back Cover
Communicating Sequential Processes (CSP) has been used extensively for teaching and applying concurrency theory, ever since the publication of the text Communicating Sequential Processes by C.A.R. Hoare in 1985. Both a programming language and a specification language, CSP helps users to understand concurrent systems, and to decide whether a program meets its specification. As a member of the family of process algebras, the concepts of communication and interaction are presented in an algebraic style.
An invaluable textbook/reference on the state of the art in CSP, Understanding Concurrent Systems also serves as a comprehensive introduction to the field, in addition to providing material for a number of more advanced courses. A first point of reference for anyone wanting to use CSP or learn about its theory, the book also introduces other views of concurrency, using CSP to model and explain these. The text is fully integrated with CSP-based tools such as Failures-Divergences Refinement (FDR), and describes how to create new tools based on FDR. Most of the book relies on no previous knowledge of the theoretical background other than a basic knowledge of sets and sequences. Sophisticated mathematical arguments are avoided whenever possible.
Topics and features:
- Presents a comprehensive, accessible introduction to CSP
- Discusses the latest advances in CSP, giving novel presentations of its operational and algebraic semantics as well as the first comprehensive survey of its hierarchy of behavioural denotational models
- Explores the practical application of CSP, including timed modelling, discrete modelling, parameterised verifications and the state explosion problem, as well as advanced topics in the use of FDR
- Examines the ability of CSP to describe and enable reasoning about parallel systems modelled in other paradigms including two chapters on shared variable programming
- Covers a broad variety of concurrent systems, including combinatorial, timed, priority-based, mobile, shared variable, statecharts, buffered and asynchronous systems
- Contains ample exercises and case studies to support the text and aid in the explanation
- Supplies further tools and information at the associated website: http://www.comlab.ox.ac.uk/ucs/
From undergraduate students of computer science in need of an introduction to the area, to researchers and practitioners desiring a more in-depth understanding of theory and practice of concurrent systems, this broad-ranging text/reference is essential reading for anyone interested in Hoare's CSP.
Bill Roscoe has been Head of Department at Oxford University Computing Laboratory since 2003 and a Professor of Computer Science there since 1997. He is a Fellow of University College, Oxford and co-Director of the James Martin Institute for the Future of Computing. He is also co-editor of the Springer book Reflections on the Work of C.A.R. Hoare.
"About the title" may belong to another edition of this title.
Chiron Media
Wallingford, United Kingdom
AbeBooks seller since August 2, 2010
Shipping rates from United Kingdom to U.S.A.
| Item | 14 to 21 business days | 14 to 21 business days |
|---|---|---|
| First item | £ 15.49 | £ 15.49 |
Payment methods
Seller's business information
WRAP Ltd
Unit 4, 119 Loverock Rd
Reading, United Kingdom RG30 1DZ
Terms of sale
TBA
Right of withdrawal
If you are a consumer you can withdraw from the contract in accordance with the following. Consumer means any natural person who is acting for purposes which are outside his trade, business, craft or profession.
Information regarding the right of withdrawal
Statutory right to withdraw
You have the right to withdraw from this contract within 14 days without giving any reason.
The withdrawal period will expire after 14 days from the day on which you acquire, or a third party other than the carrier and indicated by you acquires, physical possession of the last good or the last lot or piece.
To exercise the right of withdrawal, electronically fill in and submit a clear statement on our website, under "My Purchases" in "My Account". We will communicate to you an acknowledgement of receipt of such a withdrawal on a durable medium (e.g. by e-mail) without delay.
To meet the withdrawal deadline, it is sufficient for you to send your communication concerning your exercise of the right of withdrawal before the withdrawal period has expired.
Effects of withdrawal
If you withdraw from this contract, we will reimburse to you all payments received from you, including the costs of delivery (except for the supplementary costs arising if you chose a type of delivery other than the least expensive type of standard delivery offered by us).
We may make a deduction from the reimbursement for loss in value of any goods supplied, if the loss is the result of unnecessary handling by you.
We will make the reimbursement without undue delay, and not later than 14 days after the day on which we are informed about your decision to withdraw from this contract.
We will make the reimbursement using the same means of payment as you used for the initial transaction, unless you have expressly agreed otherwise; in any event, you will not incur any fees as a result of such reimbursement.
We may withhold reimbursement until we have received the goods back, or you have supplied evidence of having sent back the goods, whichever is the earliest.
You shall send back the goods or hand them over to Chiron Media, Wallingford, United Kingdom, without undue delay and in any event not later than 14 days from the day on which you communicate your withdrawal from this contract to us. The deadline is met if you send back the goods before the period of 14 days has expired. You will have to bear the direct cost of returning the goods. You are only liable for any diminished value of the goods resulting from the handling other than what is necessary to establish the nature, characteristics and functioning of the goods.
Exceptions to the right of withdrawal
The right of withdrawal does not apply to:
- The delivery of newspapers, journals or magazines with the exception of subscription contracts; and
- The supply of digital content which is not supplied on a tangible medium (e.g. on a CD or DVD) if you accepted when you placed your order that we could start to deliver it, and that you could not withdraw once delivery had started.
Shipping terms
Shipping costs are based on books weighing 2.2 LB, or 1 KG. If your book order is heavy or oversized, we may contact you to let you know extra shipping is required.