Tubular Structures XI
Book 2 of 3: Tubular StructuresSold by Basi6 International, Irving, TX, U.S.A.
AbeBooks Seller since 24 June 2016
New - Hardcover
Condition: New
Ships within U.S.A.
Quantity: Over 20 available
Add to basketSold by Basi6 International, Irving, TX, U.S.A.
AbeBooks Seller since 24 June 2016
Condition: New
Quantity: Over 20 available
Add to basketNew. Delivery takes 20-25 days. Print on Demand.
Seller Inventory # POD-534126
This topical book contains the latest scientific and engineering developments in the field of tubular steel structures, as presented at the "11th International Symposium and IIW International Conference on Tubular Structures". The International Symposium on Tubular Structures (ISTS) has a long-standing reputation for being the principal showcase for manufactured tubing and the prime international forum for discussion of research, developments and applications in this field.
Various key and emerging subjects in the field of hollow structural sections are covered, such as: novel applications and case studies, static and fatigue behaviour of connections/joints, concrete-filled and composite tubular members, earthquake resistance, specification and code developments, material properties and structural reliability, impact resistance and brittle fracture, fire resistance, casting and fabrication innovations. Research and development issues presented in this book are applicable to buildings, bridges, offshore structures, entertainment rides, cranes, towers and various mechanical and agricultural equipment. This book is thus a pertinent reference source for architects, civil and mechanical engineers, designers, steel fabricators and contractors, manufacturers of hollow sections or related construction products, trade associations involved with tubing, owners or developers of tubular structures, steel specification committees, academics and research students.
The conference presentations herein include two keynote lectures (the International Institute of Welding Houdremont Lecture and the ISTS Kurobane Lecture), plus finalists in the CIDECT Student Papers Competition. The 11th International Symposium and IIW International Conference on Tubular Structures – ISTS11 – took place in Québec City, Canada from August 31 to September 2, 2006.
Dr. Jeff Packer is Professor of Civil Engineering at the University of Toronto, Canada. Since his appointment at the University of Toronto in 1980 he has undertaken research, development and consulting work on tubular steel structures. He has published extensively on this topic, including several co-authored CIDECT Design Guide books.
Dr. Silke Willibald is currently working as a Postdoctoral Fellow at the University of Toronto. She received both her diploma and doctoral degree at the University of Karlsruhe, Germany. During her studies and Postdoctoral Fellowship she has been working extensively in research on tubular structures."About this title" may belong to another edition of this title.
Professional Book Seller shipping from Multiple Locations Worldwide for fastest delivery possible!
If you are a consumer you can withdraw from the contract in accordance with the following. Consumer means any natural person who is acting for purposes which are outside his trade, business, craft or profession.
Information regarding the right of withdrawal
Statutory right to withdraw
You have the right to withdraw from this contract within 14 days without giving any reason.
The withdrawal period will expire after 14 days from the day on which you acquire, or a third party other than the carrier and indicated by you acquires, physical possession of the last good or the last lot or piece.
To exercise the right of withdrawal, electronically fill in and submit a clear statement on our website, under "My Purchases" in "My Account". We will communicate to you an acknowledgement of receipt of such a withdrawal on a durable medium (e.g. by e-mail) without delay.
To meet the withdrawal deadline, it is sufficient for you to send your communication concerning your exercise of the right of withdrawal before the withdrawal period has expired.
Effects of withdrawal
If you withdraw from this contract, we will reimburse to you all payments received from you, including the costs of delivery (except for the supplementary costs arising if you chose a type of delivery other than the least expensive type of standard delivery offered by us).
We may make a deduction from the reimbursement for loss in value of any goods supplied, if the loss is the result of unnecessary handling by you.
We will make the reimbursement without undue delay, and not later than 14 days after the day on which we are informed about your decision to withdraw from this contract.
We will make the reimbursement using the same means of payment as you used for the initial transaction, unless you have expressly agreed otherwise; in any event, you will not incur any fees as a result of such reimbursement.
We may withhold reimbursement until we have received the goods back, or you have supplied evidence of having sent back the goods, whichever is the earliest.
You shall send back the goods or hand them over to Basi6 International, Irving, Texas, U.S.A., without undue delay and in any event not later than 14 days from the day on which you communicate your withdrawal from this contract to us. The deadline is met if you send back the goods before the period of 14 days has expired. You will have to bear the direct cost of returning the goods. You are only liable for any diminished value of the goods resulting from the handling other than what is necessary to establish the nature, characteristics and functioning of the goods.
Exceptions to the right of withdrawal
The right of withdrawal does not apply to:
All orders shipped via FedEx or DHL and delivered to your doorstep within 3-5 days. We do not ship to P.O.Boxes and a proper street address must be provided to avoid any delays.
| Order quantity | 5 to 14 business days | 3 to 6 business days |
|---|---|---|
| First item | £ 0.00 | £ 0.00 |
Delivery times are set by sellers and vary by carrier and location. Orders passing through Customs may face delays and buyers are responsible for any associated duties or fees. Sellers may contact you regarding additional charges to cover any increased costs to ship your items.