Trevor Kletz Compendium: His Process Safety Wisdom Updated for a New Generation
Language: English
Published by Elsevier Science Ltd, 2021
- Softcover
- New

Seller: Revaluation Books, Exeter, United KingdomRevaluation Books
AbeBooks seller since January 6, 2003
Condition: New
£ 89.35
Quantity: 2 available
Add to basketItem description from seller
212 pages. 9.25x7.50x0.71 inches. In Stock. This item is printed on demand.
Seller Inventory # __0128194472
- Title
- Trevor Kletz Compendium: His Process Safety Wisdom Updated for a New Generation
- Author
- Brazier, Andy/ Edwards, David/ MacLeod, Fiona/ Skinner, Craig/ Vince, Ivan
- Publisher
- Elsevier Science Ltd
- Publication year
- 2021
- Condition
- Brand New
- Binding
- Paperback
- Language
- English
- ISBN 10
- 0128194472
- ISBN 13
- 9780128194478
- Item weight
- 4.51 kilograms
Trevor Kletz has had a huge impact on the way people viewed accidents and safety, particularly in the process industries. His ideas were developed from nearly 40 years working in the chemical industry. When he retired from the field, he shared his experience and ideas widely in more than 15 books. Trevor Kletz Compendium: His Process Safety Wisdom Updated for a New Generation introduces Kletz’s stories and ideas and brings them up to date in this valuable resource that equips readers to manage process safety in every workplace. Topics covered in this book include inherent safety, safety studies, human factors and design. Learn the lessons from past accidents to make sure they don’t happen again.
- Focuses on understanding systems and learning from past accidents
- Describes approaches to safety that are practical and effective
- Provides an engineer’s perspective on safety
"Synopsis" may belong to another edition of this title.
About the Author
David Edwards is a chartered chemical engineer with 30 years of experience in Safety, Health and Environmental (SHE) matters. He worked on Inherently Safer Design (ISrD) with Trevor Kletz and others at Loughborough University, where he wrote one of the seminal papers in the field, ‘Assessing the inherent safety of chemical process routes: is there a relation between plant costs and inherent safety?’, D.W. Edwards and D. Lawrence, Process Safety and Environmental Protection (PSEP), 71, 252-258 (November, 1993), which has been cited more than 150 times. He won the IChemE Hutchison medal for ‘Inherently Safer Design – Present and Future’, J.P. Gupta, D.W. Edwards, PSEP, 80, B, 115-125, (2002). He is an authority on Inherently Safer Design, which he has championed during his oil and gas facility design work with Granherne / KBR
Fiona Macleod studied Chemical Engineering at Cambridge University (Selwyn College 1979-1983) before joining ICI as a graduate trainee. She has worked in the International Chemical industry for over 35 years in manufacturing, design and construction, engineering and maintenance, demolition, technology transfer, sales and senior management. Her experience with process safety was gained at the sharp end, practical experience of managing high hazard chemical sites.
Craig Skinner studied Chemical Engineering at Loughborough University and has nearly 30 years of international experience at BP working in refining, petrochemicals, upstream and low carbon energy. His roles have included process safety technical authority, operational safety leadership, technical and engineering management and human performance on projects and operating plants in the UK, Asia and the US, including corporate safety leadership.
Ivan Vince is a Chartered Chemist and Chartered Chemical Engineer with 40 years' experience in fields related to process safety, beginning with postdoctoral research at Imperial College involving flammability limits. He has taught postgraduate modules on risk assessment at several universities in the UK and abroad, given expert evidence at nine Public Inquiries and participated in the investigation of several major accidents, including Buncefield. Publications include Vince I (ed) (2008) Major accidents to the environment – a practical guide to the Seveso II Directive and the COMAH regulations (Oxford: Elsevier) ISBN: 978-0-7506-8389-0.; Vince I (2013) Explosion at a hazardous waste site caused by contaminated nitric acid, Chemical Engineering Transactions 31, 535.; Vince I (2011) Societal risk in land use planning – the scale of ‘scale aversion’, Hazards XXII, Symposium Series No.156, 408-410 (Rugby: IChemE).
"About the title" may belong to another edition of this title.
Revaluation Books
Exeter, United Kingdom
AbeBooks seller since January 6, 2003
Shipping rates from United Kingdom to U.S.A.
| Item | 2 to 3 business days | 7 to 14 business days |
|---|---|---|
| First item | £ 30.00 | £ 35.00 |
Payment methods
Seller's business information
Edward Bowditch Ltd
Exstowe, Exton
Exeter, United Kingdom EX3 0PP
Terms of sale
Legal entity name: Edward Bowditch Ltd
Legal entity form: Limited company
Business correspondence address: Exstowe, Exton, Exeter, EX3 0PP
Company registration number: 04916632
VAT registration: GB834241546
Authorised representative: Mr. E. Bowditch
Right of withdrawal
If you are a consumer you can withdraw from the contract in accordance with the following. Consumer means any natural person who is acting for purposes which are outside his trade, business, craft or profession.
Information regarding the right of withdrawal
Statutory right to withdraw
You have the right to withdraw from this contract within 14 days without giving any reason.
The withdrawal period will expire after 14 days from the day on which you acquire, or a third party other than the carrier and indicated by you acquires, physical possession of the last good or the last lot or piece.
To exercise the right of withdrawal, electronically fill in and submit a clear statement on our website, under "My Purchases" in "My Account". We will communicate to you an acknowledgement of receipt of such a withdrawal on a durable medium (e.g. by e-mail) without delay.
To meet the withdrawal deadline, it is sufficient for you to send your communication concerning your exercise of the right of withdrawal before the withdrawal period has expired.
Effects of withdrawal
If you withdraw from this contract, we will reimburse to you all payments received from you, including the costs of delivery (except for the supplementary costs arising if you chose a type of delivery other than the least expensive type of standard delivery offered by us).
We may make a deduction from the reimbursement for loss in value of any goods supplied, if the loss is the result of unnecessary handling by you.
We will make the reimbursement without undue delay, and not later than 14 days after the day on which we are informed about your decision to withdraw from this contract.
We will make the reimbursement using the same means of payment as you used for the initial transaction, unless you have expressly agreed otherwise; in any event, you will not incur any fees as a result of such reimbursement.
We may withhold reimbursement until we have received the goods back, or you have supplied evidence of having sent back the goods, whichever is the earliest.
You shall send back the goods or hand them over to Revaluation Books, Hounslow, United Kingdom, without undue delay and in any event not later than 14 days from the day on which you communicate your withdrawal from this contract to us. The deadline is met if you send back the goods before the period of 14 days has expired. You will have to bear the direct cost of returning the goods. You are only liable for any diminished value of the goods resulting from the handling other than what is necessary to establish the nature, characteristics and functioning of the goods.
Exceptions to the right of withdrawal
The right of withdrawal does not apply to:
- The delivery of newspapers, journals or magazines with the exception of subscription contracts; and
- The supply of digital content which is not supplied on a tangible medium (e.g. on a CD or DVD) if you accepted when you placed your order that we could start to deliver it, and that you could not withdraw once delivery had started.
Shipping terms
Orders usually dispatched within two working days.