Transformer and Reactor Procurement
Book 8 of 10: CIGRE Green BooksNew - Hardcover
Condition: New
Ships from Germany to U.S.A.
Quantity: Over 20 available
Add to basketCondition: New
Quantity: Over 20 available
Add to basketDieser Artikel ist ein Print on Demand Artikel und wird nach Ihrer Bestellung fuer Sie gedruckt. This Green Book provides those involved in transformer procurement with comprehensive guidance on industry best practice to avoid wrong decisions. Transformers are one of the expensive components in the power system, and also contribute a large proportio.
Seller Inventory # 477957088
This Green Book provides those involved in transformer procurement with comprehensive guidance on industry best practice to avoid wrong decisions. Transformers are one of the expensive components in the power system, and also contribute a large proportion of the losses. Transformers also have long lives - more than 40 years in many cases. Making the wrong decisions during the procurement process can have serious and long-lasting consequences.
He has been an active member of CIGRE for many years. He was a member of working groups A2.27 on condition monitoring facilities, A2/B4.28 on HVDC transformers, and A2.37 on transformer reliability. He was also regular member for Brazil on SC A2 between 2014 and 2020.
Tom Breckenridge was born in Greenock, Scotland, in 1955. He studied electrical and electronic engineering at the University of Glasgow between 1973 and 1977. He joined the South of Scotland Electricity Board in 1978, initially as an operational engineer within the distribution field. A move to transmission substation design followed in 1996, where he also assumed the role as principal transformer expert for Scottish Power responsible for specification purchasing and approval of all transformers. Leaving Scottish Power in 2006, he founded TB TCS Ltd through which he provides specialist services in the field of large power transformers on a global basis, primarily operating in the procurement area.
He is a registered European engineer, a fellow of the IET, a UK chartered engineer, and a distinguished member of CIGRE. He was convenor of CIGRE working group A2-36 on transformer procurement. Tom is chairman designate of British Standards PEL/14 committee for power transformers and a member of several IEC maintenance teams under IEC TC14 where he was also IEC convener for the latest version of IEC/IEEE standard 60076-16 for wind turbine transformers.Mike Lamb was born in the USA in 1966. He is currently manager of electric transmission operations engineering in the power delivery group at Dominion Energy in Richmond Virginia, USA. He joined Dominion Energy in 1988 and has held several engineering positions during his career with experience in electric substation and transmission line design and maintenance, distribution system planning and operations, and system operations contingency analysis and transmission open access. Prior to his current position, he was principal engineer in electric transmission operations engineering responsible for the technical oversight of the power transformer procurement process in support of all Dominion Energy’s business units. Mike now leads a team of specialized engineers responsible for major electric transmission equipment specifications; system analysis, technical investigations and root cause analyses, and providing analysis and guidance for emerging technological challenges.
He became a member of CIGRE in 2007. Mike was a member of CIGRE working group A2.36 on transformer procurement andsecretary of CIGRE working group A2.48 on shunt reactors, and he is secretary of CIGRE working group A2.58 on installation and pre-commissioning. He has been an active member of CIGRE USNC and was a recipient in 2018 of the Attwood Associate Award.
Tara-Lee MacArthur studied electrical engineering at Queensland University of Technology from 2008 to 2011, graduating with a BEng. She works for an Australian energy utility as a substation design standards engineer and is noted for her work on power transformer specification and design and transformer life management. She is a member of the CIGRE Australia A2 mirror panel (since 2015) and director of the CIGRE Australia Board (since 2020). She has been an active member within CIGRE internationally as secretary of CIGRE Working Group A2.49 between 2016 and 2019 and has been chair of A2 AG.2 on tutorials since 2020. She is a registered professional engineer in Queensland, Australia.
Simon Ryder was born in Englandin 1973. He studied engineering science at St John’s College, Oxford University, between 1992 and 1996. He worked for GEC Alsthom and later Alstom, between 1997 and 2003, in transformer design, development, and eventually research. He is known for his work on thermal characteristics of transformers and frequency response analysis (FRA). He joined Doble in 2003, initially working mainly on transformer life management. Since 2009, he has worked mainly on transformer procurement, especially supplier qualification and development.
He is a senior member of IEEE-PES, a fellow of IET, and a chartered engineer. He was a member of CIGRE working groups A2.36 on transformer procurement, D1/A2.47 on advances in DGA interpretation, and A2.58 on transformer installation, pre-commissioning, and trial operation, and was convenor of CIGRE working group A2.48 on shunt reactors. He was chairman of CIGRE Committee A2 on power transformers and reactors between 2016 and 2020. He is editor-in-chief ofthis Green Book.
"About this title" may belong to another edition of this title.
Instructions for revocation/
Standard Business Terms and customer information/ data protection declaration
Revocation right for consumers
(A ?consumer? is any natural person who concludes a legal transaction which, to an overwhelming extent, cannot be attributed to either his commercial or independent professional activities.)
Instructions for revocation
Revocation right
You have the right to revoke this contract within one month without specifying any reasons.
The revocation period is one month...
Instructions for revocation/
Standard Business Terms and customer information/ data protection declaration
Revocation right for consumers
(A ‘consumer’ is any natural person who concludes a legal transaction which, to an overwhelming extent, cannot be attributed to either his commercial or independent professional activities.)
Instructions for revocation
Revocation right
You have the right to revoke this contract within one month without specifying any reasons.
The revocation period is one month with effect from the day,
on which you or a third party nominated by you, which is not the carrier, had taken possession of the products, provided you had ordered one or more products within the scope of a standard order and this/these product/products is/are delivered uniformly;
on which you or a third party nominated by you, which is not the carrier, had taken possession of the last product, provided you had ordered several products within the scope of a standard order and these products are delivered separately;
on which you or a third party nominated by you, which is not the carrier, had taken possession of the last part delivery or the last unit, provided you had ordered a product, which is delivered in several part deliveries or units;
In order to exercise your revocation right, you must inform us (Moluna GmbH, Münsterstr. 105, 48268 Greven, Telephone number: 02571/5 69 89 33, Fax number: 02571/5 69 89 30, E-Mail address: abe@moluna.de) of your decision to revoke this contract by means of a clear declaration (e.g. a letter sent via post, fax or email). You can use the enclosed specimen revocation form for this, which however is not mandatory.
In order to safeguard the revocation period, it is sufficient that you send the notification about the exercise of the revocation right before the expiry of the revocation period.
Consequences of the revocation
If you revoke this contract, we shall repay all the payments, which we received from you, including the delivery costs (with the exception of additional costs, which arise from that fact that you selected a form of delivery other than the most reasonable standard delivery offered by us), immediately and at the latest within 14 days from the day on which we received the notification about the revocation of this contract from you. We use the same means of payment, which you had originally used during the original transaction, for this repayment unless expressly agreed otherwise with you; you will not be charged any fees owing to this repayment.
We can refuse the repayment until the products are returned to us or until you have furnished evidence that you have sent the products back to us, depending on whichever is earlier.
You must return or transfer the products to us immediately and, in any case, at the latest within 14 days with effect from the day on which you inform us of the revocation of this contract. The deadline is maintained if you send the products before the expiry of the 14 day deadline.
You bear the direct costs for returning the products.
You must pay for any depreciation of the products only if this depreciation can be attributed to any handling with you that was not necessary for checking the condition, features and functionality of the products.
Criteria for exclusion or expiry
The revocation right is not available for contracts
for delivery of products, which are not prefabricated and for whose manufacturing an individual selection or stipulation by the consumer is important or which are clearly tailored to the personal requirements of the consumer;
for delivery of products, which can spoil quickly or whose use-by date would be exceeded quickly;
for delivery of alcoholic drinks, whose price was agreed at the time of concluding the contract, which however can be delivered 30 days after the conclusion of the contract at the earliest and whose current value depends on the fluctuations in the market, on which the entrepreneur has no influence;
for delivery of newspapers, periodicals or magazines with the exception of subscription contracts.
The revocation right expires prematurely in case of contracts
for delivery of sealed products, which are not suitable for return for reasons of health protection or hygiene if their seal has been removed after the delivery;
for delivery of products if they have been mixed inseparably with other goods after the delivery, owing to their condition;
for delivery of sound or video recording or computer software in a sealed package if the seal has been removed after the delivery.
Specimen - revocation form
(If you wish to revoke the contract, please fill up this form and send it back to us.)
To Moluna GmbH, Engberdingdamm 27, 48268 Greven, Fax number: 02571/5 69 89 30, Email address: abe@moluna.de :
I/we () herewith revoke the contract concluded by me/ us () regarding the purchase of the following products ()/
the provision of the following service ()
Ordered on ()/ received on ()
Name of the consumer(s)
Address of the consumer(s)
Signature of the consumer(s) (only in case of a notification on paper)
Date
(*) Cross out the incorrect option.
II. Kundeninformationen
Moluna GmbH
Engberdingdamm 27
48268 Greven
Deutschland
Telefon: 02571/5698933
E-Mail: abe@moluna.de
Wir sind nicht bereit und nicht verpflichtet, an Streitbeilegungsverfahren vor Verbraucherschlichtungsstellen teilzunehmen.
Die technischen Schritte zum Vertragsschluss, der Vertragsschluss selbst und die Korrekturmöglichkeiten erfolgen nach Maßgabe der Regelungen "Zustandekommen des Vertrages" unserer Allgemeinen Geschäftsbedingungen (Teil I.).
3.1. Vertragssprache ist deutsch .
3.2. Der vollständige Vertragstext wird von uns nicht gespeichert. Vor Absenden der Bestellung können die Vertragsdaten über die Druckfunktion des Browsers ausgedruckt oder elektronisch gesichert werden. Nach Zugang der Bestellung bei uns werden die Bestelldaten, die gesetzlich vorgeschriebenen Informationen bei Fernabsatzverträgen und die Allgemeinen Geschäftsbedingungen nochmals per E-Mail an Sie übersandt.
Die wesentlichen Merkmale der Ware und/oder Dienstleistung finden sich im jeweiligen Angebot.
5.1. Die in den jeweiligen Angeboten angeführten Preise sowie die Versandkosten stellen Gesamtpreise dar. Sie beinhalten alle Preisbestandteile einschließlich aller anfallenden Steuern.
5.2. Die anfallenden Versandkosten sind nicht im Kaufpreis enthalten. Sie sind über eine entsprechend bezeichnete Schaltfläche auf unserer Internetpräsenz oder im jeweiligen Angebot aufrufbar, werden im Laufe des Bestellvorganges gesondert ausgewiesen und sind von Ihnen zusätzlich zu tragen, soweit nicht die versandkostenfreie Lieferung zugesagt ist.
5.3. Die Ihnen zur Verfügung stehenden Zahlungsarten sind unter einer entsprechend bezeichneten Schaltfläche auf unserer Internetpräsenz oder im jeweiligen Angebot ausgewiesen.
5.4. Soweit bei den einzelnen Zahlungsarten nicht anders angegeben, sind die Zahlungsansprüche aus dem geschlossenen Vertrag sofort zur Zahlung fällig.
6.1. Die Lieferbedingungen, der Liefertermin sowie gegebenenfalls bestehende Lieferbeschränkungen finden sich unter einer entsprechend bezeichneten Schaltfläche auf unserer Internetpräsenz oder im jeweiligen Angebot.
Soweit im jeweiligen Angebot oder unter der entsprechend bezeichneten Schaltfläche keine andere Frist angegeben ist, erfolgt die Lieferung der Ware innerhalb von 3-5 Tagen nach Vertragsschluss (bei vereinbarter Vorauszahlung jedoch erst nach dem Zeitpunkt Ihrer Zahlungsanweisung).
6.2. Soweit Sie Verbraucher sind ist gesetzlich geregelt, dass die Gefahr des zufälligen Untergangs und der zufälligen Verschlechterung der verkauften Sache während der Versendung erst mit der Übergabe der Ware an Sie übergeht, unabhängig davon, ob die Versendung versichert oder unversichert erfolgt. Dies gilt nicht, wenn Sie eigenständig ein nicht vom Unternehmer benanntes Transportunternehmen oder eine sonst zur Ausführung der Versendung bestimmte Person beauftragt haben.
Sind Sie Unternehmer, erfolgt die Lieferung und Versendung auf Ihre Gefahr.
Die Mängelhaftung richtet sich nach der Regelung "Gewährleistung" in unseren Allgemeinen Geschäftsbedingungen (Teil I).
letzte Aktualisierung: 23.10.2019
| Order quantity | 16 to 45 business days | 16 to 45 business days |
|---|---|---|
| First item | £ 42.51 | £ 42.51 |
Delivery times are set by sellers and vary by carrier and location. Orders passing through Customs may face delays and buyers are responsible for any associated duties or fees. Sellers may contact you regarding additional charges to cover any increased costs to ship your items.