Timing Optimization Through Clock Skew Scheduling
Language: English
Published by Springer US, 2010
- Softcover
- New

Seller: moluna, Greven, Germanymoluna
AbeBooks seller since July 9, 2020
Condition: New
£ 81.58
Quantity: Over 20 available
Add to basketItem description from seller
Dieser Artikel ist ein Print on Demand Artikel und wird nach Ihrer Bestellung fuer Sie gedruckt. Focuses on timing analysis and optimization techniques for circuits with level-sensitive memory elementsContains a linear programming formulation applicable to the timing analysis of large scale circuitsIncludes a delay insertion methodolog.
Seller Inventory # 4174727
- Title
- Timing Optimization Through Clock Skew Scheduling
- Author
- Ivan S. Kourtev|Baris Taskin|Eby G. Friedman
- Publisher
- Springer US
- Publication year
- 2010
- Condition
- New
- Binding
- Soft cover
- Language
- English
- ISBN 10
- 1441943773
- ISBN 13
- 9781441943774
The focus of this book is on timing analysis and optimization techniques for circuits with level-sensitive memory elements (registers). Level-sensitive registers are becoming significantly more popular in practice as integrated circuit densities are increasing and the ‘performance-per-power’ metric for integrated circuits becomes a key issue. Therefore, techniques for understanding level-sensitive based circuits and for optimizing the performance of such circuits are increasingly important. The book contains a linear programming formulation applicable to the timing analysis of large scale circuits. It includes a delay insertion methodology, and offers an overview of circuit partitioning, placement, and synchronization methodologies that enables the implementation of high speed, low power circuits synchronized with ultra-modern resonant clocking technology.
"Synopsis" may belong to another edition of this title.
From the Back Cover
Timing Optimization Through Clock Skew Scheduling focuses on optimizing the timing of large scale, high performance, digital synchronous systems. A particular emphasis is placed on algorithms for non-zero clock skew scheduling to improve the performance and reliability of VLSI circuits.
This research monograph answers the need for a broad introduction to state-of-the-art clock skew scheduling algorithms from a circuit, graph, and mathematical optimization background. A detailed description of clock skew scheduling application on edge-triggered and level-sensitive circuits, synchronized with single and multi-phase clocking schemes, and formulated as linear programming (LP) and quadratic programming (QP) formulations are provided along with an analysis of optimal computer solution techniques. Theoretical limits of improvement in clock frequency through clock skew scheduling are highlighted. Hints and a preliminary implementation of a parallel skew scheduling application are also included.
Timing Optimization Through Clock Skew Scheduling contains sufficient detail for the advanced CAD algorithm developer, researcher and graduate student. Furthermore, with the material provided on timing properties and optimization, those readers with less background can also benefit from this book.
"About the title" may belong to another edition of this title.
Shipping rates from Germany to U.S.A.
| Item | 16 to 45 business days | 16 to 45 business days |
|---|---|---|
| First item | £ 42.05 | £ 42.05 |
Payment methods
- Bank Wire Transfer
- Check
- Paypal
Store description
Online Handel nur mit Neubüchern
Seller's business information
Moluna GmbH
Engberdingdamm 27
Greven, Germany 48268
Terms of sale
About Us
Legal website operator identification:
Moluna GmbH
Represented by the general manager Helge Blischke
Engberdingdamm 27
48268 Greven
Germany
Telephone: 02571/5698933
Telefax: 02571/5698930
E-Mail: abe@moluna.de
VAT No.: DE296281834
listed in the commercial register of the local court Steinfurt
Commercial register number - Part B of the commercial register - 10553
We are a member of the initiative „FairCommerce“ since 24.07.2015.
For more information, see: www.haendlerbund.de/faircommerce.
Right of withdrawal
If you are a consumer you can withdraw from the contract in accordance with the following. Consumer means any natural person who is acting for purposes which are outside his trade, business, craft or profession.
Information regarding the right of withdrawal
Statutory right to withdraw
You have the right to withdraw from this contract within 14 days without giving any reason.
The withdrawal period will expire after 14 days from the day on which you acquire, or a third party other than the carrier and indicated by you acquires, physical possession of the last good or the last lot or piece.
To exercise the right of withdrawal, electronically fill in and submit a clear statement on our website, under "My Purchases" in "My Account". We will communicate to you an acknowledgement of receipt of such a withdrawal on a durable medium (e.g. by e-mail) without delay.
To meet the withdrawal deadline, it is sufficient for you to send your communication concerning your exercise of the right of withdrawal before the withdrawal period has expired.
Effects of withdrawal
If you withdraw from this contract, we will reimburse to you all payments received from you, including the costs of delivery (except for the supplementary costs arising if you chose a type of delivery other than the least expensive type of standard delivery offered by us).
We may make a deduction from the reimbursement for loss in value of any goods supplied, if the loss is the result of unnecessary handling by you.
We will make the reimbursement without undue delay, and not later than 14 days after the day on which we are informed about your decision to withdraw from this contract.
We will make the reimbursement using the same means of payment as you used for the initial transaction, unless you have expressly agreed otherwise; in any event, you will not incur any fees as a result of such reimbursement.
We may withhold reimbursement until we have received the goods back, or you have supplied evidence of having sent back the goods, whichever is the earliest.
You shall send back the goods or hand them over to moluna, Greven, Germany, without undue delay and in any event not later than 14 days from the day on which you communicate your withdrawal from this contract to us. The deadline is met if you send back the goods before the period of 14 days has expired. You will have to bear the direct cost of returning the goods. You are only liable for any diminished value of the goods resulting from the handling other than what is necessary to establish the nature, characteristics and functioning of the goods.
Exceptions to the right of withdrawal
The right of withdrawal does not apply to:
- The delivery of newspapers, journals or magazines with the exception of subscription contracts; and
- The supply of digital content which is not supplied on a tangible medium (e.g. on a CD or DVD) if you accepted when you placed your order that we could start to deliver it, and that you could not withdraw once delivery had started.