Technology Standard of Pipe Jacking
Lu Wang
Sold by AHA-BUCH GmbH, Einbeck, Germany
AbeBooks Seller since 14 August 2006
New - Soft cover
Condition: New
Ships from Germany to U.S.A.
Quantity: 1 available
Add to basketSold by AHA-BUCH GmbH, Einbeck, Germany
AbeBooks Seller since 14 August 2006
Condition: New
Quantity: 1 available
Add to basketDruck auf Anfrage Neuware - Printed after ordering - This book summarizes the technical method and construction process of pipe jacking. It has a total of 17 chapters and one appendix. It includes how to prepare the pipe jacking construction, how to choose the pipe and equipment for jacking, how to choose the engineering environment, how to do the geological survey before jacking, how to design the working pit, what's the procedure of pipe jacking, how to do the measurement and monitoring during jacking, how to do the treatment and acceptance after jacking, and so on. Appendix contains reference tables for pipe jacking archives, which might aid readers in understanding the book's content. This book's language is simple to read, and it has a wealth of graphics. Even those without a foundational understanding of pipe jacking could read and comprehend it with ease. This regulation could be the fundamental discipline for pipeline jacking projects. It is the important basis and criterion for the design, construction, management, inspection, and acceptance of pipeline jacking.
Seller Inventory # 9789819955992
This book summarizes the technical method and construction process of pipe jacking. It has a total of 17 chapters and one appendix. It includes how to prepare the pipe jacking construction, how to choose the pipe and equipment for jacking, how to choose the engineering environment, how to do the geological survey before jacking, how to design the working pit, what's the procedure of pipe jacking, how to do the measurement and monitoring during jacking, how to do the treatment and acceptance after jacking, and so on. Appendix contains reference tables for pipe jacking archives, which might aid readers in understanding the book's content. This book's language is simple to read, and it has a wealth of graphics. Even those without a foundational understanding of pipe jacking could read and comprehend it with ease. This regulation could be the fundamental discipline for pipeline jacking projects. It is the important basis and criterion for the design, construction, management, inspection, and acceptance of pipeline jacking.
Zhiguo Wu is the chief engineer of Beijing Zhongxuan Municipal Engineering Co., Ltd and the member of the Professional Committee of the China Society of Trenchless Technology. He is proficient in mechanical pipe-jacking construction technology, has unique insights into foundation pit support, grouting drag reduction, soil improvement, settlement control, and other aspects of pipe-jacking construction, and has successfully solved various difficulties encountered in the project many times.
Yong Chen is a professor-level senior engineer and currently serves as the deputy director of the Chief Engineer's Office of Fujian Dongchen Geotechnical Foundation Engineering.
In 1996, he began to study trenchless engineering and successfully developed, popularized, and promoted it in complex geological areas of Fujian. In 2007 and 2008, he was awarded the title of ‘Outstanding Entrepreneur in National Engineering Quality Management’ by the ‘Policy Research Center of theMinistry of Construction’ for two consecutive years.
Zhaoquan Wang is the general manager and a senior engineer of Shaoxing Panshi Foundation Co., Ltd. He is the member of the Professional Committee of the China Society of Trenchless Technology. In 2000, he began to engage in the theoretical and practical research of trenchless pipe-jacking construction technology. In 2001, he co-founded a Sino-Japanese joint venture trenchless construction enterprise. By the end of 2003, he successively introduced 12 sets of ISE mud-water balance pipe-jacking machines, trained a large number of first-line pipe-jacking machine operators by using the self-writing teaching materials, and cooperated with Japanese technical experts to develop a mud-water balance pipe-jacking machine suitable for Chinese soil layers. In 2004, Shaoxing Panshi Foundation Co., Ltd. was established. He has published 16 academic papers, and participated in the compilation of 'Pipe-jacking and Micro-tunnel Construction Acceptance Code' and 'Trenchless Engineering'.
Chunwen Yan is the deputy director of the Technical Center of China Geological Equipment Group Co., Ltd, the director of the editorial department of ‘Geological Equipment’, the professor-level senior engineer, the expert on government special allowance (engineering technology) of the State Council, the director of the Professional Committee of the China Society of Trenchless Technology, the executive director of the Geological Instrument Branch of China Instrument and Control Society, and the member of China Democratic League.
He systematically researches the new technology of trenchless underground pipeline construction, solves the problem of ‘lock road’ in underground pipeline construction for a long time, and makes fruitful pioneering work for the application, promotion, and development of trenchless technology in China. He has played an important role in the establishment of the Professional Committee of the China Society of Trenchless Technology and has made outstanding contributions to discipline construction and talent training.
Tong Taotao was born in 1989, obtained the B.S. degree in geology from Yangtze University in 2012, and has majored in English translation at the University of Science and Technology of China since 2022.
"About this title" may belong to another edition of this title.
General Terms and Conditions and Customer Information / Privacy Policy
I. General Terms and Conditions
§ 1 Basic provisions
(1) The following terms and conditions apply to all contracts that you conclude with us as a provider (AHA-BUCH GmbH) via the Internet platforms AbeBooks and/or ZVAB. Unless otherwise agreed, the inclusion of any of your own terms and conditions used by you will be objected to
(2) A consumer within the meaning of the following regulations is any natural person who concludes...
If you are a consumer you can withdraw from the contract in accordance with the following. Consumer means any natural person who is acting for purposes which are outside his trade, business, craft or profession.
Information regarding the right of withdrawal
Statutory right to withdraw
You have the right to withdraw from this contract within 14 days without giving any reason.
The withdrawal period will expire after 14 days from the day on which you acquire, or a third party other than the carrier and indicated by you acquires, physical possession of the last good or the last lot or piece.
To exercise the right of withdrawal, electronically fill in and submit a clear statement on our website, under "My Purchases" in "My Account". We will communicate to you an acknowledgement of receipt of such a withdrawal on a durable medium (e.g. by e-mail) without delay.
To meet the withdrawal deadline, it is sufficient for you to send your communication concerning your exercise of the right of withdrawal before the withdrawal period has expired.
Effects of withdrawal
If you withdraw from this contract, we will reimburse to you all payments received from you, including the costs of delivery (except for the supplementary costs arising if you chose a type of delivery other than the least expensive type of standard delivery offered by us).
We may make a deduction from the reimbursement for loss in value of any goods supplied, if the loss is the result of unnecessary handling by you.
We will make the reimbursement without undue delay, and not later than 14 days after the day on which we are informed about your decision to withdraw from this contract.
We will make the reimbursement using the same means of payment as you used for the initial transaction, unless you have expressly agreed otherwise; in any event, you will not incur any fees as a result of such reimbursement.
We may withhold reimbursement until we have received the goods back, or you have supplied evidence of having sent back the goods, whichever is the earliest.
You shall send back the goods or hand them over to AHA-BUCH GmbH, Einbeck, Germany, without undue delay and in any event not later than 14 days from the day on which you communicate your withdrawal from this contract to us. The deadline is met if you send back the goods before the period of 14 days has expired. You will have to bear the direct cost of returning the goods. You are only liable for any diminished value of the goods resulting from the handling other than what is necessary to establish the nature, characteristics and functioning of the goods.
Exceptions to the right of withdrawal
The right of withdrawal does not apply to:
We ship your order after we received them
for articles on hand latest 24 hours,
for articles with overnight supply latest 48 hours.
In case we need to order an article from our supplier our dispatch time depends on the reception date of the articles, but the articles will be shipped on the same day.
Our goal is to send the ordered articles in the fastest, but also most efficient and secure way to our customers.
| Order quantity | 30 to 40 business days | 7 to 14 business days |
|---|---|---|
| First item | £ 53.07 | £ 61.69 |
Delivery times are set by sellers and vary by carrier and location. Orders passing through Customs may face delays and buyers are responsible for any associated duties or fees. Sellers may contact you regarding additional charges to cover any increased costs to ship your items.