Technological Advancements in Waste Management: Challenges and Opportunities
New - Hardcover
Condition: New
Ships from Germany to U.S.A.
Quantity: Over 20 available
Add to basketCondition: New
Quantity: Over 20 available
Add to basketDieser Artikel ist ein Print on Demand Artikel und wird nach Ihrer Bestellung fuer Sie gedruckt.
Seller Inventory # 1734551080
This book consists of the select proceedings of the National Conference on Technological Advancements in Waste Management: Challenges and Opportunities (TAWMCO) - 2023. The book focuses on the prospective challenges and new emerging opportunities in the field of waste management. It primarily delves into the realm of challenges and nascent opportunities within the sphere of waste management, encompassing diverse facets such as industrial waste, municipal waste, and mining and mineral processing waste. It covers recent research in waste upcycling, transformation, recycling and methodical disposal, with a particular emphasis on cutting-edge technologies that underpin the sustainable management of waste. An integral component of this compilation is the exploration of technological breakthroughs in the realm of waste-to-energy. This book is poised to become an invaluable resource for scholars, researchers and seasoned professionals engaged in the field of waste management and allied disciplines.
Dr. Vipin Kumar is Associate Professor in the Department of Environmental Science and Engineering at IIT (ISM) Dhanbad, India. He earned his doctorate in environmental science and his postgraduate degree in microbiology. Dr. Kumar's areas of research interest include microbial remediation of various persistent pollutants, solid waste management, eco-restoration, microbial electrochemical systems and biological wastewater treatment, among others. He has published more than 80 research publications in various national and international journals of repute. He has completed numerous research and consulting projects funded by various ministries of the Government of India and industries of national importance. He has guided 14 Ph.D. scholars and 26 M.Tech dissertations. He has received the prestigious Inder Mohan Thapar Foundation (IMFT) research award for publication in recognition of excellence in Research. Dr. Kumar also serves as the Associate Dean of Faculty (recruitment), the Coordinator (Environment) for Earth, Energy and Environmental Research and the Head of the Laboratory of Environmental Microbiology at IIT (ISM) Dhanbad. He is a fellow of the Geological Society of India and is also a life member of various reputed organisations, including, but not limited to the Association of Microbiologists of India (AMI); The Mining, Geological and Metallurgical Institute of India (MGMI), Kolkata; Indian Water Works Association (IWWA) Mumbai; The Indian Science Congress Association, Kolkata and others. Recently he has been selected as a member of the prestigious National Academy of Sciences (NASI), Prayagraj, India.
Prof. Brajesh K. Dubey is Professor of Circular Engineering at the Department of Civil Engineering. He is also Chair of the School of Water Resources at the IIT Kharagpur, India. Prof. Dubey has more than 18 years of socially focused applied research experience within the broad fields of environmental, sustainable and resilient systems and circular economy approaches, addressing the nexus among sustainability, resiliency, infrastructure, waste, energy, health and the environment, including advocating the need of science-based policy. His research has been funded by several national and international agencies. such as the United Nations Industrial Development Organization (UNIDO), National Geographic Society (NGS), International Transport Forum (ITF), Organisation for Economic Cooperation and Development (OECD), World Resource Institute UK, Alliance to End Plastic Waste USA, and Circular Initiative, Canadian Foundation for Innovation (CFI), Natural Sciences and Engineering Research Council of Canada (NSERC), Indo-German Science and Technology Centre, Department of Science and Technology (DST) - Government of India, Florida Department of Environmental Protection, Auckland Regional Council and New Zealand, among others. He also has 4 years of industry experience as a Civil/Environmental Engineer at petrochemicals, refineries and offshore oil platforms. He has authored 150 journal papers, 4 edited books and conference proceedings, 25 book chapters and 27 full conference papers. Dr. Dubey has delivered more than 75 invited presentations in various countries, including Canada, USA, China, Germany, India, South Korea, Thailand, and UK. Prof. Dubey serves as Associate Editor or Editorial Board Members of 5 different journals, served on various professional committees, including the State Level Advisory Committee for Solid Waste Management, Ministry of Urban Development and Urban Affairs, Government of West Bengal, Kolkata, India. Prof. Dubey is also the co-chair and member of the Organic Waste Facility Public Liaison Committee, City of Guelph, Ontario, Canada.
Dr Kunwar D. Yadav is a Professor in the Department of Civil Engineering at Sardar Vallabhbhai National Institute of Technology (NIT), Surat, Gujarat, India. He received his Ph.D. from IIT Kanpur in 2009. He has over 17 years of experience in the field of environmental engineering as an academician. His area of interest is mainly focused on but not limited to ecological sanitation, solid waste management, composting and vermicomposting of organic waste, and reuse and recycling of greywater. He also handles many institute-level responsibilities and has also established himself in other various key positions, such as Environmental Auditor at the Gujarat Pollution Control Board, Solid Waste Management Expert at the National Green Tribunal, Waste Management Expert at Surat Municipal Corporation, and International Ecosan Expert at Capacity Building Trainer for Ecological Sanitation and National Compost Expert at GIZ/MoU&UA, New Delhi. He is Lifetime Member of various professional bodies like the Indian Water Works Association (IWWA), the International Water Association (IWA), the National Solid Waste Association of India (NSWAI), and the International Solid Waste Association (ISWA). He has published 8 book chapters, 01 edited book, 86 publications in various reputed international and national journals and conference proceedings. He has 9 granted patents and IPRs. Dr Yadav delivered more than 60 expert lectures in the Industry and academic institutes. Furthermore, Dr. Yadav has served as Principal Investigator and Co-Principal Investigator on numerous sponsored research projects.
"About this title" may belong to another edition of this title.
Instructions for revocation/
Standard Business Terms and customer information/ data protection declaration
Revocation right for consumers
(A ?consumer? is any natural person who concludes a legal transaction which, to an overwhelming extent, cannot be attributed to either his commercial or independent professional activities.)
Instructions for revocation
Revocation right
You have the right to revoke this contract within one month without specifying any reasons.
The revocation period is one month...
If you are a consumer you can withdraw from the contract in accordance with the following. Consumer means any natural person who is acting for purposes which are outside his trade, business, craft or profession.
Information regarding the right of withdrawal
Statutory right to withdraw
You have the right to withdraw from this contract within 14 days without giving any reason.
The withdrawal period will expire after 14 days from the day on which you acquire, or a third party other than the carrier and indicated by you acquires, physical possession of the last good or the last lot or piece.
To exercise the right of withdrawal, electronically fill in and submit a clear statement on our website, under "My Purchases" in "My Account". We will communicate to you an acknowledgement of receipt of such a withdrawal on a durable medium (e.g. by e-mail) without delay.
To meet the withdrawal deadline, it is sufficient for you to send your communication concerning your exercise of the right of withdrawal before the withdrawal period has expired.
Effects of withdrawal
If you withdraw from this contract, we will reimburse to you all payments received from you, including the costs of delivery (except for the supplementary costs arising if you chose a type of delivery other than the least expensive type of standard delivery offered by us).
We may make a deduction from the reimbursement for loss in value of any goods supplied, if the loss is the result of unnecessary handling by you.
We will make the reimbursement without undue delay, and not later than 14 days after the day on which we are informed about your decision to withdraw from this contract.
We will make the reimbursement using the same means of payment as you used for the initial transaction, unless you have expressly agreed otherwise; in any event, you will not incur any fees as a result of such reimbursement.
We may withhold reimbursement until we have received the goods back, or you have supplied evidence of having sent back the goods, whichever is the earliest.
You shall send back the goods or hand them over to moluna, Greven, Germany, without undue delay and in any event not later than 14 days from the day on which you communicate your withdrawal from this contract to us. The deadline is met if you send back the goods before the period of 14 days has expired. You will have to bear the direct cost of returning the goods. You are only liable for any diminished value of the goods resulting from the handling other than what is necessary to establish the nature, characteristics and functioning of the goods.
Exceptions to the right of withdrawal
The right of withdrawal does not apply to:
II. Kundeninformationen
Moluna GmbH
Engberdingdamm 27
48268 Greven
Deutschland
Telefon: 02571/5698933
E-Mail: abe@moluna.de
Wir sind nicht bereit und nicht verpflichtet, an Streitbeilegungsverfahren vor Verbraucherschlichtungsstellen teilzunehmen.
Die technischen Schritte zum Vertragsschluss, der Vertragsschluss selbst und die Korrekturmöglichkeiten erfolgen nach Maßgabe der Regelungen "Zustandekommen des Vertrages" unserer Allgemeinen Geschäftsbedingungen (Teil I.).
3.1. Vertragssprache ist deutsch .
3.2. Der vollständige Vertragstext wird von uns nicht gespeichert. Vor Absenden der Bestellung können die Vertragsdaten über die Druckfunktion des Browsers ausgedruckt oder elektronisch gesichert werden. Nach Zugang der Bestellung bei uns werden die Bestelldaten, die gesetzlich vorgeschriebenen Informationen bei Fernabsatzverträgen und die Allgemeinen Geschäftsbedingungen nochmals per E-Mail an Sie übersandt.
Die wesentlichen Merkmale der Ware und/oder Dienstleistung finden sich im jeweiligen Angebot.
5.1. Die in den jeweiligen Angeboten angeführten Preise sowie die Versandkosten stellen Gesamtpreise dar. Sie beinhalten alle Preisbestandteile einschließlich aller anfallenden Steuern.
5.2. Die anfallenden Versandkosten sind nicht im Kaufpreis enthalten. Sie sind über eine entsprechend bezeichnete Schaltfläche auf unserer Internetpräsenz oder im jeweiligen Angebot aufrufbar, werden im Laufe des Bestellvorganges gesondert ausgewiesen und sind von Ihnen zusätzlich zu tragen, soweit nicht die versandkostenfreie Lieferung zugesagt ist.
5.3. Die Ihnen zur Verfügung stehenden Zahlungsarten sind unter einer entsprechend bezeichneten Schaltfläche auf unserer Internetpräsenz oder im jeweiligen Angebot ausgewiesen.
5.4. Soweit bei den einzelnen Zahlungsarten nicht anders angegeben, sind die Zahlungsansprüche aus dem geschlossenen Vertrag sofort zur Zahlung fällig.
6.1. Die Lieferbedingungen, der Liefertermin sowie gegebenenfalls bestehende Lieferbeschränkungen finden sich unter einer entsprechend bezeichneten Schaltfläche auf unserer Internetpräsenz oder im jeweiligen Angebot.
Soweit im jeweiligen Angebot oder unter der entsprechend bezeichneten Schaltfläche keine andere Frist angegeben ist, erfolgt die Lieferung der Ware innerhalb von 3-5 Tagen nach Vertragsschluss (bei vereinbarter Vorauszahlung jedoch erst nach dem Zeitpunkt Ihrer Zahlungsanweisung).
6.2. Soweit Sie Verbraucher sind ist gesetzlich geregelt, dass die Gefahr des zufälligen Untergangs und der zufälligen Verschlechterung der verkauften Sache während der Versendung erst mit der Übergabe der Ware an Sie übergeht, unabhängig davon, ob die Versendung versichert oder unversichert erfolgt. Dies gilt nicht, wenn Sie eigenständig ein nicht vom Unternehmer benanntes Transportunternehmen oder eine sonst zur Ausführung der Versendung bestimmte Person beauftragt haben.
Sind Sie Unternehmer, erfolgt die Lieferung und Versendung auf Ihre Gefahr.
Die Mängelhaftung richtet sich nach der Regelung "Gewährleistung" in unseren Allgemeinen Geschäftsbedingungen (Teil I).
letzte Aktualisierung: 23.10.2019
| Order quantity | 26 to 60 business days | 26 to 60 business days |
|---|---|---|
| First item | £ 41.97 | £ 41.97 |
Delivery times are set by sellers and vary by carrier and location. Orders passing through Customs may face delays and buyers are responsible for any associated duties or fees. Sellers may contact you regarding additional charges to cover any increased costs to ship your items.