Taking Down Goliath
Pidd, Steven
New - Soft cover
Condition: New
Ships from Germany to U.S.A.
Quantity: Over 20 available
Add to basketCondition: New
Quantity: Over 20 available
Add to basketÜber den AutorrnrnSteve and his wife Em first began to deal with people exhibiting, at times, severe mental disorders around 1991-92. It began a journey into finding God s answers for resolving these problems, which continues to develop tod.
Seller Inventory # 571816409
Taking Down Goliath was written with the express intention of providing the body of Christ with a means of dealing with mental disorders. It was produced from a background of decades invested in ministering to the roots of these disorders, and predictably and consistently seeing them resolved through the work of the Holy Spirit. The publication proposes that God has the answers, and is desiring that people everywhere receive the freedom that He has promised and made available.
You can't send an army into battle without the equipment and resources needed to confront their foe. Many Christians would like to help with the harvest, but simply have never been properly equipped to be bringers of the good news in its entirety.
Perhaps we can offer a story from the natural world to illustrate the need of preparation for taking ground from your enemies. There was a time of training, equipping, and putting together of resources prior to the D-day landing in World War 2. For the Church to fulfill her purpose and be all that she can be, there needs to be provision of equipping and preparation from the Kingdom of God to fuel the push to present a full and complete Gospel.
Those planning the D-day landing knew that on June the 6th 1944, when the troops endeavoured to take ground, they would need backing and supply from beyond the battle front. I love the story of Operation Pluto. The allies had calculated that 60% of the needs of their armies as they began the invasion would be fuel. It was going to be a very important and needed resource for their success. As an example, a Sherman tank would travel only about 250 metres on a litre of fuel....4 litres to the kilometre. (.7 miles on a gallon) Operation Pluto was a series of pipelines laid under the sea from Britain to Normandie.
Altogether there were 17 lines, which totalled more than 800 kilometres of pipeline which were laid. They were able to deliver 4.5 million litres a day, and contributed a massive 180 million litres of fuel to the war effort. The existence and installation of these channels or conduits of resource, were a critical factor for success and victory. The point that I'm trying make is that the supply came from another place, and was delivered onto the battle front where it was most needed. These conduits joined both the place of resource, and the place of need.
For the Church, we could say that there is an unlimited supply of provision from the Kingdom of God. The mission is to get it from heaven to earth where it is needed in a practical way. It must be delivered to the battlefront through supply lines that are connected to both heaven and earth. That's us! Our knowledge of the ways of God in ministry are those access points for supply. Knowing how to release Gods provisions to mankind makes us the delivery mechanism that He has purposed and intended all along.
This publication is directed to helping us become a line of supply, addressing one of those areas of human need. Namely, we're presenting how to bring God's provision to the increasing problem of dealing with Mental disorders. Just as the requirement of fuel was 60% of what was needed to take back the ground in World War 2, easily 60% of the work of the Church would be in the area of Mental restoration in some form.
"About this title" may belong to another edition of this title.
Instructions for revocation/
Standard Business Terms and customer information/ data protection declaration
Revocation right for consumers
(A ?consumer? is any natural person who concludes a legal transaction which, to an overwhelming extent, cannot be attributed to either his commercial or independent professional activities.)
Instructions for revocation
Revocation right
You have the right to revoke this contract within one month without specifying any reasons.
The revocation period is one month...
Instructions for revocation/
Standard Business Terms and customer information/ data protection declaration
Revocation right for consumers
(A ‘consumer’ is any natural person who concludes a legal transaction which, to an overwhelming extent, cannot be attributed to either his commercial or independent professional activities.)
Instructions for revocation
Revocation right
You have the right to revoke this contract within one month without specifying any reasons.
The revocation period is one month with effect from the day,
on which you or a third party nominated by you, which is not the carrier, had taken possession of the products, provided you had ordered one or more products within the scope of a standard order and this/these product/products is/are delivered uniformly;
on which you or a third party nominated by you, which is not the carrier, had taken possession of the last product, provided you had ordered several products within the scope of a standard order and these products are delivered separately;
on which you or a third party nominated by you, which is not the carrier, had taken possession of the last part delivery or the last unit, provided you had ordered a product, which is delivered in several part deliveries or units;
In order to exercise your revocation right, you must inform us (Moluna GmbH, Münsterstr. 105, 48268 Greven, Telephone number: 02571/5 69 89 33, Fax number: 02571/5 69 89 30, E-Mail address: abe@moluna.de) of your decision to revoke this contract by means of a clear declaration (e.g. a letter sent via post, fax or email). You can use the enclosed specimen revocation form for this, which however is not mandatory.
In order to safeguard the revocation period, it is sufficient that you send the notification about the exercise of the revocation right before the expiry of the revocation period.
Consequences of the revocation
If you revoke this contract, we shall repay all the payments, which we received from you, including the delivery costs (with the exception of additional costs, which arise from that fact that you selected a form of delivery other than the most reasonable standard delivery offered by us), immediately and at the latest within 14 days from the day on which we received the notification about the revocation of this contract from you. We use the same means of payment, which you had originally used during the original transaction, for this repayment unless expressly agreed otherwise with you; you will not be charged any fees owing to this repayment.
We can refuse the repayment until the products are returned to us or until you have furnished evidence that you have sent the products back to us, depending on whichever is earlier.
You must return or transfer the products to us immediately and, in any case, at the latest within 14 days with effect from the day on which you inform us of the revocation of this contract. The deadline is maintained if you send the products before the expiry of the 14 day deadline.
You bear the direct costs for returning the products.
You must pay for any depreciation of the products only if this depreciation can be attributed to any handling with you that was not necessary for checking the condition, features and functionality of the products.
Criteria for exclusion or expiry
The revocation right is not available for contracts
for delivery of products, which are not prefabricated and for whose manufacturing an individual selection or stipulation by the consumer is important or which are clearly tailored to the personal requirements of the consumer;
for delivery of products, which can spoil quickly or whose use-by date would be exceeded quickly;
for delivery of alcoholic drinks, whose price was agreed at the time of concluding the contract, which however can be delivered 30 days after the conclusion of the contract at the earliest and whose current value depends on the fluctuations in the market, on which the entrepreneur has no influence;
for delivery of newspapers, periodicals or magazines with the exception of subscription contracts.
The revocation right expires prematurely in case of contracts
for delivery of sealed products, which are not suitable for return for reasons of health protection or hygiene if their seal has been removed after the delivery;
for delivery of products if they have been mixed inseparably with other goods after the delivery, owing to their condition;
for delivery of sound or video recording or computer software in a sealed package if the seal has been removed after the delivery.
Specimen - revocation form
(If you wish to revoke the contract, please fill up this form and send it back to us.)
To Moluna GmbH, Engberdingdamm 27, 48268 Greven, Fax number: 02571/5 69 89 30, Email address: abe@moluna.de :
I/we () herewith revoke the contract concluded by me/ us () regarding the purchase of the following products ()/
the provision of the following service ()
Ordered on ()/ received on ()
Name of the consumer(s)
Address of the consumer(s)
Signature of the consumer(s) (only in case of a notification on paper)
Date
(*) Cross out the incorrect option.
II. Kundeninformationen
Moluna GmbH
Engberdingdamm 27
48268 Greven
Deutschland
Telefon: 02571/5698933
E-Mail: abe@moluna.de
Wir sind nicht bereit und nicht verpflichtet, an Streitbeilegungsverfahren vor Verbraucherschlichtungsstellen teilzunehmen.
Die technischen Schritte zum Vertragsschluss, der Vertragsschluss selbst und die Korrekturmöglichkeiten erfolgen nach Maßgabe der Regelungen "Zustandekommen des Vertrages" unserer Allgemeinen Geschäftsbedingungen (Teil I.).
3.1. Vertragssprache ist deutsch .
3.2. Der vollständige Vertragstext wird von uns nicht gespeichert. Vor Absenden der Bestellung können die Vertragsdaten über die Druckfunktion des Browsers ausgedruckt oder elektronisch gesichert werden. Nach Zugang der Bestellung bei uns werden die Bestelldaten, die gesetzlich vorgeschriebenen Informationen bei Fernabsatzverträgen und die Allgemeinen Geschäftsbedingungen nochmals per E-Mail an Sie übersandt.
Die wesentlichen Merkmale der Ware und/oder Dienstleistung finden sich im jeweiligen Angebot.
5.1. Die in den jeweiligen Angeboten angeführten Preise sowie die Versandkosten stellen Gesamtpreise dar. Sie beinhalten alle Preisbestandteile einschließlich aller anfallenden Steuern.
5.2. Die anfallenden Versandkosten sind nicht im Kaufpreis enthalten. Sie sind über eine entsprechend bezeichnete Schaltfläche auf unserer Internetpräsenz oder im jeweiligen Angebot aufrufbar, werden im Laufe des Bestellvorganges gesondert ausgewiesen und sind von Ihnen zusätzlich zu tragen, soweit nicht die versandkostenfreie Lieferung zugesagt ist.
5.3. Die Ihnen zur Verfügung stehenden Zahlungsarten sind unter einer entsprechend bezeichneten Schaltfläche auf unserer Internetpräsenz oder im jeweiligen Angebot ausgewiesen.
5.4. Soweit bei den einzelnen Zahlungsarten nicht anders angegeben, sind die Zahlungsansprüche aus dem geschlossenen Vertrag sofort zur Zahlung fällig.
6.1. Die Lieferbedingungen, der Liefertermin sowie gegebenenfalls bestehende Lieferbeschränkungen finden sich unter einer entsprechend bezeichneten Schaltfläche auf unserer Internetpräsenz oder im jeweiligen Angebot.
Soweit im jeweiligen Angebot oder unter der entsprechend bezeichneten Schaltfläche keine andere Frist angegeben ist, erfolgt die Lieferung der Ware innerhalb von 3-5 Tagen nach Vertragsschluss (bei vereinbarter Vorauszahlung jedoch erst nach dem Zeitpunkt Ihrer Zahlungsanweisung).
6.2. Soweit Sie Verbraucher sind ist gesetzlich geregelt, dass die Gefahr des zufälligen Untergangs und der zufälligen Verschlechterung der verkauften Sache während der Versendung erst mit der Übergabe der Ware an Sie übergeht, unabhängig davon, ob die Versendung versichert oder unversichert erfolgt. Dies gilt nicht, wenn Sie eigenständig ein nicht vom Unternehmer benanntes Transportunternehmen oder eine sonst zur Ausführung der Versendung bestimmte Person beauftragt haben.
Sind Sie Unternehmer, erfolgt die Lieferung und Versendung auf Ihre Gefahr.
Die Mängelhaftung richtet sich nach der Regelung "Gewährleistung" in unseren Allgemeinen Geschäftsbedingungen (Teil I).
letzte Aktualisierung: 23.10.2019
| Order quantity | 16 to 45 business days | 16 to 45 business days |
|---|---|---|
| First item | £ 42.41 | £ 42.41 |
Delivery times are set by sellers and vary by carrier and location. Orders passing through Customs may face delays and buyers are responsible for any associated duties or fees. Sellers may contact you regarding additional charges to cover any increased costs to ship your items.