TPM for the Lean Factory: Innovative Methods and Worksheets for Equipment Management (Time-Tested Equipment Management Titles!)
Language: English
Published by Routledge, 1998
- Hardcover
- Used

Seller: -OnTimeBooks-, Phoenix, AZ, U.S.A.-OnTimeBooks-
AbeBooks seller since March 9, 2023
Condition: Used - Good
£ 30.31
Quantity: 1 available
Add to basketItem description from seller
A copy that has been read, remains in good condition. All pages are intact, and the cover is intact. The spine and cover show signs of wear. Pages can include notes and highlighting and show signs of wear, and the copy can include "From the library of" labels or previous owner inscriptions. 100% GUARANTEE! Shipped with delivery confirmation, if you're not satisfied with purchase please return item! Ships via media mail.
Seller Inventory # OTV.1563271915.G
- Title
- TPM for the Lean Factory: Innovative Methods and Worksheets for Equipment Management (Time-Tested Equipment Management Titles!)
- Author
- Arai, Keisuke
- Publisher
- Routledge
- Publication year
- 1998
- Condition
- good
- Binding
- Hardcover
- Language
- English
- ISBN 10
- 1563271915
- ISBN 13
- 9781563271915
Lean manufacturing cannot happen in a factory that lacks dependable, effective equipment. Breakdowns and processing defects translate into excess work-in-process and finished inventory, kept on hand "just in case." Recurring minor stoppages force employees to watch automated equipment that should run by itself. TPM gives a framework for addressing such problems, but many companies implement TPM at a superficial level, and the resulting productivity gains fall short of their potential. If your TPM implementation has resulted in posters and logos rather than a rise of productivity, how are you addressing this halt of progress? In TPM for the Lean Factory, authors Sekine and Arai teach you to identify and attack the key equipment-related problems and misunderstandings that make plants miss their lean manufacturing goals.
Written for companies with a basic TPM framework already in place, you'll learn three powerful approaches for cutting this waste:
- The new 5Ss: focusing on standard locations and labeling through the first 2Ss
- Instant maintenance: mastering quick repairs of minor equipment failures
- Improved setup operations: organizing the preparation to save time and prevent errors
Chapters on cell design, product and process quality factor testing, and daily equipment inspection give you additional weapons for fighting waste and low productivity. For practical application, an implementation overview summarizes the steps for each topic, keyed to a set of 50 adaptable worksheets and examples. A practical and supportive resource, TPM for the Lean Factory extends a fresh vision and focus to help you get top results from your TPM efforts.
"Synopsis" may belong to another edition of this title.
About the Author
"About the title" may belong to another edition of this title.
-OnTimeBooks-
Phoenix, AZ, U.S.A.
AbeBooks seller since March 9, 2023
Shipping rates within U.S.A.
| Item | 3 to 8 business days | 2 to 6 business days |
|---|---|---|
| First item | £ 0.00 | £ 2.96 |
Payment methods
Specialty
Used books of all typesSeller's business information
BookDrop LLC
601 S 54th Ave, STE 101
Phoenix, AZ U.S.A. 85043
Right of withdrawal
If you are a consumer you can withdraw from the contract in accordance with the following. Consumer means any natural person who is acting for purposes which are outside his trade, business, craft or profession.
Information regarding the right of withdrawal
Statutory right to withdraw
You have the right to withdraw from this contract within 14 days without giving any reason.
The withdrawal period will expire after 14 days from the day on which you acquire, or a third party other than the carrier and indicated by you acquires, physical possession of the last good or the last lot or piece.
To exercise the right of withdrawal, electronically fill in and submit a clear statement on our website, under "My Purchases" in "My Account". We will communicate to you an acknowledgement of receipt of such a withdrawal on a durable medium (e.g. by e-mail) without delay.
To meet the withdrawal deadline, it is sufficient for you to send your communication concerning your exercise of the right of withdrawal before the withdrawal period has expired.
Effects of withdrawal
If you withdraw from this contract, we will reimburse to you all payments received from you, including the costs of delivery (except for the supplementary costs arising if you chose a type of delivery other than the least expensive type of standard delivery offered by us).
We may make a deduction from the reimbursement for loss in value of any goods supplied, if the loss is the result of unnecessary handling by you.
We will make the reimbursement without undue delay, and not later than 14 days after the day on which we are informed about your decision to withdraw from this contract.
We will make the reimbursement using the same means of payment as you used for the initial transaction, unless you have expressly agreed otherwise; in any event, you will not incur any fees as a result of such reimbursement.
We may withhold reimbursement until we have received the goods back, or you have supplied evidence of having sent back the goods, whichever is the earliest.
You shall send back the goods or hand them over to -OnTimeBooks-, Phoenix, Arizona, U.S.A., without undue delay and in any event not later than 14 days from the day on which you communicate your withdrawal from this contract to us. The deadline is met if you send back the goods before the period of 14 days has expired. You will have to bear the direct cost of returning the goods. You are only liable for any diminished value of the goods resulting from the handling other than what is necessary to establish the nature, characteristics and functioning of the goods.
Exceptions to the right of withdrawal
The right of withdrawal does not apply to:
- The delivery of newspapers, journals or magazines with the exception of subscription contracts; and
- The supply of digital content which is not supplied on a tangible medium (e.g. on a CD or DVD) if you accepted when you placed your order that we could start to deliver it, and that you could not withdraw once delivery had started.