Systems Engineering: Tools and Methods for Engineers
Language: English
Published by CRC Pr I Llc, 2010
- Hardcover
- New

Seller: Revaluation Books, Exeter, United KingdomRevaluation Books
AbeBooks seller since January 6, 2003
Condition: New
£ 223.53
Quantity: 2 available
Add to basketItem description from seller
1st edition. 362 pages. 9.00x6.00x0.75 inches. In Stock.
Seller Inventory # x-1439809267
- Title
- Systems Engineering: Tools and Methods for Engineers
- Author
- Kamrani, Ali K. (Editor)/ Azimi, Maryam (Editor)
- Publisher
- CRC Pr I Llc
- Publication year
- 2010
- Condition
- Brand New
- Binding
- Hardcover
- Language
- English
- ISBN 10
- 1439809267
- ISBN 13
- 9781439809266
- Item weight
- 0.64 kilograms
With coverage that draws from diverse disciplines, Systems Engineering Tools and Methods demonstrates how, using integrated or concurrent engineering methods, you can empower development teams. Copiously illustrated with figures, charts, and graphs, the book offers methods, frameworks, techniques, and tools for designing, implementing, and managing large-scale systems and includes case studies that exhibit the effect of the systems engineering (SE) concept and its importance during the design and development of a complex system. These case studies provide realistic insights into SE methods.
Emphasizing the importance of an integrated approach to the design life cycle of complex systems, the book stresses the relationship between SE and project management. It reviews the principles of functional analysis as design activities, discusses verification, validation, and testing (VV& T) methodologies and tools for complex systems, and presents a framework for assessing technology integration at the systems level. It also delineates the development of a business process reengineering plan based on one used for the restructuring, retraining, and redeployment of elements of the Kennedy Space Center workforce.
The book includes examples of the design and development of several large complex systems from the DoD and NASA. Each system provides the backdrop for SE learning principles such as technical decision making, requirements definition, logistics support planning, verification, and risk mitigation. Discussions of a proposed integrated reliability management system for faster time-to-market electronics equipment, a new integrative approach to the allocation of adjustability, the importance of manufacturing with regard to designing components of a system, and methods and algorithms used in the solution of combinatorial optimization problems rounds out the coverage.
Waste, inadequate system performance, cost overruns, and schedule problems often result from failure to apply advanced systems engineering early in project development. By applying the methods outlined here, you can anticipate and avoid these costly roadblocks when possible, and quickly mitigate their damaging effects when necessary.
"Synopsis" may belong to another edition of this title.
About the Author
Ali K. Kamrani is an associate professor of industrial engineering and director of the industrial engineering graduate program studies. He is also the founding director of the Design and Free Form Fabrication Laboratory at the University of Houston. He has been a visiting professor at the Princess Fatimah Alnijris’s Research Chair for Advance Manufacturing Technology (AMT), Industrial Engineering Department at King Saud University, Riyadh. Saudi Arabia. He received his BS in electrical engineering in 1984, his MEng in electrical engineering in 1985, his MEng in computer science and engineering mathematics in 1987, and his PhD in industrial engineering in 1991, all from the University of Louisville, Louisville, Kentucky. His research interests include the fundamental application of systems engineering and its application in the design and development of complex systems. He is the editor in chief of the International Journal of Collaborative Enterprise and the International Journal of Rapid Manufacturing. He is a professional engineer at the state of Texas.
Maryam Azimi is a PhD candidate in the Department of Industrial Engineering at the University of Houston. Azimi received her BS in textile technology engineering (2001) and her MS in textile management (2004) from Tehran Polytechnic Amirkabir University), Tehran, Iran. Her current research interests include systems engineering, statistics, and application of data mining in health care and Computer Aided Design/Computer Aided Manufacturing (CAD/CAM).
"About the title" may belong to another edition of this title.
Revaluation Books
Exeter, United Kingdom
AbeBooks seller since January 6, 2003
Shipping rates from United Kingdom to U.S.A.
| Item | 7 to 14 business days | 2 to 3 business days |
|---|---|---|
| First item | £ 12.50 | £ 30.00 |
Payment methods
Seller's business information
Edward Bowditch Ltd
Exstowe, Exton
Exeter, United Kingdom EX3 0PP
Terms of sale
Legal entity name: Edward Bowditch Ltd
Legal entity form: Limited company
Business correspondence address: Exstowe, Exton, Exeter, EX3 0PP
Company registration number: 04916632
VAT registration: GB834241546
Authorised representative: Mr. E. Bowditch
Right of withdrawal
If you are a consumer you can withdraw from the contract in accordance with the following. Consumer means any natural person who is acting for purposes which are outside his trade, business, craft or profession.
Information regarding the right of withdrawal
Statutory right to withdraw
You have the right to withdraw from this contract within 14 days without giving any reason.
The withdrawal period will expire after 14 days from the day on which you acquire, or a third party other than the carrier and indicated by you acquires, physical possession of the last good or the last lot or piece.
To exercise the right of withdrawal, electronically fill in and submit a clear statement on our website, under "My Purchases" in "My Account". We will communicate to you an acknowledgement of receipt of such a withdrawal on a durable medium (e.g. by e-mail) without delay.
To meet the withdrawal deadline, it is sufficient for you to send your communication concerning your exercise of the right of withdrawal before the withdrawal period has expired.
Effects of withdrawal
If you withdraw from this contract, we will reimburse to you all payments received from you, including the costs of delivery (except for the supplementary costs arising if you chose a type of delivery other than the least expensive type of standard delivery offered by us).
We may make a deduction from the reimbursement for loss in value of any goods supplied, if the loss is the result of unnecessary handling by you.
We will make the reimbursement without undue delay, and not later than 14 days after the day on which we are informed about your decision to withdraw from this contract.
We will make the reimbursement using the same means of payment as you used for the initial transaction, unless you have expressly agreed otherwise; in any event, you will not incur any fees as a result of such reimbursement.
We may withhold reimbursement until we have received the goods back, or you have supplied evidence of having sent back the goods, whichever is the earliest.
You shall send back the goods or hand them over to Revaluation Books, Hounslow, United Kingdom, without undue delay and in any event not later than 14 days from the day on which you communicate your withdrawal from this contract to us. The deadline is met if you send back the goods before the period of 14 days has expired. You will have to bear the direct cost of returning the goods. You are only liable for any diminished value of the goods resulting from the handling other than what is necessary to establish the nature, characteristics and functioning of the goods.
Exceptions to the right of withdrawal
The right of withdrawal does not apply to:
- The delivery of newspapers, journals or magazines with the exception of subscription contracts; and
- The supply of digital content which is not supplied on a tangible medium (e.g. on a CD or DVD) if you accepted when you placed your order that we could start to deliver it, and that you could not withdraw once delivery had started.
Shipping terms
Orders usually dispatched within two working days.