System Reliability, Risk, Longevity, Sustainability and Optimal Decision Making
Language: English
Published by Taylor and Francis Ltd, GB, 2025
- Hardcover
- New

Seller: Rarewaves.com USA, London, London, United KingdomRarewaves.com USA
AbeBooks seller since June 11, 2025
Condition: New
£ 253.40
Quantity: Over 20 available
Add to basketItem description from seller
This book provides the concepts and methodologies of probabilistic structural performance assessments and predictions for deteriorating structures, with emphasis on marine structures and special consideration of system reliability, risk, longevity, sustainability, and optimal decision making. It introduces a comprehensive framework for time-dependent structural performance analysis, incorporating maintenance strategies to estimate and/or extend service life of infrastructure systems. The integration of structural health monitoring highlights the pivotal role of data analytics in addressing uncertainties and optimizing service life management. Progressing from foundational theories to advanced optimization strategies for inspection, monitoring, and maintenance planning. This book, which is a valuable resource for students, engineers, researchers, decision-makers, and policymakers, critically addresses economic considerations through cost-benefit utility and information analysis. Additionally, the exploration of multi-objective optimization and optimal decision-making processes presents the intricate trade-offs involved in the stewardship of marine and civil infrastructure. …
Seller Inventory # LU-9781032869445
- Title
- System Reliability, Risk, Longevity, Sustainability and Optimal Decision Making
- Author
- Dan M Frangopol, Sunyong Kim
- Publisher
- Taylor and Francis Ltd, GB
- Publication year
- 2025
- Condition
- New
- Binding
- Hardback
- Language
- English
- ISBN 10
- 1032869445
- ISBN 13
- 9781032869445
- Item weight
- 580 grams
"Synopsis" may belong to another edition of this title.
About the Author
Dan M. Frangopol is the inaugural holder of the Fazlur R. Khan Endowed Chair of Structural Engineering and Architecture at Lehigh University. He is widely recognized as a leading educator and pioneer in the field of lifecycle civil engineering. His main research interests are in the development and application of probabilistic and optimization concepts and methods to civil and marine engineering. He is the Founder and Editor-in-Chief of Structure and Infrastructure Engineering. Dr. Frangopol has achieved membership in eight academies, holds five honorary doctorates and 14 honorary professorships, and is a Distinguished Member of ASCE. In 2023, ASCE established the Dan M. Frangopol Medal for Life-Cycle Engineering of Civil Structures.
Sunyong Kim is Professor of Civil Engineering in the Department of Civil and Environmental Engineering at Wonkwang University, South Korea. Under the supervision of Prof. Dan M. Frangopol, he earned a Ph.D. in Structural Engineering in 2011 from Lehigh University. Dr. Kim is the recipient of the 2014 ASCE J. James R. Croes Medal, the 2014 IABMAS Junior Prize, the 2018 IALCCE Junior Award, and the 2022 ASCE Arthur M. Wellington Prize. He is an editorial board member of several international peer-reviewed journals. Dr. Kim is a member of ASCE, the Executive Board of IALCCE, and the Executive Committee of IABMAS.
"About the title" may belong to another edition of this title.
Rarewaves.com USA
London, London, United Kingdom
AbeBooks seller since June 11, 2025
Shipping rates from United Kingdom to U.S.A.
| Item | 9 to 14 business days | 9 to 14 business days |
|---|---|---|
| First item | £ 0.00 | £ 0.00 |
Payment methods
Seller's business information
RAREWAVES.COM LIMITED
Elsley Court, 20-22 Great Titchfield Street
London, United Kingdom W1W 8BE
Right of withdrawal
If you are a consumer you can withdraw from the contract in accordance with the following. Consumer means any natural person who is acting for purposes which are outside his trade, business, craft or profession.
Information regarding the right of withdrawal
Statutory right to withdraw
You have the right to withdraw from this contract within 14 days without giving any reason.
The withdrawal period will expire after 14 days from the day on which you acquire, or a third party other than the carrier and indicated by you acquires, physical possession of the last good or the last lot or piece.
To exercise the right of withdrawal, electronically fill in and submit a clear statement on our website, under "My Purchases" in "My Account". We will communicate to you an acknowledgement of receipt of such a withdrawal on a durable medium (e.g. by e-mail) without delay.
To meet the withdrawal deadline, it is sufficient for you to send your communication concerning your exercise of the right of withdrawal before the withdrawal period has expired.
Effects of withdrawal
If you withdraw from this contract, we will reimburse to you all payments received from you, including the costs of delivery (except for the supplementary costs arising if you chose a type of delivery other than the least expensive type of standard delivery offered by us).
We may make a deduction from the reimbursement for loss in value of any goods supplied, if the loss is the result of unnecessary handling by you.
We will make the reimbursement without undue delay, and not later than 14 days after the day on which we are informed about your decision to withdraw from this contract.
We will make the reimbursement using the same means of payment as you used for the initial transaction, unless you have expressly agreed otherwise; in any event, you will not incur any fees as a result of such reimbursement.
We may withhold reimbursement until we have received the goods back, or you have supplied evidence of having sent back the goods, whichever is the earliest.
You shall send back the goods or hand them over to Rarewaves.com USA, Unit 144 The Lightbox, 111 Power Road, W4 5PY, London, London, United Kingdom, without undue delay and in any event not later than 14 days from the day on which you communicate your withdrawal from this contract to us. The deadline is met if you send back the goods before the period of 14 days has expired. You will have to bear the direct cost of returning the goods. You are only liable for any diminished value of the goods resulting from the handling other than what is necessary to establish the nature, characteristics and functioning of the goods.
Exceptions to the right of withdrawal
The right of withdrawal does not apply to:
- The delivery of newspapers, journals or magazines with the exception of subscription contracts; and
- The supply of digital content which is not supplied on a tangible medium (e.g. on a CD or DVD) if you accepted when you placed your order that we could start to deliver it, and that you could not withdraw once delivery had started.
Shipping terms
Please note that we do not offer Priority shipping to any country.
We currently do not ship to the below countries:
Russia
Belarus
Ukraine
Please do not attempt to place orders with any of these countries as a ship to address - they will be cancelled.