Sustainable and Resilient Infrastructure Development in Africa s Changing Climate
New - Soft cover
Condition: New
Ships from Germany to U.S.A.
Quantity: Over 20 available
Add to basketCondition: New
Quantity: Over 20 available
Add to basketDieser Artikel ist ein Print on Demand Artikel und wird nach Ihrer Bestellung fuer Sie gedruckt.
Seller Inventory # 2814733753
This book contains the proceedings of ICIDA 2023. The conference is a platform for deliberating the delivery and management of infrastructure in Africa in the face of a changing climate. It helped to engage various stakeholders, in the continent and beyond, on how to develop and deliver sustainable and resilient infrastructure against climate variabilities. This book brings together the experiences, of participants, gathered through many years of research and practice across various fields of infrastructure development that can help shape the future of the African continent.
Emmanuel Adinyira (PhD) is a Professor of Construction Project Management in the Department of Construction Technology and Management, College of Art and Built Environment, Kwame Nkrumah University of Science and Technology (KNUST) Kumasi, Ghana. His areas of specialisation include construction project management, construction safety, health and environment and construction education and training. He has served as a guest editor, editor, sectional editor, editorial board member and reviewer for several national and international journals and conferences. He has over 200 publications and is widely cited in domian of construction management. His global experience in construction education and training includes working as a visiting scholar at Loughborough University, UK; the University of West of England, Bristol UK and the University of Johannesburg, SA. He has also served as a placement coach (local supervisor) for the Saxion University of Applied Science, Netherlands and Hochschule Fur Technik Stuttgart University of Applied Sciences Germany
Clifford Amoako (PhD) is an Associate Professor at the Department of Planning, KNUST- Kumasi Ghana. As a multidisciplinary development expert, consultant and planning academic, Clifford is passionate about urban development in Africa and the developing world. He holds a PhD in Geography and Environmental Science from Monash University in Melbourne, Australia and MPhil (Planning) from KNUST. His current teaching and research activities are in urban planning and governance, informal urbanization, urban flood vulnerability; transportation planning and poverty reduction. In the last 20 years, Clifford has provided consultancy services in urban and rural transport planning, strategic regional development planning, social impact assessment (SIA) and resettlement action plans (RAP) associated with infrastructure projects and climate change impact studies. The results of many of his research projects and consultancy services have been disseminated through academic papers and conference presentations. He has over 70 research and working papers and consultancy reports on urban informality, flood vulnerability and risk management to his credit.
Titus Ebenezer Kwofie (Ph.D) is a Senior Lecturer in the Department of Architecture, Kwame Nkrumah University of Science and Technology (KNUST), Kumasi, Ghana. His areas of specialization include: Building Informatics, Housing, Construction Technology and Construction Project Management (Communication & Managerial Efficiency). As a chartered Architect, He holds a BSc (Hons) & PG Dip. Degrees in Architecture, MPhil degree in Housing and PhD degree in Construction management with extensive industry and research experience in Construction Project Management & Housing. Titus has served as a reviewer for several indexed national and international journals and conferences. He has been involved in various typologies of projects and researched into a number of construction and housing related issues in Ghana and other African countries and have also participated in a number of international conferences and represented as a resource person in international workshops and postgraduate seminars.
Clinton Aigbavboa is a Professor at the Department of Construction Management and Quantity Surveying, University of Johannesburg, South Africa. He has extensive knowledge in practice, research, training and teaching. He is currently the Director, DSI/NRF Research Chair in sustainable construction management and leadership in the built environment; Director of the Construction Industry Development Board Centre of Excellence and the Sustainable Human Settlement and Construction Research Centre at the University of Johannesburg. Prof Aigbavboa has authored and co-authored more than 1000 accredited journal articles, conference papers, and book chapters. He is also an author of twenty-two (22) research books that were published with Springer Nature and CRC Press. Prof Aigbavboa is currently a visiting professor in the School of Civil Engineering of the Shandong University, China, visiting professor, in the Department of Civil Engineering of the University of Nigeria, Nsukka and an International Visiting scholar in the Department of Architecture of the Covenant University, Nigeria. He is also the editor of the Journal of Construction Project Management and Innovation (accredited by the DoHET) and has received national and international recognition in his field of research. He is rated by the South Africa National Research Foundation.
"About this title" may belong to another edition of this title.
Instructions for revocation/
Standard Business Terms and customer information/ data protection declaration
Revocation right for consumers
(A ?consumer? is any natural person who concludes a legal transaction which, to an overwhelming extent, cannot be attributed to either his commercial or independent professional activities.)
Instructions for revocation
Revocation right
You have the right to revoke this contract within one month without specifying any reasons.
The revocation period is one month...
If you are a consumer you can withdraw from the contract in accordance with the following. Consumer means any natural person who is acting for purposes which are outside his trade, business, craft or profession.
Information regarding the right of withdrawal
Statutory right to withdraw
You have the right to withdraw from this contract within 14 days without giving any reason.
The withdrawal period will expire after 14 days from the day on which you acquire, or a third party other than the carrier and indicated by you acquires, physical possession of the last good or the last lot or piece.
To exercise the right of withdrawal, electronically fill in and submit a clear statement on our website, under "My Purchases" in "My Account". We will communicate to you an acknowledgement of receipt of such a withdrawal on a durable medium (e.g. by e-mail) without delay.
To meet the withdrawal deadline, it is sufficient for you to send your communication concerning your exercise of the right of withdrawal before the withdrawal period has expired.
Effects of withdrawal
If you withdraw from this contract, we will reimburse to you all payments received from you, including the costs of delivery (except for the supplementary costs arising if you chose a type of delivery other than the least expensive type of standard delivery offered by us).
We may make a deduction from the reimbursement for loss in value of any goods supplied, if the loss is the result of unnecessary handling by you.
We will make the reimbursement without undue delay, and not later than 14 days after the day on which we are informed about your decision to withdraw from this contract.
We will make the reimbursement using the same means of payment as you used for the initial transaction, unless you have expressly agreed otherwise; in any event, you will not incur any fees as a result of such reimbursement.
We may withhold reimbursement until we have received the goods back, or you have supplied evidence of having sent back the goods, whichever is the earliest.
You shall send back the goods or hand them over to moluna, Greven, Germany, without undue delay and in any event not later than 14 days from the day on which you communicate your withdrawal from this contract to us. The deadline is met if you send back the goods before the period of 14 days has expired. You will have to bear the direct cost of returning the goods. You are only liable for any diminished value of the goods resulting from the handling other than what is necessary to establish the nature, characteristics and functioning of the goods.
Exceptions to the right of withdrawal
The right of withdrawal does not apply to:
II. Kundeninformationen
Moluna GmbH
Engberdingdamm 27
48268 Greven
Deutschland
Telefon: 02571/5698933
E-Mail: abe@moluna.de
Wir sind nicht bereit und nicht verpflichtet, an Streitbeilegungsverfahren vor Verbraucherschlichtungsstellen teilzunehmen.
Die technischen Schritte zum Vertragsschluss, der Vertragsschluss selbst und die Korrekturmöglichkeiten erfolgen nach Maßgabe der Regelungen "Zustandekommen des Vertrages" unserer Allgemeinen Geschäftsbedingungen (Teil I.).
3.1. Vertragssprache ist deutsch .
3.2. Der vollständige Vertragstext wird von uns nicht gespeichert. Vor Absenden der Bestellung können die Vertragsdaten über die Druckfunktion des Browsers ausgedruckt oder elektronisch gesichert werden. Nach Zugang der Bestellung bei uns werden die Bestelldaten, die gesetzlich vorgeschriebenen Informationen bei Fernabsatzverträgen und die Allgemeinen Geschäftsbedingungen nochmals per E-Mail an Sie übersandt.
Die wesentlichen Merkmale der Ware und/oder Dienstleistung finden sich im jeweiligen Angebot.
5.1. Die in den jeweiligen Angeboten angeführten Preise sowie die Versandkosten stellen Gesamtpreise dar. Sie beinhalten alle Preisbestandteile einschließlich aller anfallenden Steuern.
5.2. Die anfallenden Versandkosten sind nicht im Kaufpreis enthalten. Sie sind über eine entsprechend bezeichnete Schaltfläche auf unserer Internetpräsenz oder im jeweiligen Angebot aufrufbar, werden im Laufe des Bestellvorganges gesondert ausgewiesen und sind von Ihnen zusätzlich zu tragen, soweit nicht die versandkostenfreie Lieferung zugesagt ist.
5.3. Die Ihnen zur Verfügung stehenden Zahlungsarten sind unter einer entsprechend bezeichneten Schaltfläche auf unserer Internetpräsenz oder im jeweiligen Angebot ausgewiesen.
5.4. Soweit bei den einzelnen Zahlungsarten nicht anders angegeben, sind die Zahlungsansprüche aus dem geschlossenen Vertrag sofort zur Zahlung fällig.
6.1. Die Lieferbedingungen, der Liefertermin sowie gegebenenfalls bestehende Lieferbeschränkungen finden sich unter einer entsprechend bezeichneten Schaltfläche auf unserer Internetpräsenz oder im jeweiligen Angebot.
Soweit im jeweiligen Angebot oder unter der entsprechend bezeichneten Schaltfläche keine andere Frist angegeben ist, erfolgt die Lieferung der Ware innerhalb von 3-5 Tagen nach Vertragsschluss (bei vereinbarter Vorauszahlung jedoch erst nach dem Zeitpunkt Ihrer Zahlungsanweisung).
6.2. Soweit Sie Verbraucher sind ist gesetzlich geregelt, dass die Gefahr des zufälligen Untergangs und der zufälligen Verschlechterung der verkauften Sache während der Versendung erst mit der Übergabe der Ware an Sie übergeht, unabhängig davon, ob die Versendung versichert oder unversichert erfolgt. Dies gilt nicht, wenn Sie eigenständig ein nicht vom Unternehmer benanntes Transportunternehmen oder eine sonst zur Ausführung der Versendung bestimmte Person beauftragt haben.
Sind Sie Unternehmer, erfolgt die Lieferung und Versendung auf Ihre Gefahr.
Die Mängelhaftung richtet sich nach der Regelung "Gewährleistung" in unseren Allgemeinen Geschäftsbedingungen (Teil I).
letzte Aktualisierung: 23.10.2019
| Order quantity | 16 to 45 business days | 16 to 45 business days |
|---|---|---|
| First item | £ 42.06 | £ 42.06 |
Delivery times are set by sellers and vary by carrier and location. Orders passing through Customs may face delays and buyers are responsible for any associated duties or fees. Sellers may contact you regarding additional charges to cover any increased costs to ship your items.