Sustainable Pipe Jacking Technology in the Urban Environment
Language: English
Published by Springer, Berlin|Springer Nature Singapore|Springer, 2023
Series: Book 3 of 3 - Cities Research
- Softcover
- New

Seller: moluna, Greven, Germanymoluna
AbeBooks seller since July 9, 2020
Condition: New
£ 87.21
Quantity: Over 20 available
Add to basketItem description from seller
Seller Inventory # 812312020
- Title
- Sustainable Pipe Jacking Technology in the Urban Environment
- Author
- Ong, Dominic Ek Leong|Barla, Marco|Cheng, Jason Wen-Chieh|Choo, Chung Siung|Sun, Minmin|Peerun, Mohammud Irfaan
- Publisher
- Springer, Berlin|Springer Nature Singapore|Springer
- Publication year
- 2023
- Condition
- New
- Binding
- Soft cover
- Language
- English
- ISBN 10
- 9811693749
- ISBN 13
- 9789811693748
- Series
- Book 3 of 3: Cities Research
- Seller catalogs
- Importe
This book highlights recent advancements and innovations in trenchless technology via the adoption of combined micro-tunnelling and pipe-jacking techniques. This technique is more environmentally friendly, cost effective, less time-consuming and less disruptive compared to conventional open trench excavations for urban construction and urban infrastructure renewal projects. Pipe jacking is a non-destructive technique used in the installation of underground pipelines using a tunnel boring machine (TBM) and thrust forces derived from the hydraulic jack set-up in a deep jacking shaft. It is popular and commonly used worldwide for the installation of sewer and common services cable tunnels as well as for oil and gas pipelines.
"Synopsis" may belong to another edition of this title.
About the Author
Dr Marco Barla is Associate Professor at Politecnico di Torino, Italy, teaching 'Numerical methods in geotechnical engineering' and chairing the research group in the areas of rock mechanics, tunnelling and slope stability. He edited one book and over 150 scientific papers and holds a patent of an energy tunnel segment (Enertun). He also acts as a consultant in geotechnical engineering on projects related to slope stability, tunnelling, sewage systems, foundations, monitoring of geotechnical structures and radar interferometry. He is the Editor-in-Chief of the ASCE International Journal of Geomechanics and member of the Editorial Board of Tunnelling and Underground Space Technology and of Soils and Rocks.
Dr Cheng obtained his Master’s and Ph.D. Degrees in Geotechnical Engineering in 2005 and 2010, respectively, from the National Taipei University of Technology. His interests in research cover tunnelling and trenchless technologies, contaminated site remediation, and biomineralisation methods. He is currently the Council Member of the Chinese Society for Rock Mechanics and Engineering (CSRME), Shaanxi Society for Rock-Soil Mechanics and Engineering (SXRSME), and Professor at Xi'an University of Architecture and Technology. He also sits in the International Society for Soil Mechanics and Geotechnical Engineering (ISSMGE) Technical Committee TC213 Scour and Erosion and the Institue of Materials, Minerals and Mining (IOM3) Chartered Engineer Assessor Committee.Dr Choo obtained his BEng (Civil Engineering) (1st Class Honours) in 2010 and subsequently his Ph.D. in 2015, both from Swinburne University of Technology in the field of geotechnical engineering, focusing on micro-tunnelling in the form of pipe jacking. His research interests include rock characterisation, trenchless technologies, deep learning in tunnelling, discrete element modelling of soil behaviour, and geo-education. He is currently a Senior Lecturer at Swinburne University of Technology, Sarawak Campus, as well as being the Chairman for the Youth Wing of the Malaysian Geotechnical Society (MGS). He is a Chartered Professional Engineer (CPEng) registered with Engineers Australia. Dr. Choo is currently a nominated member of Technical Committees under the International Society for Soil Mechanics and Geotechnical Engineering (ISSMGE), namely TC105 Geo-Mechanics from Micro to Macro, and TC309 Machine Learning and Big Data.
Ms. Minmin Sun obtained her Bachelor of Civil Engineering Degree from Lanzhou University of Technology, China in 1982 and Master Degree of Project management from the Heriot- Watt University, UK in 2008. She is currently a director of W&M consultants, Singapore, the chairperson at Singapore Society for Trenchless Technology, a supervisor of Post Graduate students from the Xi’an Jiaotong University, China and adjunct lecturer of Universiti TeknologiPetronas, Malaysia. She has gained valuable experience in the trenchless industry through her working experience spanning over 3 decades in regions of China, Singapore, the Middle East, Vietnam and Cambodia.
Mr. Peerun graduated from Swinburne University of Technology with a Bachelor’s Degree in Civil Engineering in 2013 and Master of Engineering by Research in 2016. His research areas are in tunnelling technology and pipe-jacking, geomechanics testing, image processing using PIV technology and discrete element modelling. He is currently a Ph.D. scholar at Griffith University where his current research aims at studying interface shearing using synthetic particles for the application of tunnelling technology.
"About the title" may belong to another edition of this title.
Shipping rates from Germany to U.S.A.
| Item | 16 to 45 business days | 16 to 45 business days |
|---|---|---|
| First item | £ 42.09 | £ 42.09 |
Payment methods
- Bank Wire Transfer
- Check
- Paypal
Store description
Seller's business information
Moluna GmbH
Engberdingdamm 27
Greven, Germany 48268
Terms of sale
About Us
Legal website operator identification:
Moluna GmbH
Represented by the general manager Helge Blischke
Engberdingdamm 27
48268 Greven
Germany
Telephone: 02571/5698933
Telefax: 02571/5698930
E-Mail: abe@moluna.de
VAT No.: DE296281834
listed in the commercial register of the local court Steinfurt
Commercial register number - Part B of the commercial register - 10553
We are a member of the initiative „FairCommerce“ since 24.07.2015.
For more information, see: www.haendlerbund.de/faircommerce.
Right of withdrawal
If you are a consumer you can withdraw from the contract in accordance with the following. Consumer means any natural person who is acting for purposes which are outside his trade, business, craft or profession.
Information regarding the right of withdrawal
Statutory right to withdraw
You have the right to withdraw from this contract within 14 days without giving any reason.
The withdrawal period will expire after 14 days from the day on which you acquire, or a third party other than the carrier and indicated by you acquires, physical possession of the last good or the last lot or piece.
To exercise the right of withdrawal, electronically fill in and submit a clear statement on our website, under "My Purchases" in "My Account". We will communicate to you an acknowledgement of receipt of such a withdrawal on a durable medium (e.g. by e-mail) without delay.
To meet the withdrawal deadline, it is sufficient for you to send your communication concerning your exercise of the right of withdrawal before the withdrawal period has expired.
Effects of withdrawal
If you withdraw from this contract, we will reimburse to you all payments received from you, including the costs of delivery (except for the supplementary costs arising if you chose a type of delivery other than the least expensive type of standard delivery offered by us).
We may make a deduction from the reimbursement for loss in value of any goods supplied, if the loss is the result of unnecessary handling by you.
We will make the reimbursement without undue delay, and not later than 14 days after the day on which we are informed about your decision to withdraw from this contract.
We will make the reimbursement using the same means of payment as you used for the initial transaction, unless you have expressly agreed otherwise; in any event, you will not incur any fees as a result of such reimbursement.
We may withhold reimbursement until we have received the goods back, or you have supplied evidence of having sent back the goods, whichever is the earliest.
You shall send back the goods or hand them over to moluna, Greven, Germany, without undue delay and in any event not later than 14 days from the day on which you communicate your withdrawal from this contract to us. The deadline is met if you send back the goods before the period of 14 days has expired. You will have to bear the direct cost of returning the goods. You are only liable for any diminished value of the goods resulting from the handling other than what is necessary to establish the nature, characteristics and functioning of the goods.
Exceptions to the right of withdrawal
The right of withdrawal does not apply to:
- The delivery of newspapers, journals or magazines with the exception of subscription contracts; and
- The supply of digital content which is not supplied on a tangible medium (e.g. on a CD or DVD) if you accepted when you placed your order that we could start to deliver it, and that you could not withdraw once delivery had started.