Sustainable Design and Eco Technologies for Infrastructure
Book 356 of 362: Lecture Notes in Civil EngineeringNew - Hardcover
Condition: New
Ships from Germany to U.S.A.
Quantity: Over 20 available
Add to basketCondition: New
Quantity: Over 20 available
Add to basketDieser Artikel ist ein Print on Demand Artikel und wird nach Ihrer Bestellung fuer Sie gedruckt. This book presents the select proceedings of Civil Engineering Conference in the Asian Region (CECAR 9) hosted by the ICE (I) under the aegis of ACECC at Goa, India, from 21-23 September, 2022. It presents innovations and recent trends in civil engineeri.
Seller Inventory # 1199164971
This book presents the select proceedings of Civil Engineering Conference in the Asian Region (CECAR 9) hosted by the ICE (I) under the aegis of ACECC at Goa, India, from 21-23 September, 2022. It presents innovations and recent trends in civil engineering technologies, research and infrastructural developments and facilitates new ideas in the field of infrastructure design and construction. Various topics covered include innovative infrastructure, design practice and construction technology for sustainability, infrastructure development for smart and sustainable cities and affordable housing for developing economies, new construction materials and sustainability of infrastructure, geotechnical management, operation and safety, eco technology in pavement design and construction of roads and airport. This book will be useful for students, researchers and professionals working in the area of civil engineering.
Dr. Rajinder Ghai is currently working as Executive Engineer at Deptt., of Water Resources, Govt. of Punjab, Chandigarh, India. He obtained his B.Tech. (Civil) from Guru Nanak Dev Engg. College, Ludhiana (GNE). He awarded with State Gold-Medal in his graduation. He obtained his M.E. (Structures) and Ph.D. (Structures) degrees from Thapar Institute of Engg. & Tech. Patiala, Punjab with distinction. His major areas of research interests are; repair, rehabilitation and strengthening of concrete structures, structure analysis, concrete and steel structure design. Before joining the department, he served as assistant professor at GNE and structural engineer at Unitech Ltd., Noida. He also served as Sub-Divisional Engineer for Punjab Water Supply and Sewerage Board. Hence, he has blended experience of academician as well as industry. He has the vast design experience of earthen dams, bridges, sewerage treatment plants, water distribution system, solar power plants, canalregulators & cross drainage works, multi-storey RCC buildings, steel structures and Pre-Engg. buildings. He has published 11 papers in respected international journals and conferences. Dr. Ghai is actively associated with Institution of Civil Engineers (India) since 2006 and with ACECC (The Asian Civil Engineering Coordinating Council) since 2015. He is reviewer for KSCE (Springer) and Science Domain International journals. He is also associated with Tata Steel, India for good engineering practices awareness campaign.
Professor Emeritus Luh-Maan Chang received his B.S. degree from Department of Civil Engineering, National Cheng-Kung University at Taiwan in 1971. In 1974-77, he worked as a project engineer for Industry Technology Research Institute (ITRI) at Hsing-Chu, the Silicon Valley of Taiwan where he helped design/build the 1st Integrated Circuit Demonstration Plant of Taiwan. After getting his M.S. and Ph.D. degrees from the University of Texas at Austin, hetaught in the School of Building Construction, University of Florida at Gainesville from 1983 to 1985. From 1986 to 2009, Dr. Chang taught in the School of Civil Engineering, Purdue University at West Lafayette. After he took early retirement from Purdue, he continued teaching in the Civil Engineering Department of National Taiwan University till 2016. Throughout the years, he has continued to search for new theories or advanced technologies that can be applied to improve construction productivity. The major areas he has been involved with include Artificial Intelligence (AI), Image Processing and Patten Recognition, Nondestructive In-Place Testing, Precast Pre-Stressed Concrete Pavement, and Build-Operate-Transfer (BOT) Methods.
Since the early 2000’s when semiconductor manufacturing was scaled down to below 100 nanometer level, Dr. Chang has been trying to bridge civil engineering into the design and construction management of semiconductor fabrication plant (fab.) Because a high-tech fab is prerequisite to high-tech manufacturing, Dr. Chang devoted most of his later efforts to explore sustainable interdisciplinary methods in controlling contamination, and mitigating vibration and EMI. Presently, Dr. Chang is an adjunct professor and a researcher in the Climate Change and Sustainability Research Center of National Taiwan University. He has authored and co-authored over 250 publications, delivered 206 invited lectures worldwide, completed 20 PhD students and 75 MS students, and ever obtained 22 technical patents.Dr. R. Sharma is currently an assistant professor at the Department of Civil Engineering, Thapar Institute of Engineering and Technology Punjab. He obtained his B.E. (Civil) from RIMT Institute of Engineering and Technology, Punjab, and M.E (structural) and Ph.D. from the Thapar Institute of Engineering and Technology, Punjab. His major area of research interest includes repair, rehabilitation, retrofitting of structures, and use of waste material for sustainable repair product development. He has published 22 papers in a peer-reviewed journal, national and international conference. He is a reviewer of many prestigious engineering journals such as Journal of material in civil engineering (ASCE), Construction and building materials (Elsevier), Engineering structures (Elsevier), Advances in concrete construction (Techno Press), and structural materials (Wiley).
Dr. Anush. K. Chandrappa is currently holding a position of assistant professor at the School of Infrastructure, Indian Institute of Technology, Bhubaneshwar, India. He obtained his B.E. (Civil) from B M S College of Engineering (Karnataka), and M.Tech and Ph.D. from the Indian Institute of Technology Kharagpur, India. His major area of research interest includes, sustainable pavement engineering and construction practices, advanced pavement materials characterization, pavement design and evaluation, finite element analysis of pavement, urban climatology and urban heat island effects, Ultraviolet ageing of asphalt, energy synthesis from pavements and material science. He has published more than 50 research articles in peer-reviewed journals, national and international conferences. He is a reviewer of many prestigious engineering journals such as Journal of Testing and Evaluation (ASCE), Journal of material in civil engineering (ASCE), Construction and building materials (Elsevier), Advances in Civil Engineering Materials (ASCE), Journal of Transportation Engineering. Part-B (ASCE), Australian Journal of Civil Engineering (Taylor and Francis), and others.
"About this title" may belong to another edition of this title.
Instructions for revocation/
Standard Business Terms and customer information/ data protection declaration
Revocation right for consumers
(A ?consumer? is any natural person who concludes a legal transaction which, to an overwhelming extent, cannot be attributed to either his commercial or independent professional activities.)
Instructions for revocation
Revocation right
You have the right to revoke this contract within one month without specifying any reasons.
The revocation period is one month...
Instructions for revocation/
Standard Business Terms and customer information/ data protection declaration
Revocation right for consumers
(A ‘consumer’ is any natural person who concludes a legal transaction which, to an overwhelming extent, cannot be attributed to either his commercial or independent professional activities.)
Instructions for revocation
Revocation right
You have the right to revoke this contract within one month without specifying any reasons.
The revocation period is one month with effect from the day,
on which you or a third party nominated by you, which is not the carrier, had taken possession of the products, provided you had ordered one or more products within the scope of a standard order and this/these product/products is/are delivered uniformly;
on which you or a third party nominated by you, which is not the carrier, had taken possession of the last product, provided you had ordered several products within the scope of a standard order and these products are delivered separately;
on which you or a third party nominated by you, which is not the carrier, had taken possession of the last part delivery or the last unit, provided you had ordered a product, which is delivered in several part deliveries or units;
In order to exercise your revocation right, you must inform us (Moluna GmbH, Münsterstr. 105, 48268 Greven, Telephone number: 02571/5 69 89 33, Fax number: 02571/5 69 89 30, E-Mail address: abe@moluna.de) of your decision to revoke this contract by means of a clear declaration (e.g. a letter sent via post, fax or email). You can use the enclosed specimen revocation form for this, which however is not mandatory.
In order to safeguard the revocation period, it is sufficient that you send the notification about the exercise of the revocation right before the expiry of the revocation period.
Consequences of the revocation
If you revoke this contract, we shall repay all the payments, which we received from you, including the delivery costs (with the exception of additional costs, which arise from that fact that you selected a form of delivery other than the most reasonable standard delivery offered by us), immediately and at the latest within 14 days from the day on which we received the notification about the revocation of this contract from you. We use the same means of payment, which you had originally used during the original transaction, for this repayment unless expressly agreed otherwise with you; you will not be charged any fees owing to this repayment.
We can refuse the repayment until the products are returned to us or until you have furnished evidence that you have sent the products back to us, depending on whichever is earlier.
You must return or transfer the products to us immediately and, in any case, at the latest within 14 days with effect from the day on which you inform us of the revocation of this contract. The deadline is maintained if you send the products before the expiry of the 14 day deadline.
You bear the direct costs for returning the products.
You must pay for any depreciation of the products only if this depreciation can be attributed to any handling with you that was not necessary for checking the condition, features and functionality of the products.
Criteria for exclusion or expiry
The revocation right is not available for contracts
for delivery of products, which are not prefabricated and for whose manufacturing an individual selection or stipulation by the consumer is important or which are clearly tailored to the personal requirements of the consumer;
for delivery of products, which can spoil quickly or whose use-by date would be exceeded quickly;
for delivery of alcoholic drinks, whose price was agreed at the time of concluding the contract, which however can be delivered 30 days after the conclusion of the contract at the earliest and whose current value depends on the fluctuations in the market, on which the entrepreneur has no influence;
for delivery of newspapers, periodicals or magazines with the exception of subscription contracts.
The revocation right expires prematurely in case of contracts
for delivery of sealed products, which are not suitable for return for reasons of health protection or hygiene if their seal has been removed after the delivery;
for delivery of products if they have been mixed inseparably with other goods after the delivery, owing to their condition;
for delivery of sound or video recording or computer software in a sealed package if the seal has been removed after the delivery.
Specimen - revocation form
(If you wish to revoke the contract, please fill up this form and send it back to us.)
To Moluna GmbH, Engberdingdamm 27, 48268 Greven, Fax number: 02571/5 69 89 30, Email address: abe@moluna.de :
I/we () herewith revoke the contract concluded by me/ us () regarding the purchase of the following products ()/
the provision of the following service ()
Ordered on ()/ received on ()
Name of the consumer(s)
Address of the consumer(s)
Signature of the consumer(s) (only in case of a notification on paper)
Date
(*) Cross out the incorrect option.
II. Kundeninformationen
Moluna GmbH
Engberdingdamm 27
48268 Greven
Deutschland
Telefon: 02571/5698933
E-Mail: abe@moluna.de
Wir sind nicht bereit und nicht verpflichtet, an Streitbeilegungsverfahren vor Verbraucherschlichtungsstellen teilzunehmen.
Die technischen Schritte zum Vertragsschluss, der Vertragsschluss selbst und die Korrekturmöglichkeiten erfolgen nach Maßgabe der Regelungen "Zustandekommen des Vertrages" unserer Allgemeinen Geschäftsbedingungen (Teil I.).
3.1. Vertragssprache ist deutsch .
3.2. Der vollständige Vertragstext wird von uns nicht gespeichert. Vor Absenden der Bestellung können die Vertragsdaten über die Druckfunktion des Browsers ausgedruckt oder elektronisch gesichert werden. Nach Zugang der Bestellung bei uns werden die Bestelldaten, die gesetzlich vorgeschriebenen Informationen bei Fernabsatzverträgen und die Allgemeinen Geschäftsbedingungen nochmals per E-Mail an Sie übersandt.
Die wesentlichen Merkmale der Ware und/oder Dienstleistung finden sich im jeweiligen Angebot.
5.1. Die in den jeweiligen Angeboten angeführten Preise sowie die Versandkosten stellen Gesamtpreise dar. Sie beinhalten alle Preisbestandteile einschließlich aller anfallenden Steuern.
5.2. Die anfallenden Versandkosten sind nicht im Kaufpreis enthalten. Sie sind über eine entsprechend bezeichnete Schaltfläche auf unserer Internetpräsenz oder im jeweiligen Angebot aufrufbar, werden im Laufe des Bestellvorganges gesondert ausgewiesen und sind von Ihnen zusätzlich zu tragen, soweit nicht die versandkostenfreie Lieferung zugesagt ist.
5.3. Die Ihnen zur Verfügung stehenden Zahlungsarten sind unter einer entsprechend bezeichneten Schaltfläche auf unserer Internetpräsenz oder im jeweiligen Angebot ausgewiesen.
5.4. Soweit bei den einzelnen Zahlungsarten nicht anders angegeben, sind die Zahlungsansprüche aus dem geschlossenen Vertrag sofort zur Zahlung fällig.
6.1. Die Lieferbedingungen, der Liefertermin sowie gegebenenfalls bestehende Lieferbeschränkungen finden sich unter einer entsprechend bezeichneten Schaltfläche auf unserer Internetpräsenz oder im jeweiligen Angebot.
Soweit im jeweiligen Angebot oder unter der entsprechend bezeichneten Schaltfläche keine andere Frist angegeben ist, erfolgt die Lieferung der Ware innerhalb von 3-5 Tagen nach Vertragsschluss (bei vereinbarter Vorauszahlung jedoch erst nach dem Zeitpunkt Ihrer Zahlungsanweisung).
6.2. Soweit Sie Verbraucher sind ist gesetzlich geregelt, dass die Gefahr des zufälligen Untergangs und der zufälligen Verschlechterung der verkauften Sache während der Versendung erst mit der Übergabe der Ware an Sie übergeht, unabhängig davon, ob die Versendung versichert oder unversichert erfolgt. Dies gilt nicht, wenn Sie eigenständig ein nicht vom Unternehmer benanntes Transportunternehmen oder eine sonst zur Ausführung der Versendung bestimmte Person beauftragt haben.
Sind Sie Unternehmer, erfolgt die Lieferung und Versendung auf Ihre Gefahr.
Die Mängelhaftung richtet sich nach der Regelung "Gewährleistung" in unseren Allgemeinen Geschäftsbedingungen (Teil I).
letzte Aktualisierung: 23.10.2019
| Order quantity | 16 to 45 business days | 16 to 45 business days |
|---|---|---|
| First item | £ 42.26 | £ 42.26 |
Delivery times are set by sellers and vary by carrier and location. Orders passing through Customs may face delays and buyers are responsible for any associated duties or fees. Sellers may contact you regarding additional charges to cover any increased costs to ship your items.