Towards Sustainable Cities in Asia and the Middle East: Proceedings of the 1st GeoMEast International Congress and Exhibition, Egypt 2017 on Sustainable Civil Infrastructures
Language: English
Published by Springer, 2017
- Softcover
- New

Seller: California Books, Miami, FL, U.S.A.California Books
AbeBooks seller since October 27, 2023
Condition: New
£ 101.54
Quantity: Over 20 available
Add to basketSeller Inventory # I-9783319616445
- Title
- Towards Sustainable Cities in Asia and the Middle East: Proceedings of the 1st GeoMEast International Congress and Exhibition, Egypt 2017 on Sustainable Civil Infrastructures
- Publisher
- Springer
- Publication year
- 2017
- Condition
- New
- Binding
- Soft cover
- Language
- English
- ISBN 10
- 3319616447
- ISBN 13
- 9783319616445
- Series
- Book 2 of 59: Sustainable Civil Infrastructures
"Synopsis" may belong to another edition of this title.
About the Author
Editors asked to submit their biographies!
Dr John Kaiser S. Calautit,
Education:
2011 – 2013 Ph.D in Civil Engineering, University of Leeds, Leeds, UK
Dissertation Topic: The Application of Low Energy Technology Within the Built Environment
2006 – 2010 BEng Hons (Class I) in Mechanical Engineering Graduate, Heriot-Watt University, UK
Dissertation Topic: Numerical Investigation into the feasibility of integrating wind tower into residential buildings in the UAE.
Employment History:
2016 – 2017 Assistant Professor in Building Services Engineering, Department of Architecture and Built Environment, University of Nottingham
2015 – 2016 Senior Research Fellow: Energy2050, University of Sheffield
2013 – 2015 Post-Doctoral Research Fellow: School of Civil Engineering, University of Leeds (Thermal Comfort of Spectators and Players in Qatari Stadiums, Qatar National Research Fund 6th Cycle, NPRP 6-461-2-188)2011 – 2013 PhD Student (Research Assistant): School of Civil Engineering, University of Leeds, UK (Integration of Passive Ventilation and Novel Cooling Systems for Reducing Air Conditioning Loads in Buildings, Qatar National Research Fund 3rd Cycle, NPRP 09-138-2-059)
2010 – 2011 Mechanical Engineer: Gietart Middle East, UAE
Fernanda Rodrigues,
PhD in Civil Engineering by Universidade of Aveiro also holds a specialization in BIM Management. Is the responsible and lecturer of the curricular unities of: Site Construction Management and Legal Requirements, Construction Management and Safety Coordination, and Construction Modeling (BIM) in the Civil Engineering Department of University of Aveiro. Assessment of buildings’ deterioration state, development of a methodology to evaluate the deterioration /maintenance condition of buildings, energy efficiency of buildings, Facility Management and Building Information Modeling are some of the fields of her research. She is author and co-author of various publications in National and International Scientific Journals and Conferences.
Dr Hassam Nasarullah Chaudhry,
Education:
1. PGCAP, Heriot-Watt University, June 2016
2. Ph.D., University of Leeds, January 2014
3. BEng (Hons. - Class I). Heriot-Watt University, November 2010
Professional Recognition:
1. Associate Editor of Innovative Infrastructure Solutions, Imprint: Springer - ISSN: 2364-4176 (print), ISSN: 2364-4184 (electronic)
2. Editorial Board Member of American Journal of Heat and Mass Transfer, Imprint: CIP - ISSN: 2374-5398 (electronic)
3. Research Associate for Qatar National Research Fund 3rd Cycle project (NPRP 09-138-2-059) Project value: $1,050,000
4. Chartered Institute of Environmental Health Level 2 Award in 'Health and Safety in the Workplace', Leeds, U.K., 2013
5. 'Excellence in Engineering' award from Wood Group Production Facilities, Aberdeen, AB12 3AX, Scotland, U.K., 2009 and 2010
Haşim Altan, PhD,
Education
• PGCE, 2008, School of Architecture, University of Sheffield, UK
• PhD, 2004, School of Architecture, University of Sheffield, UK
• MArch, 1998, School of Architecture, University of Sheffield, UK
• DipArch, 1997, Department of Architecture, Istanbul Technical University, TurkeAcademic Experience
• Associate Professor & Chairman - University of Sharjah, UAE [2016-Present]
• Adjunct Professor - Canadian University Dubai, UAE [2015-16]
• Associate Professor (Reader) - British University in Dubai, UAE [2014-16]• Honorary Lecturer (Fellow) - Cardiff University, UK [2014-17]
• Senior Lecturer (Associate Professor) - University of Sheffield, UK [2008-14]
• Postdoctoral Research Associate (Fellow) - Universityof Sheffield, UK [2004-08]
• Associate Lecturer - University of Lincoln, UK [2007-10]• Associate Lecturer - Sheffield Hallam University, UK [2006-10]
• Visiting Professor - Brno University of Technology, Czech Republic [2008-13]
"About the title" may belong to another edition of this title.
California Books
Miami, FL, U.S.A.
AbeBooks seller since October 27, 2023
Shipping rates within U.S.A.
| Item | 3 to 7 business days | 2 to 5 business days |
|---|---|---|
| First item | £ 2.24 | £ 12.70 |
Payment methods
Store description
We have 20 years experience selling books worldwide! Friendly customer support. Your satisfaction guaranteed!
Specialty
All authorized categoriesSeller's business information
Miramar International Services LLC
FL, U.S.A.
Right of withdrawal
If you are a consumer you can withdraw from the contract in accordance with the following. Consumer means any natural person who is acting for purposes which are outside his trade, business, craft or profession.
Information regarding the right of withdrawal
Statutory right to withdraw
You have the right to withdraw from this contract within 14 days without giving any reason.
The withdrawal period will expire after 14 days from the day on which you acquire, or a third party other than the carrier and indicated by you acquires, physical possession of the last good or the last lot or piece.
To exercise the right of withdrawal, electronically fill in and submit a clear statement on our website, under "My Purchases" in "My Account". We will communicate to you an acknowledgement of receipt of such a withdrawal on a durable medium (e.g. by e-mail) without delay.
To meet the withdrawal deadline, it is sufficient for you to send your communication concerning your exercise of the right of withdrawal before the withdrawal period has expired.
Effects of withdrawal
If you withdraw from this contract, we will reimburse to you all payments received from you, including the costs of delivery (except for the supplementary costs arising if you chose a type of delivery other than the least expensive type of standard delivery offered by us).
We may make a deduction from the reimbursement for loss in value of any goods supplied, if the loss is the result of unnecessary handling by you.
We will make the reimbursement without undue delay, and not later than 14 days after the day on which we are informed about your decision to withdraw from this contract.
We will make the reimbursement using the same means of payment as you used for the initial transaction, unless you have expressly agreed otherwise; in any event, you will not incur any fees as a result of such reimbursement.
We may withhold reimbursement until we have received the goods back, or you have supplied evidence of having sent back the goods, whichever is the earliest.
You shall send back the goods or hand them over to California Books, Fort Wayne, Indiana, U.S.A., without undue delay and in any event not later than 14 days from the day on which you communicate your withdrawal from this contract to us. The deadline is met if you send back the goods before the period of 14 days has expired. You will have to bear the direct cost of returning the goods. You are only liable for any diminished value of the goods resulting from the handling other than what is necessary to establish the nature, characteristics and functioning of the goods.
Exceptions to the right of withdrawal
The right of withdrawal does not apply to:
- The delivery of newspapers, journals or magazines with the exception of subscription contracts; and
- The supply of digital content which is not supplied on a tangible medium (e.g. on a CD or DVD) if you accepted when you placed your order that we could start to deliver it, and that you could not withdraw once delivery had started.